Research on sustainable collaborative scheduling problem of multi-stage mixed flow shop for crankshaft components

被引:2
|
作者
Nie, Liang [1 ]
Zhang, Qinglei [2 ]
Feng, Mengyu [1 ]
Qin, Jiyun [2 ]
机构
[1] Shanghai Maritime Univ, China Inst FTZ Supply Chain, Pudong 201306, Shanghai, Peoples R China
[2] Shanghai Maritime Univ, Logist Engn Coll, Pudong 201306, Shanghai, Peoples R China
关键词
ALGORITHM; EFFICIENCY;
D O I
10.1038/s41598-023-49519-x
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The crankshaft manufacturing process primarily comprises machining, single jacket, and double jacket stages. These stages collectively produce substantial carbon emissions, which significantly impact the environment. Low-carbon energy development and humanity's future are closely related. To promote the sustainable development of crankshaft manufacturing enterprises and improve the production efficiency of crankshafts, research on sustainable collaborative scheduling problems in multi-stage mixed flow shop for crankshaft components is conducted. In addition, the transportation process of related workpieces in the crankshaft manufacturing process, which generally have a large mass, also produces substantial carbon emissions. This paper constructs a multi-objective integer optimization model based on the manufacturing process characteristics of crankshaft components, with minimizing the maximum manufacturing time and carbon emissions as optimization objectives. Considering the complexity of the problem, a comprehensive algorithm integrating moth-flame optimization and NSGA-III is used to solve the mathematical model. Through case experiments, the integrated algorithm is compared and analysed with four classic multi-objective optimization algorithms: NSGA-III, NSGA-II, MOEA/D, and MOPSO. The experiments demonstrate that the algorithm presented in this paper offers significantly enhanced optimization efficiency in solving the problem under study compared to other algorithms. Moreover, this paper compares multi-stage collaborative scheduling and non-collaborative scheduling in the crankshaft manufacturing process, ultimately demonstrating that collaborative scheduling is more conducive to the sustainable development of manufacturing enterprises. The results indicate that the annual carbon emissions can reduce about 3.6 ton.
引用
收藏
页数:17
相关论文
共 50 条
  • [31] Solution strategies for multi-stage wafer probing scheduling problem with reentry
    Pearn, W. L.
    Chung, S. H.
    Yang, M. H.
    Shiao, K. P.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2008, 59 (05) : 637 - 651
  • [32] Economic lot and delivery scheduling problem for multi-stage supply chains
    Osman, Hany
    Demirli, Kudret
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 136 (02) : 275 - 286
  • [33] A study of the multi-stage flowshop scheduling problem with alternative operation assignments
    Futatsuishi, Y
    Watanabe, I
    Nakanishi, T
    MATHEMATICS AND COMPUTERS IN SIMULATION, 2002, 59 (1-3) : 73 - 79
  • [34] A case study on effect of grouping technique in a multi-stage hybrid flow shop
    Pugazhenthi, R.
    Xavior, M. Anthony
    Saravanan, R.
    INTERNATIONAL JOURNAL OF COMPUTING SCIENCE AND MATHEMATICS, 2016, 7 (01) : 42 - 53
  • [35] A multi-objective particle swarm for a flow shop scheduling problem
    Rahimi-Vahed, A. R.
    Mirghorbani, S. M.
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2007, 13 (01) : 79 - 102
  • [36] Optimization of production scheduling in two stage Flow Shop Scheduling problem with m equipotential machines at first stage
    Gupta, Deepak
    Goel, Sonia
    Mangla, Neeraj
    INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2022, 13 (03) : 1162 - 1169
  • [37] Optimization of production scheduling in two stage Flow Shop Scheduling problem with m equipotential machines at first stage
    Deepak Gupta
    Sonia Goel
    Neeraj Mangla
    International Journal of System Assurance Engineering and Management, 2022, 13 : 1162 - 1169
  • [38] A multi-objective particle swarm for a flow shop scheduling problem
    A. R. Rahimi-Vahed
    S. M. Mirghorbani
    Journal of Combinatorial Optimization, 2007, 13 : 79 - 102
  • [39] Research on Flexible Flow Shop Scheduling Problem with Variable Processing Times
    Gao, Zhijun
    Jia, Meiqi
    Han, Zhonghua
    Zhu, Boqiu
    PROCEEDINGS OF 2018 10TH INTERNATIONAL CONFERENCE ON MODELLING, IDENTIFICATION AND CONTROL (ICMIC), 2018,
  • [40] The Research of Trailer Scheduling Based on the Hybrid Flow Shop Problem with Blocking
    Zhang, Yu
    Wang, Shaomei
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3936 - 3940