IFC concepts in the execution phase of conventional tunneling projects

被引:4
|
作者
Huymajer, Marco [1 ]
Paskaleva, Galina [2 ]
Wenighofer, Robert [1 ]
Huemer, Christian [2 ]
Mazak-Huemer, Alexandra [3 ]
机构
[1] Univ Leoben, Chair Subsurface Engn, Erzherzog Johann Str 3-III, A-8700 Leoben, Austria
[2] TU Wien, Res Unit Business Informat, Favoritenstr 9, A-1040 Vienna, Austria
[3] Johannes Kepler Univ Linz, Dept Business Informat Software Engn, Altenberger Str 69, A-4040 Linz, Austria
关键词
BIM; IFC; Tunneling; Construction phase; Process; Labor; Equipment; Material; Digitalization; MODEL;
D O I
10.1016/j.tust.2023.105368
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The documentation process of conventional tunneling projects is time-consuming and costly. Building Information Modeling (BIM) has enabled substantial productivity gains in the Architecture, Engineering, & Construction (AEC) sector. However, BIM has only been marginally adopted in the execution phase of conventional tunneling projects. For this purpose, we propose a BIM model that facilitates fully digital and automated data exchange between project stakeholders. We use the Industry Foundation Classes (IFC) as a basis and identify concepts potentially useful to represent data from the execution phase of construction projects. We demonstrate how IFC concepts are utilized to represent a shift report of a conventional tunneling project. Thereby, we deliver a reference model as an implementation guide for software developers in this domain. This may serve as a blueprint for handling construction management data in a machine-readable format, laying the foundations for Big Open BIM in the execution phase of construction projects.
引用
收藏
页数:13
相关论文
共 50 条
  • [31] Teaching Operating Systems Concepts with Execution Visualization
    Giraldeau, Francis
    Dagenais, Michel R.
    Boucheneb, Hanifa
    2014 ASEE ANNUAL CONFERENCE, 2014,
  • [32] INTEGRATION OF PLANNING AND EXECUTION OPERATIONS - THEORY AND CONCEPTS
    DOSHI, BT
    KRUPKA, DC
    AT&T TECHNICAL JOURNAL, 1990, 69 (04): : 90 - 98
  • [33] Building Information Modeling in tunneling - digital design and construction of tunneling projects
    Konig, Markus
    Rahm, Tobias
    Nagel, Felix
    Speier, Ludger
    BAUTECHNIK, 2017, 94 (04) : 227 - 231
  • [34] How Conventional Wisdom Derails Strategy Execution
    Sull, Donald
    Homkes, Rebecca
    Sull, Charles
    HARVARD BUSINESS REVIEW, 2015, 93 (05) : 16 - 16
  • [35] ALLERGY - CONVENTIONAL AND ALTERNATIVE CONCEPTS
    KAY, AB
    LESSOF, MH
    JOURNAL OF THE ROYAL COLLEGE OF PHYSICIANS OF LONDON, 1992, 26 (03): : 260 - 264
  • [37] Execution of tunnel construction projects – analysis of the current situation
    Hödl R.
    Bach D.
    Lehner W.
    Geomechanik und Tunnelbau, 2021, 14 (06): : 771 - 780
  • [38] Cost reduction strategies in Indian power projects execution
    Swamy, MSK
    PROCEEDINGS OF THE AMERICAN POWER CONFERENCE, VOL 61 - I AND II, 1999, 61 : 307 - 312
  • [39] Difficulties of newcomers joining software projects already in execution
    Matturro, Gerardo
    Barrella, Karina
    Benitez, Patricia
    PROCEEDINGS 2017 INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE AND COMPUTATIONAL INTELLIGENCE (CSCI), 2017, : 993 - 998
  • [40] Analysis on Components Complexity During Execution of Construction Projects
    Kumar, N. V. Achuth
    Prakash, S. S. Bhanu
    INTERNATIONAL JOURNAL OF ENGINEERING, 2016, 29 (09): : 1227 - 1234