Research on sustainable collaborative scheduling problem of multi-stage mixed flow shop for crankshaft components

被引:2
|
作者
Nie, Liang [1 ]
Zhang, Qinglei [2 ]
Feng, Mengyu [1 ]
Qin, Jiyun [2 ]
机构
[1] Shanghai Maritime Univ, China Inst FTZ Supply Chain, Pudong 201306, Shanghai, Peoples R China
[2] Shanghai Maritime Univ, Logist Engn Coll, Pudong 201306, Shanghai, Peoples R China
关键词
ALGORITHM; EFFICIENCY;
D O I
10.1038/s41598-023-49519-x
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The crankshaft manufacturing process primarily comprises machining, single jacket, and double jacket stages. These stages collectively produce substantial carbon emissions, which significantly impact the environment. Low-carbon energy development and humanity's future are closely related. To promote the sustainable development of crankshaft manufacturing enterprises and improve the production efficiency of crankshafts, research on sustainable collaborative scheduling problems in multi-stage mixed flow shop for crankshaft components is conducted. In addition, the transportation process of related workpieces in the crankshaft manufacturing process, which generally have a large mass, also produces substantial carbon emissions. This paper constructs a multi-objective integer optimization model based on the manufacturing process characteristics of crankshaft components, with minimizing the maximum manufacturing time and carbon emissions as optimization objectives. Considering the complexity of the problem, a comprehensive algorithm integrating moth-flame optimization and NSGA-III is used to solve the mathematical model. Through case experiments, the integrated algorithm is compared and analysed with four classic multi-objective optimization algorithms: NSGA-III, NSGA-II, MOEA/D, and MOPSO. The experiments demonstrate that the algorithm presented in this paper offers significantly enhanced optimization efficiency in solving the problem under study compared to other algorithms. Moreover, this paper compares multi-stage collaborative scheduling and non-collaborative scheduling in the crankshaft manufacturing process, ultimately demonstrating that collaborative scheduling is more conducive to the sustainable development of manufacturing enterprises. The results indicate that the annual carbon emissions can reduce about 3.6 ton.
引用
收藏
页数:17
相关论文
共 50 条
  • [41] The two stage assembly flow-shop scheduling problem with batching and delivery
    Kazemi, Hamed
    Mazdeh, Mohammad Mahdavi
    Rostami, Mohammad
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2017, 63 : 98 - 107
  • [42] A collaborative-learning multi-agent reinforcement learning method for distributed hybrid flow shop scheduling problem
    Di, Yuanzhu
    Deng, Libao
    Zhang, Lili
    SWARM AND EVOLUTIONARY COMPUTATION, 2024, 91
  • [43] A Collaborative Evolutionary Algorithm for Multi-objective Flexible Job Shop Scheduling Problem
    Li, X. Y.
    Gao, L.
    2011 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2011, : 997 - 1002
  • [44] Study of an optimal scheduling model in a multi-stage, flow-shop where setup times change due to machining sequencing
    Li, Yann-Liang
    Ueno, Toshio
    Sanbayashi, Yousuke
    Nippon Kikai Gakkai Ronbunshu, C Hen/Transactions of the Japan Society of Mechanical Engineers, Part C, 2002, 68 (08): : 2510 - 2515
  • [45] Multi-stage scheduling for sustainable manufacturing: balancing demand, resources, and social responsibilityMulti-stage scheduling for sustainable manufacturing...L. Wang
    Lingxin Wang
    Rosa Abbou
    Catherine da Cunha
    International Journal of Dynamics and Control, 2025, 13 (5)
  • [46] A Multi-stage and Parallel-Machine Scheduling Problem for Solar Cell Industry
    Wang, Li-chih
    Cheng, Chen-yang
    Chen, Tzu-li
    Chen, Yin-yann
    Wang, Chung-chun
    PROCEEDINGS OF 2012 3RD INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION (IEMI2012), 2013, : 201 - 212
  • [47] An integrated multi-stage vehicle routing and mixed-model job-shop-type robotic disassembly sequence scheduling problem for e-waste management system
    Malekkhouyan, Shiva
    Aghsami, Amir
    Rabbani, Masoud
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2021, 34 (11) : 1237 - 1262
  • [48] Optimization of class of multi-stage coupled integrated scheduling problem with process constraints
    Su Z.
    Deng C.
    Qian B.
    Hu R.
    Chen B.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2024, 30 (03): : 1072 - 1091
  • [49] Research on Two-Stage Hybrid Flow Shop Scheduling with Contiguous Machines
    Zhang Minghui
    Li Xiaofei
    2019 INTERNATIONAL CONFERENCE ON ROBOTS & INTELLIGENT SYSTEM (ICRIS 2019), 2019, : 458 - 461
  • [50] Multi-objective evolutionary algorithm-enabled multi-stage collaborative scheduling for automotive production
    Zhang, Xiangfei
    Li, Congbo
    Zhang, Jing
    Yang, Miao
    Wu, Wei
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 191