Research on an Assembly Building Buffer Zone Based on Gray Critical Chain

被引:0
|
作者
Chen, Jiaying [1 ]
Ye, Ziyang [1 ]
Ye, Zehui [1 ]
Sun, Qiao [1 ]
机构
[1] Dalian Univ, Sch Architectural Engn, Dalian 116622, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 24期
关键词
assembled building; OPA; entropy weight method; grey critical chain; buffer size; optimize construction period; MANAGEMENT; DECISION; PROJECT;
D O I
10.3390/app132413174
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The complexity of construction in prefabricated buildings makes it vulnerable to uncertainty in project timelines, and traditional project timeline management is insufficient to control project timelines for prefabricated buildings. Therefore, research on project timeline management for prefabricated buildings is needed in order to optimize project timelines and improve project execution rates. This study proposed an improved method of setting prefabricated building buffer zones through the use of improved grey critical chain technology. Five major factors affecting project timelines in actual prefabricated construction projects were selected: personnel experience, degree of prefabrication, technical complexity, reasonableness of construction plans, and degree of construction space availability. The OPA technique was introduced and combined with the entropy weight method to improve the comprehensive weight coefficient of the grey critical chain calculation of the factors affecting the timeline. Other influencing coefficients were determined, and a new calculation method for the size of prefabricated building buffer zones was proposed. Monte Carlo simulations were conducted in Matlab on actual construction projects to ensure the scientific rationality of the improved method. The results showed that compared with the classical buffer calculation methods (cut-and-paste method, C&PM and square root standard deviation method, RSEM), the project timeline was reduced by 14.3% and 11.7%, respectively, using the improved method. The improved method not only reduces project uncertainties, but also achieves the goal of optimizing project timelines, and it is reasonable and effective. The results of the study provide a direction for the project timeline management of prefabricated building critical chains, and this method can be applied to the planning and management of prefabricated building buffer zones.
引用
下载
收藏
页数:15
相关论文
共 50 条
  • [1] Research on the adaptive buffer sizing method based on the critical chain theory
    Ma, Li
    Guan, Zailin
    He, Min
    Shao, Xinyu
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2008, 36 (11): : 80 - 82
  • [2] Research on Buffer Calculation Model of Critical Chain Based on Adjacency Information Entropy
    Nie, Xiangtian
    Li, Min
    Lu, Jilan
    Wang, Bo
    BUILDINGS, 2023, 13 (04)
  • [3] 'Gray Zone' research
    Scott, William B.
    Aviation Week and Space Technology (New York), 2004, 160 (25): : 68 - 70
  • [4] Buffer sizing of critical chain based on attribute optimization
    Zhang, Junguang
    Song, Xiwei
    Diaz, Estrella
    CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2014, 22 (03): : 253 - 264
  • [5] BASIC RESEARCH - THE GRAY ZONE
    DJERASSI, C
    SCIENCE, 1993, 261 (5124) : 972 - 973
  • [6] Project Characteristics Based Buffer Sizing to Critical Chain Scheduling
    Guo Ze
    Zheng Zheng
    Lin ShuMin
    Yang RuiFeng
    PROCEEDINGS OF THE 31ST CHINESE CONTROL CONFERENCE, 2012, : 2400 - 2405
  • [7] Critical chain project buffer sizing based on resource constraints
    Zhang, Junguang
    Song, Xiwei
    Diaz, Estrella
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (03) : 671 - 683
  • [8] Buffer Setting Method of Critical Chain Based on Information Entropy
    Gong J.
    Hu T.
    Yao L.
    Zidonghua Xuebao/Acta Automatica Sinica, 2022, 48 (08): : 2039 - 2049
  • [9] Research on Integration of Project Schedule Buffer and Cost Buffer Based on Key Chain
    Li Xuemei
    INFORMATION ENGINEERING FOR MECHANICS AND MATERIALS RESEARCH, 2013, 422 : 321 - 326
  • [10] Research on the Buffer Sizing Approach in Critical Chain Scheduling in Perspective of Flexible Management
    Ma, Guofeng
    Li, Lei
    Chen, Zhiqin
    BUSINESS, ECONOMICS, FINANCIAL SCIENCES, AND MANAGEMENT, 2012, 143 : 61 - 68