FLEXIBLE OPEN-PIT MINE DESIGN UNDER UNCERTAINTY

被引:0
|
作者
Groeneveld, B. [1 ]
Topal, E. [1 ]
机构
[1] Curtin Univ, Western Australian Sch Mines, Min Engn Dept, Kalgoorlie, WA, Australia
关键词
Real options; robust design; uncertainty; flexibility; stochastic simulation; mine design;
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
The risk associated with a mining project comes from the uncertainties involved in the industry. Mining companies endeavouring to maximize their return for shareholders make important strategic decisions which take years or even decades to "play out". However, many mining companies feel comfortable with point estimates of all project parameters but realize that no parameter value is known with certainty. A model that incorporates uncertainties and is able to adapt will help deliver a design with a better risk-return profile. In this paper, a new methodology is developed in order to have a design that is flexible and able to adapt with change. Following recent research on decision making methods in mine planning, this paper develops a mixed integer programming model that determines the optimal design for simulated stochastic parameters. The paper shows how to incorporate optionality (flexibility) in relation to mine, stockpile, plant and capacity constraint options. Obtained results are promising and are helping decision makers to think in terms of value, risk and frequency of execution.
引用
收藏
页码:212 / 226
页数:15
相关论文
共 50 条
  • [1] Flexible open-pit mine design under uncertainty
    Groeneveld B.
    Topal E.
    [J]. Journal of Mining Science, 2011, 47 (2) : 212 - 226
  • [2] OPEN-PIT MINE DESIGN IN SEISMIC AREAS
    DEVALLEJO, LG
    ELDRED, PJL
    OTEO, CS
    [J]. TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1984, 93 (OCT): : A192 - A197
  • [3] SLOPE DESIGN OF AN OPEN-PIT COPPER MINE
    SINGH, VK
    BALIGA, BD
    [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES & GEOMECHANICS ABSTRACTS, 1994, 31 (01) : 55 - 69
  • [4] Incorporation price uncertainty into open-pit to underground mine transition
    Hesam Dehghani
    Reza Sakinezhad
    Zohre Nabavi
    Nima Babanouri
    [J]. Mineral Economics, 2024, 37 : 89 - 99
  • [5] Incorporation price uncertainty into open-pit to underground mine transition
    Dehghani, Hesam
    Sakinezhad, Reza
    Nabavi, Zohre
    Babanouri, Nima
    [J]. MINERAL ECONOMICS, 2024, 37 (01) : 89 - 99
  • [6] STEREO-PHOTOGRAPHY IN OPEN-PIT MINE DESIGN
    CALDER, PN
    [J]. CANADIAN MINING AND METALLURGICAL BULLETIN, 1970, 63 (695): : 285 - &
  • [7] INTEGRATED OPEN-PIT COAL-MINE DESIGN
    BULLOCK, WD
    TOSNEY, JE
    MARTIN, PS
    [J]. CIM BULLETIN, 1976, 69 (768): : 55 - 62
  • [8] Application of VBA in design of open-pit mine mining
    Yang, Hong-Wei
    Qiao, Yong-Feng
    Kang, En-Sheng
    [J]. Liaoning Gongcheng Jishu Daxue Xuebao (Ziran Kexue Ban)/Journal of Liaoning Technical University (Natural Science Edition), 2005, 24 (SUPPL.): : 9 - 10
  • [9] AN APPLICATION OF DISCRETE MATHEMATICS IN THE DESIGN OF AN OPEN-PIT MINE
    CACCETTA, L
    GIANNINI, LM
    [J]. DISCRETE APPLIED MATHEMATICS, 1988, 21 (01) : 1 - 19
  • [10] The Influence of Rainfall on Landslide Stability of an Open-Pit Mine: The Case of Haizhou Open-Pit Mine
    An Bo
    Zhu Chun
    Liu Kuiming
    Li Sitong
    Tao Zhigang
    Li Haipeng
    Yu Haoran
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (04) : 3367 - 3378