Effect of cutterhead configuration on tunnel face stability during shield machine maintenance outages

被引:2
|
作者
Yang, Yinzun [1 ,2 ]
Yuan, Dajun [1 ,2 ]
Jin, Dalong [1 ,2 ]
机构
[1] Beijing Jiaotong Univ, Minist Educ Urban Underground Engn, Key Lab, Beijing 100044, Peoples R China
[2] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 100044, Peoples R China
基金
中国国家自然科学基金;
关键词
tunnel face stability; cutterhead configuration; aperture ratio; pressure gradient; support ratio; SLURRY SHIELD; GROUNDWATER INFLOW; EXCAVATION FACE; YANGTZE-RIVER; MODEL; FAILURE; SOILS; DEFORMATION; PRESSURE; SEEPAGE;
D O I
10.1007/s11709-023-0930-9
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Owing to long-distance advancement or obstacles, shield tunneling machines are typically shut down for maintenance. Engineering safety during maintenance outages is determined by the stability of the tunnel face. Pressure maintenance openings are typically used under complicated hydrogeological conditions. The tunnel face is supported by a medium at the bottom of the excavation chamber and compressed air at the top. Owing to the high risk of face failure, the necessity of support pressure when cutterhead support is implemented and a method for determining the value of compressed air pressure using different support ratios must to be determined. In this study, a non-fully chamber supported rotational failure model considering cutterhead support is developed based on the upper-bound theorem of limit analysis. Numerical simulation is conducted to verify the accuracy of the proposed model. The results indicate that appropriately increasing the specific gravity of the supporting medium can reduce the risk of collapse. The required compressed air pressure increases significantly as the support ratio decreases. Disregarding the supporting effect of the cutterhead will result in a tunnel face with underestimated stability. To satisfy the requirement of chamber openings at atmospheric pressure, the stratum reinforcement strength and range at the shield end are provided based on different cutterhead aperture ratios.
引用
收藏
页码:522 / 532
页数:11
相关论文
共 50 条
  • [21] Failure Mode and Stability of Excavation Face on Shield Tunnel Undercrossing Existing Tunnel
    Xue, Fei
    Zhang, Mengxi
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (09): : 2070 - 2080
  • [22] The face stability of shield tunnel traversing the fault fracture zone
    Wang, Lin
    Han, Kaihang
    Guo, Caixia
    Xie, Tingwei
    Luo, Jianjun
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2020, 53 : 93 - 98
  • [23] Model test of shield tunnel excavation face stability in sand
    Shen, Xiang
    Yuan, Dajun
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2015, 48 : 261 - 265
  • [24] Tunnel face stability and ground settlement in pressurized shield tunnelling
    Yi Su
    Guo-feng Wang
    Qing-hong Zhou
    Journal of Central South University, 2014, 21 : 1600 - 1606
  • [25] Tunnel face stability and ground settlement in pressurized shield tunnelling
    Su Yi
    Wang Guo-feng
    Zhou Qing-hong
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2014, 21 (04) : 1600 - 1606
  • [26] Stability analysis of shield tunnel face in multilayer soil with seepage
    Qiao Jin-li
    Zhang Yi-tong
    Gao Jian
    ROCK AND SOIL MECHANICS, 2010, 31 (05) : 1497 - 1502
  • [27] Face stability analysis of tunnel considering shield advance velocity
    Gao, Jian
    Zhang, Yi-Tong
    Yantu Lixue/Rock and Soil Mechanics, 2010, 31 (07): : 2232 - 2237
  • [28] Face stability analysis of tunnel considering shield advance velocity
    Gao Jian
    Zhang Yi-tong
    ROCK AND SOIL MECHANICS, 2010, 31 (07) : 2232 - +
  • [29] Study on Face Stability of Shield Tunnel in Sandy Cobble Stratum
    Wang L.
    Hu R.
    Ren C.
    Zhang C.
    Zhang J.
    Jiang Y.
    Liu C.
    Tongji Daxue Xuebao/Journal of Tongji University, 2023, 51 (09): : 1362 - 1371
  • [30] Tunnel face stability and ground settlement in pressurized shield tunnelling
    苏艺
    汪国锋
    周庆宏
    Journal of Central South University, 2014, 21 (04) : 1600 - 1606