共 50 条
- [41] Research on remanufacturing scheduling problem based on critical chain management 5TH INTERNATIONAL CONFERENCE ON MANUFACTURING, OPTIMIZATION, INDUSTRIAL AND MATERIAL ENGINEERING, 2017, 215
- [42] Research on Earned Value Based on the Critical Chain Management Method CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1766 - 1770
- [44] The Setting Method of Project Buffer in Critical Chain Management of Mould manufacturing Project Based Reworking EQUIPMENT MANUFACTURING TECHNOLOGY AND AUTOMATION, PTS 1-3, 2011, 317-319 : 418 - 422
- [45] Research on Information Flow of Prefabricated Building Supply Chain Based on BIM ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 131 - 138
- [46] Research on BIM-based building information value chain reengineering 3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61
- [47] Buffer sizing in critical chain project management by network decomposition * OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2021, 102
- [48] Buffer Sized Technique in Critical Chain Management: A Fuzzy Approach 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7393 - 7396
- [49] Comparison of Fuzzy Buffer Size Algorithms in Critical Chain Scheduling INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, 2010, 13 (3B): : 893 - 903
- [50] A Buffer Sizing Approach in Critical Chain Scheduling with Attributes Dependent 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7676 - 7679