Performance Assessment of Four Grid-Connected Solar Photovoltaic Technologies under Similar Environmental Conditions in Nigeria

被引:2
|
作者
Owolabi, Abdulhameed Babatunde [1 ,2 ]
Yakub, Abdulfatai Olatunji [2 ]
Luqman, Raji [3 ,4 ]
Same, Noel Ngando [2 ]
Suh, Dongjun [2 ]
机构
[1] Kyungpook Natl Univ, Reg Leading Res Ctr Smart Energy Syst, Sangju 37224, South Korea
[2] Kyungpook Natl Univ, Dept Convergence & Fus Syst Engn, Sangju 37224, South Korea
[3] Fed Polytech Mubi, Sch Engn, Dept Mech Engn, Mubi, Adamawa State, Nigeria
[4] Fed Polytech Mubi, Ctr Entrepreneurship Dev, Mubi, Adamawa State, Nigeria
基金
新加坡国家研究基金会;
关键词
PV SYSTEM; INTERNATIONAL AIRPORT; MODULE TECHNOLOGIES; CLIMATIC CONDITIONS; POWER-PLANT; REGION; OPTIMIZATION; EFFICIENCY; VIABILITY; DRY;
D O I
10.1155/2023/9458440
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This research presents the performance of four grid-connected solar photovoltaic (PV) systems installed at the Adamawa State College of Health Technology, Mubi, Adamawa, Nigeria. The system consists of 3.5 kWp each of four different PV technologies. The mis and psi cells manufactured by China Sunergy and Conergy comprised 14 modules with a power capacity of 250 watts. The asi produced by Moser Baer consists of 10 modules, each having 350 watts, and the CIS manufactured by Solar Frontier has 20 modules, each having 175 watts. The PV was observed and recorded data from January 2022 to December 2022. The system performance was analyzed using eleven evaluation criteria. Based on the technical assessment of the systems for this location, the asi solar PV has the best annual performance. It demonstrated the most favorable performance ratio (PR) and capacity factor (CF) of 90.7% and 27.6%, respectively, when considering energy output, system yields, performance ratio, and capacity ratio. On the other hand, the msi system, manufactured by China Sunergy, exhibited significant efficiencies at both the panel and system levels, with values of 14.3% and 13.7%, respectively. This system stood out for its minimal overall losses, recorded at 7.78 hours, demonstrating superior efficiency and lower overall losses than the other systems under study. This study is critical because the result will provide valuable information to researchers in identifying the appropriate PV systems suitable for Nigeria. In addition, it will assist PV installers and manufacturers with updated information on the PV system with the best performance.
引用
收藏
页数:19
相关论文
共 50 条
  • [11] Evaluation of a grid-connected photovoltaic system and in-situ characterization of photovoltaic modules under the environmental conditions of Mexico City
    Santana-Rodriguez, G.
    Vigil-Galan, O.
    Jimenez-Olarte, D.
    Contreras-Puente, G.
    Monroy, B. M.
    Escamilla-Esquivel, A.
    REVISTA MEXICANA DE FISICA, 2013, 59 (02) : 88 - 94
  • [12] Performance assessment of a 30.26 kW grid-connected photovoltaic plant in Egypt
    Hassan, Amal A.
    Atia, Doaa M.
    El- Madany, Hanaa T.
    Eliwa, Aref Y.
    CLEAN ENERGY, 2024, 8 (06): : 120 - 133
  • [13] Performance Assessment of Frequency Selective Grounding for Grid-Connected Photovoltaic Systems
    Saleh, S. A.
    Kanukollu, Saikrishna
    Al-Durra, Ahmed
    IEEE TRANSACTIONS ON POWER DELIVERY, 2023, 38 (02) : 1138 - 1147
  • [14] Modeling and Performance Analysis of a Grid-Connected Photovoltaic System with Advanced Controller considering Varying Environmental Conditions
    Babu, P. Chandra
    Kumar, Devineni Gireesh
    Sireesha, Nagineni Venkata
    Pushkarna, Mukesh
    Prashanth, B. Venkata
    Dsnmrao
    Kotb, Hossam M.
    AboRas, Kareem M.
    Bajaj, Mohit
    Alphonse, Sadam
    INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 2023, 2023
  • [15] An Overview of Multilevel Inverters Lifetime Assessment for Grid-Connected Solar Photovoltaic Applications
    Nyamathulla, Shaik
    Chittathuru, Dhanamjayulu
    Muyeen, S. M.
    ELECTRONICS, 2023, 12 (08)
  • [16] Performance Prediction of a Grid-Connected Photovoltaic Plant
    Bouzerdoum, M.
    Mellit, A.
    2017 5TH INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING - BOUMERDES (ICEE-B), 2017,
  • [17] Performance analysis of a grid-connected photovoltaic system
    Sidrach-de-Cardona, M
    López, LM
    ENERGY, 1999, 24 (02) : 93 - 102
  • [18] Performance and feasibility assessment of a 1.4 kW roof top grid-connected photovoltaic power system under desertic weather conditions
    Kazem, Hussein A.
    Khatib, Tamer
    Sopian, K.
    Elmenreich, Wilfried
    ENERGY AND BUILDINGS, 2014, 82 : 123 - 129
  • [19] Problems and Solutions of Grid-Connected in Photovoltaic Solar Plants
    Arici, Nursal
    Iskender, Asli
    JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI, 2020, 23 (01): : 215 - 222
  • [20] Performance assessment of solar photovoltaic technologies under different climatic conditions in Brazil
    do Nascimento, Lucas Rafael
    Braga, Marilia
    Campos, Rafael Antunes
    Naspolini, Helena Flavia
    Ruther, Ricardo
    RENEWABLE ENERGY, 2020, 146 : 1070 - 1082