Effect of cutterhead configuration on tunnel face stability during shield machine maintenance outages

被引:2
|
作者
Yang, Yinzun [1 ,2 ]
Yuan, Dajun [1 ,2 ]
Jin, Dalong [1 ,2 ]
机构
[1] Beijing Jiaotong Univ, Minist Educ Urban Underground Engn, Key Lab, Beijing 100044, Peoples R China
[2] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 100044, Peoples R China
基金
中国国家自然科学基金;
关键词
tunnel face stability; cutterhead configuration; aperture ratio; pressure gradient; support ratio; SLURRY SHIELD; GROUNDWATER INFLOW; EXCAVATION FACE; YANGTZE-RIVER; MODEL; FAILURE; SOILS; DEFORMATION; PRESSURE; SEEPAGE;
D O I
10.1007/s11709-023-0930-9
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Owing to long-distance advancement or obstacles, shield tunneling machines are typically shut down for maintenance. Engineering safety during maintenance outages is determined by the stability of the tunnel face. Pressure maintenance openings are typically used under complicated hydrogeological conditions. The tunnel face is supported by a medium at the bottom of the excavation chamber and compressed air at the top. Owing to the high risk of face failure, the necessity of support pressure when cutterhead support is implemented and a method for determining the value of compressed air pressure using different support ratios must to be determined. In this study, a non-fully chamber supported rotational failure model considering cutterhead support is developed based on the upper-bound theorem of limit analysis. Numerical simulation is conducted to verify the accuracy of the proposed model. The results indicate that appropriately increasing the specific gravity of the supporting medium can reduce the risk of collapse. The required compressed air pressure increases significantly as the support ratio decreases. Disregarding the supporting effect of the cutterhead will result in a tunnel face with underestimated stability. To satisfy the requirement of chamber openings at atmospheric pressure, the stratum reinforcement strength and range at the shield end are provided based on different cutterhead aperture ratios.
引用
收藏
页码:522 / 532
页数:11
相关论文
共 50 条
  • [41] Analysis of working face stability during obstruction removal from a box tunnel machine
    Wei Liu
    Peixin Shi
    Miao Yu
    Pengjiao Jia
    Acta Geotechnica, 2022, 17 : 4627 - 4639
  • [42] Analysis of working face stability during obstruction removal from a box tunnel machine
    Liu, Wei
    Shi, Peixin
    Yu, Miao
    Jia, Pengjiao
    ACTA GEOTECHNICA, 2022, 17 (10) : 4627 - 4639
  • [43] Workface stability of shield tunnel considering arching effect
    College of Civil Engineering, Tongji University, Shanghai
    200092, China
    不详
    200092, China
    Tongji Daxue Xuebao, 2 (213-220): : 213 - 220
  • [44] Critical Face Pressure of a Tunnel Driven by a Shield Machine Considering Seismic Forces and Tunnel Shape Influence
    Jia, Yunfu
    Pei, Chengyuan
    Liang, Feng
    Li, Tianzheng
    BUILDINGS, 2024, 14 (06)
  • [45] Risk levels evaluation of shield machine during tunnel excavation
    YAN, Xianglin
    Journal of Railway Science and Engineering, 2022, 19 (08) : 2453 - 2460
  • [46] Influence of shield machine lifting on excavation during tunnel construction
    School Of Civil Engineering and Architecture of Henan University, Henan University, Kaifeng, Henan, China
    Electron. J. Geotech. Eng., 14 (6073-6084):
  • [47] Influence of shield machine lifting on excavation during tunnel construction
    Kong, Qingmei
    Electronic Journal of Geotechnical Engineering, 2015, 20 (14): : 6073 - 6084
  • [48] Study on the stability of large cross-river shield tunnel face with seepage
    Lu, Xilin
    Li, Fengdi
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 1371 - +
  • [49] An improved collapse analysis mechanism for the face stability of shield tunnel in layered soils
    Chen, Guang-hui
    Zou, Jin-feng
    Qian, Ze-hang
    GEOMECHANICS AND ENGINEERING, 2019, 17 (01) : 97 - 107
  • [50] Experimental study of the face stability of shield tunnel in sands under seepage condition
    Lu, Xilin
    Zhou, Yuncai
    Huang, Maosong
    Zeng, Sheng
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 74 : 195 - 205