Steel-Concrete Composite Cable-Stayed Bridge-Main Bridge of the Jiangxinzhou Yangtze River Bridge at Nanjing

被引:5
|
作者
Cui, Bing [1 ]
Wu, Huanling [2 ]
Zhao, Canhui [3 ]
Liu, Jiaping [4 ]
Guo, Zhiming [2 ]
机构
[1] CCCC Highway Consultants Co Ltd, Beijing, Peoples R China
[2] Nanjing Publ Engn Construct Ctr, Nanjing, Peoples R China
[3] Southwest Jiaotong Univ, Chengdu, Peoples R China
[4] Southeast Univ, Nanjing, Peoples R China
关键词
cable-stayed bridge; steel shell-concrete composite structure tower; steel-CA-RPC composite beam; bridge design; construction technology;
D O I
10.1080/10168664.2021.1999191
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Nanjing Jiangxinzhou Yangtze River Bridge is located at Nanjing, People's Republic of China. The main bridge spans Yangtze River in the form of a cable-stayed bridge with three towers and two main spans, with a total length of 1796 m and a main span of 600 m. The towers and main beams of the bridge are all steel-concrete composite structures, which is the first all-steel-concrete composite structure cable-stayed bridge in the world. The bridge innovatively develops a steel shell-concrete composite structure tower, deploys coarse aggregate reactive powder concrete (CA-RPC), and applies it to the main girder of the bridge to form a lightweight and high-performance steel-concrete composite beam. Numerous innovative technologies have been achieved with new materials, new structures, new processes, and many other aspects. The unique structural concept has significantly increased the factory manufacturing speed of bridge components, which not only reduces the work and labour cost at the bridge site above the bearing platform to less than 25% but also effectively reduces the amount and loss of engineering materials during bridge construction, all of which have made outstanding contributions to the development of cable-stayed bridges. At the same time, it has also contributed a bridge of stunning appearance and unique structure to China and world bridge engineering.
引用
收藏
页码:107 / 114
页数:8
相关论文
共 50 条
  • [31] Double-layer model updating for steel-concrete composite beam cable-stayed bridge based on GPS
    School of Transportation, Southeast University, Nanjing 210096, China
    J. Southeast Univ. Engl. Ed., 2008, 1 (80-84):
  • [32] Research on Concrete Preparation for the Steel-concrete Composite Segment of Jingyue Yangtze River Bridge
    DENG B1
    2. Key lab of large-span Bridge Construction Technology
    3. School of Materials Science and Engineering
    武汉理工大学学报, 2010, 32 (17) : 196 - 200
  • [33] Evaluation of seismic resistance capacity for Yibin yangtze river cable-stayed bridge
    Bao, Li-Xin
    Li, Xiao-Zhen
    Wei, Xing
    Zhuang, Wei-Lin
    Gongcheng Lixue/Engineering Mechanics, 2008, 25 (02): : 174 - 182
  • [34] Analysis of cable-stayed concrete filled steel tube arch bridge
    Yan, Y.
    Xu, H. Y.
    Shang, G. X.
    Ren, L.
    ISISS '2007: PROCEEDINGS OF THE INNOVATION AND SUSTAINABILITY OF STRUCTURES, VOLS 1 AND 2, 2008, : 119 - 124
  • [35] Structure analysis of concrete cable-stayed bridge based on composite element
    Institute of Bridge and Tunnel Engineering, Southeast University, Nanjing 210096, China
    不详
    Gongcheng Lixue, 2009, 2 (137-141+157):
  • [36] Influence of Concrete Shrinkage and Creep on Composite beam of Cable-stayed Bridge
    Hu, Xuhui
    Zhong, Ning
    Jing, Shihong
    CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 1040 - +
  • [37] Uddevalla cable-stayed bridge
    Hansvold, C
    Lundh, L
    Larsson, KE
    Nilsson, H
    STRAIT CROSSINGS 2001, 2001, : 27 - 33
  • [38] The Millau cable-stayed bridge
    Virlogeux, M
    RECENT DEVELOPMENTS IN BRIDGE ENGINEERING, 2003, : 3 - 18
  • [39] The colletta cable-stayed bridge
    Petrangeli, Mario Paolo
    Industria Italiana del Cemento, 2006, 76 (823): : 728 - 743
  • [40] Cable-stayed pedestrian bridge
    Fernandez, P
    PCI JOURNAL, 2000, 45 (04): : 119 - 119