Optimal pricing and financing strategies for leased equipment considering maintenance and lessees' options

被引:4
|
作者
Liu, Yanping [1 ]
Liu, Biyu [1 ,2 ]
Yang, Haidong [1 ]
机构
[1] Fuzhou Univ, Sch Econ & Management, Fuzhou, Peoples R China
[2] Fuzhou Univ, Logist Res Ctr, Fujian Social Sci Res Base, Fuzhou, Peoples R China
基金
中国国家自然科学基金;
关键词
Pricing and financing; Lessees' options; Leasing; Preventive maintenance; Game-theoretic; CONSTRAINED SUPPLY CHAIN; POLICIES; NEWSVENDOR; MODELS; BANK;
D O I
10.1016/j.ijpe.2024.109157
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Periodic payment for leased equipment may lead to capital constraint for lessors. In view of preventive maintenance (PM) strategy and lessees' options, the impact of different financing modes on lessor's pricing decisionmaking for leased equipment is studied. By considering the impact of age and usage on PM strategy and lessees' revenue, and lessees -different options to return, renew or purchase leased equipment after the lease expires, a game -theoretic model with respect to advance payment, bank loan and mixed financing modes is presented. The lessor's optimal pricing and financing strategies, as well as lessees' options are obtained by using noncooperative game, cooperative game and transfer -payment contract. The results show: (1) with the increase of bargaining level, the periodic rental price decreases; Under non -cooperative game, lessees renew the equipment first and then purchase it, while under cooperative game lessees always renew the lease. The lessor can motivate lessees to participate in cooperation through appropriate transfer -payment contract; (2) as the advance payment discount increases, the lessor shifts from advance payment to bank loan financing mode under non -cooperative game, while always adopts a financing mode including advance payment under cooperative game. Both leasing parties accept the advance payment financing mode only when the advance payment discount is within a certain range; (3) the increased usage of leased equipment brings larger PM and corrective maintenance (CM) burden to the lessor, which affects lessees' options and both leasing parties' profits. The lessor shall measure the PM and CM costs of leased equipment to maximize the profit.
引用
收藏
页数:14
相关论文
共 46 条
  • [31] Pricing and financing strategies of dual channel closed-loop supply chain considering capital-constrained manufacturer
    Xue, Meng
    Wu, Di
    Hu, Haiqing
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2024, 18 (02) : 275 - 301
  • [32] Optimal production and carbon reduction investment decision for manufacturers with leasing-selling strategies considering financing
    Liu, Biyu
    Shi, Yaling
    Yang, Haidong
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2024,
  • [33] Investigating reliability improvement of second-hand production equipment considering warranty and preventive maintenance strategies
    Darghouth, Mohamed Noomane
    Chelbi, Anis
    Ait-kadi, Daoud
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (16) : 4643 - 4661
  • [34] Joint Optimization of Maintenance and Spare Parts Inventory Strategies for Emergency Engineering Equipment Considering Demand Priorities
    Wang, Xiaoyue
    Wang, Jingxuan
    Ning, Ru
    Chen, Xi
    MATHEMATICS, 2023, 11 (17)
  • [35] Dynamic Programming Approach to Optimal Maintenance Scheduling of Substation Equipment Considering Life Cycle Cost and Reliability
    Laohanan, Surawit
    Banjerdpongchai, David
    2018 15TH INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING/ELECTRONICS, COMPUTER, TELECOMMUNICATIONS AND INFORMATION TECHNOLOGY (ECTI-CON), 2018, : 388 - 391
  • [36] Dynamic optimal pricing considering advertising and improvement quality strategies over product life-cycle horizon
    Bahrami, Hamideh
    Yaghoubi, Saeed
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2024,
  • [37] Optimal two-period pricing strategies in a dual-channel supply chain considering market change
    He, Peng
    Zhang, Guoqing
    Wang, Tong-Yuan
    Si, Yanhong
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 179
  • [38] Optimal production and maintenance strategies for manufacturing/ remanufacturing leasing system considering uncertain quality and carbon emission
    Liu, Yanping
    Liu, Biyu
    Yang, Haidong
    Luo, Kai
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2025, 280
  • [39] Multi-objective phased maintenance outsourcing strategy of complex equipment considering optimal interests of both parties to the contract
    Zhang X.
    Liu Q.
    Ye C.
    Li J.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (09): : 3055 - 3065
  • [40] Optimal Pricing Strategies in a Product and Service Supply Chain with Extended Warranty Service Competition considering Retailer Fairness Concern
    Zhao, Du
    Zhang, Xumei
    Ren, Tinghai
    Fu, Hongyong
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019