Effect of geometric parameters of a restraining embankment on the stabilization of a deep open-pit mine excavation

被引:0
|
作者
Jiang, Lichun [1 ,2 ]
Wang, Gege [2 ]
Xue, Luanluan [3 ]
Jia, Lijuan [2 ]
机构
[1] South China Univ Technol, Sch Civil Engn & Transportat, Guangzhou 510640, Peoples R China
[2] South China Univ Technol, Inst Safety Sci & Engn, Guangzhou 510640, Peoples R China
[3] South China Univ Technol, State Key Lab Subtrop Bldg Sci, Guangzhou 510640, Peoples R China
基金
中国国家自然科学基金; 国家重点研发计划;
关键词
Open-pit mining; Landslide; Slope remediation; Safety factor; Slope stability; STABILITY; LANDSLIDE;
D O I
10.1007/s10064-023-03457-0
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Effective slope stabilization measure in deep open-pit mines not only ensures the safety of employees and equipment, but also makes sound economic sense. Based on field investigations of a landslide at the Lishan Iron Mine, south China, an innovative and effective method for slope remediation is proposed. An in situ foundation embankment was first created by excavating an anti-slip foundation trench, then the slope was stabilized by building a restraining embankment against the slope. The in situ foundation embankment had a dense structure which provided good resistance both to slip and to overturn. The restraining embankment was constructed out of mining waste rock and reduced the potential for slope failure by diminishing the potential free area of the slope and inhibiting the development of fractures in the rock mass forming the slope. In view of the structural characteristics of the in situ foundation embankment, an analytical solution for the safety factor of the embankment slope is deduced using theoretical analysis and numerical simulation for various combinations of geometric parameters. The results show that the safety factor of the embankment decreases with an increase of step height and step slope angle and increases with an increase of platform width and that step slope angle is the key parameter which affects the safety factor and both the maximum displacement and maximum plastic strain. The reliability of the proposed method is validated using field monitoring results from the Lishan Iron Mine after the embankment construction. This mine has now been safely running without landslides for two hydrological years after the stabilization works were constructed.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] Circle geometric constraint model for open-pit mine ore-matching and its applications
    Jun-xin Huang
    Li-guan Wang
    Shu-min Xiong
    Shao-you Xu
    Zheng-hua Tan
    Hai-qiao Wang
    Journal of Central South University, 2012, 19 : 2598 - 2603
  • [42] Circle geometric constraint model for open-pit mine ore-matching and its applications
    Huang Jun-xin
    Wang Li-guan
    Xiong Shu-min
    Xu Shao-you
    Tan Zheng-hua
    Wang Hai-qiao
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2012, 19 (09) : 2598 - 2603
  • [43] Ultimate pit optimization with environmental problem for open-pit coal mine
    Xu, Xiaochuan
    Gu, Xiaowei
    Wang, Qing
    Zhao, Yunqi
    Zhu, Zhenguo
    Wang, Fengdan
    Zhang, Zaolin
    PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2023, 173 : 366 - 372
  • [44] Effect of Coalbed Methane Well Fracturing on Slope Stability of Open-Pit Coal Mine: A Case Study of Shengli East No. 2 Open-Pit Coal Mine
    Zhu, Qingzhong
    Wang, Bo
    Zhao, Xin
    Liu, Chunchun
    Yu, Qing
    Zhang, Liwen
    Hou, Tao
    Sang, Guangjie
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [45] FLEXIBLE OPEN-PIT MINE DESIGN UNDER UNCERTAINTY
    Groeneveld, B.
    Topal, E.
    JOURNAL OF MINING SCIENCE, 2011, 47 (02) : 212 - 226
  • [46] Geotechnical monitoring and modeling at Cuajone open-pit mine
    Rippere, K
    Sun, YL
    Tejada, L
    MINING SCIENCE AND TECHNOLOGY 99, 1999, : 379 - 383
  • [47] REOPENING AN OPEN-PIT MOLYBDENUM MINE - KITSAULT PROJECT
    DEVITT, JC
    MINING CONGRESS JOURNAL, 1981, 67 (03): : 23 - &
  • [48] OPTIMIZATION OF AN OPEN-PIT MINE TRANSPORT-SYSTEM
    TENIC, A
    KORDIC, Z
    STROJARSTVO, 1981, 23 (06): : 321 - 329
  • [49] STEREO-PHOTOGRAPHY IN OPEN-PIT MINE DESIGN
    CALDER, PN
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1970, 63 (695): : 285 - &
  • [50] Study on Stability Analysis and Monitoring Technology of Deep Concave Open-Pit Mine Slope
    Xue, Dinglong
    Ren, Fenghua
    Li, Yuan
    2018 2ND INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2018), 2018, 153