Research on an Assembly Building Buffer Zone Based on Gray Critical Chain

被引:0
|
作者
Chen, Jiaying [1 ]
Ye, Ziyang [1 ]
Ye, Zehui [1 ]
Sun, Qiao [1 ]
机构
[1] Dalian Univ, Sch Architectural Engn, Dalian 116622, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 24期
关键词
assembled building; OPA; entropy weight method; grey critical chain; buffer size; optimize construction period; MANAGEMENT; DECISION; PROJECT;
D O I
10.3390/app132413174
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The complexity of construction in prefabricated buildings makes it vulnerable to uncertainty in project timelines, and traditional project timeline management is insufficient to control project timelines for prefabricated buildings. Therefore, research on project timeline management for prefabricated buildings is needed in order to optimize project timelines and improve project execution rates. This study proposed an improved method of setting prefabricated building buffer zones through the use of improved grey critical chain technology. Five major factors affecting project timelines in actual prefabricated construction projects were selected: personnel experience, degree of prefabrication, technical complexity, reasonableness of construction plans, and degree of construction space availability. The OPA technique was introduced and combined with the entropy weight method to improve the comprehensive weight coefficient of the grey critical chain calculation of the factors affecting the timeline. Other influencing coefficients were determined, and a new calculation method for the size of prefabricated building buffer zones was proposed. Monte Carlo simulations were conducted in Matlab on actual construction projects to ensure the scientific rationality of the improved method. The results showed that compared with the classical buffer calculation methods (cut-and-paste method, C&PM and square root standard deviation method, RSEM), the project timeline was reduced by 14.3% and 11.7%, respectively, using the improved method. The improved method not only reduces project uncertainties, but also achieves the goal of optimizing project timelines, and it is reasonable and effective. The results of the study provide a direction for the project timeline management of prefabricated building critical chains, and this method can be applied to the planning and management of prefabricated building buffer zones.
引用
下载
收藏
页数:15
相关论文
共 50 条
  • [41] Research on remanufacturing scheduling problem based on critical chain management
    Cui, Y.
    Guan, Z.
    He, C.
    Yue, L.
    5TH INTERNATIONAL CONFERENCE ON MANUFACTURING, OPTIMIZATION, INDUSTRIAL AND MATERIAL ENGINEERING, 2017, 215
  • [42] Research on Earned Value Based on the Critical Chain Management Method
    Zhang Changdong
    Zheng Shengqin
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1766 - 1770
  • [43] Calculation of Buffer Size on Critical Chain Based on Duration Distribution, Multiresource Constraints, and Relay Potential
    Nie, Xiangtian
    Zheng, Ye
    Gu, Xin
    Su, Bo
    Wang, Bo
    SCIENTIFIC PROGRAMMING, 2022, 2022
  • [44] The Setting Method of Project Buffer in Critical Chain Management of Mould manufacturing Project Based Reworking
    Hu, Changwei
    Chen, Xindu
    Wu, Lihua
    EQUIPMENT MANUFACTURING TECHNOLOGY AND AUTOMATION, PTS 1-3, 2011, 317-319 : 418 - 422
  • [45] Research on Information Flow of Prefabricated Building Supply Chain Based on BIM
    Bian, Jing
    He, Qinghua
    ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 131 - 138
  • [46] Research on BIM-based building information value chain reengineering
    Zhao Hui
    Xie Weishuang
    3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61
  • [47] Buffer sizing in critical chain project management by network decomposition *
    She, Bingling
    Chen, Bo
    Hall, Nicholas G.
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2021, 102
  • [48] Buffer Sized Technique in Critical Chain Management: A Fuzzy Approach
    Zhang Min
    Chen Rongqiu
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7393 - 7396
  • [49] Comparison of Fuzzy Buffer Size Algorithms in Critical Chain Scheduling
    Bai, Chunguang
    Gershon, Mark
    Wei, Xiaopeng
    INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, 2010, 13 (3B): : 893 - 903
  • [50] A Buffer Sizing Approach in Critical Chain Scheduling with Attributes Dependent
    Yang, Lixi
    Fu, Yan
    Li, Shiqi
    Huang, Baoxia
    Tao, Peng
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7676 - 7679