IFC concepts in the execution phase of conventional tunneling projects

被引:4
|
作者
Huymajer, Marco [1 ]
Paskaleva, Galina [2 ]
Wenighofer, Robert [1 ]
Huemer, Christian [2 ]
Mazak-Huemer, Alexandra [3 ]
机构
[1] Univ Leoben, Chair Subsurface Engn, Erzherzog Johann Str 3-III, A-8700 Leoben, Austria
[2] TU Wien, Res Unit Business Informat, Favoritenstr 9, A-1040 Vienna, Austria
[3] Johannes Kepler Univ Linz, Dept Business Informat Software Engn, Altenberger Str 69, A-4040 Linz, Austria
关键词
BIM; IFC; Tunneling; Construction phase; Process; Labor; Equipment; Material; Digitalization; MODEL;
D O I
10.1016/j.tust.2023.105368
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The documentation process of conventional tunneling projects is time-consuming and costly. Building Information Modeling (BIM) has enabled substantial productivity gains in the Architecture, Engineering, & Construction (AEC) sector. However, BIM has only been marginally adopted in the execution phase of conventional tunneling projects. For this purpose, we propose a BIM model that facilitates fully digital and automated data exchange between project stakeholders. We use the Industry Foundation Classes (IFC) as a basis and identify concepts potentially useful to represent data from the execution phase of construction projects. We demonstrate how IFC concepts are utilized to represent a shift report of a conventional tunneling project. Thereby, we deliver a reference model as an implementation guide for software developers in this domain. This may serve as a blueprint for handling construction management data in a machine-readable format, laying the foundations for Big Open BIM in the execution phase of construction projects.
引用
收藏
页数:13
相关论文
共 50 条
  • [42] Toward a Methodology to Control Interoperability Improvement Projects Execution
    Taoudi, Abderrahim
    Bounabat, Bouchaib
    Elmir, Badr
    ENTERPRISE INTEROPERABILITY, IWEI 2013, 2013, 144 : 186 - 197
  • [43] The Situation of Cost Management in Execution of Building Projects in Syria
    Kasem, Sarab
    Alhaffar, Mohammad Bachar
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2011, 5 (04) : 510 - 520
  • [44] Empirical Factors Analysis in the Execution of House Building Projects
    Abhar, Hosein
    Farimani, All Ehsani
    Maghareh, Mohammad Reza
    SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT, PTS 1-3, 2012, 209-211 : 1396 - +
  • [45] A Heuristic Algorithm for Schedule Reconfiguration of Projects during Execution
    Haji, Maryam
    Darabi, Houshang
    PROCEEDINGS OF 2009 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATION, LOGISTICS AND INFORMATICS, 2009, : 400 - 405
  • [46] REMARKS ON PLANNING AND EXECUTION OF MAPPING PROJECTS IN TROPICAL AREAS
    ZARZYCKI, JM
    PHOTOGRAMMETRIA, 1969, 24 (01): : 7 - &
  • [47] THE PROCESSNAVIGATOR - FLEXIBLE PROCESS EXECUTION FOR PRODUCT DEVELOPMENT PROJECTS
    Faerber, Matthias
    Meerkamm, Stephanie
    Jablonski, Stefan
    ICED 09 - THE 17TH INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN, VOL 6: DESIGN METHODS AND TOOLS, PT 2, 2009, : 99 - +
  • [48] The execution of public-private partnership projects in the UAE
    Dulaimi, Mohammed Fadhil
    Alhashemi, Mohamed
    Ling, Florence Yean Yng
    Kumaraswamy, Mohan
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (04) : 393 - 402
  • [49] Preparation and execution of final year student projects on the cloud
    Vakaloudis, Alex
    Cahill, Brian
    O'Leary, Christian
    Challa, Deepa
    2020 IEEE FRONTIERS IN EDUCATION CONFERENCE (FIE 2020), 2020,
  • [50] Particle characteristics of conventional and resonant tunneling
    Kira, M
    Tittonen, I
    Stenholm, S
    PHYSICA SCRIPTA, 1996, 54 (06): : 549 - 562