An upgraded iterated greedy scheduling algorithm for distributed blocking flowshop group problem

被引:0
|
作者
Ji, Qianhui [1 ]
Han, Yuyan [1 ]
Wang, Yuhang [1 ]
Wang, Yizheng [1 ]
机构
[1] Liaocheng Univ, Sch Comp Sci, Liaocheng, Shandong, Peoples R China
关键词
flowshop group scheduling; distributed; blocking; makespan; iterated greedy algorithm; OPTIMIZATION;
D O I
10.1109/CCDC58219.2023.10327183
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Owing to the needs of production technology, the demand for group scheduling models will further increase to save costs and time. Thus, the flowshop group scheduling problem (FGSP) has attracted a lot of attention, and is of theoretical significance for academic discussion and practical application. in this paper, we consider a distributed FGSP with blocking constrain (DBFGSP). First, a mathematical model of DBFGSP with makespan criterion is formulated and an upgraded iterative greedy algorithm based on intra-group and inter-group operations (UIG) is developed to increase the solution diversity and balance global and local search capabilities. Through numerical simulation of 810 test cases and statistical comparisons with four representative algorithms, it is verified that the proposed UIG algorithm can obtain good scheduling schemes for DBFGSP.
引用
收藏
页码:670 / 675
页数:6
相关论文
共 50 条
  • [31] An effective Iterated Greedy algorithm for the distributed permutation flowshop scheduling with due windows
    Jing, Xue-Lei
    Pan, Quan-Ke
    Gao, Liang
    Wang, Yu-Long
    APPLIED SOFT COMPUTING, 2020, 96
  • [32] An improved iterated greedy algorithm for distributed robotic flowshop scheduling with order constraints
    Li, Wenhan
    Chen, Xiaolong
    Li, Junqing
    Sang, Hongyan
    Han, Yuyan
    Du, Shubo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 164
  • [33] An iterated greedy algorithm for the distributed permutation flowshop scheduling problem with preventive maintenance to minimize total flowtime
    Mao, Jiayang
    Hu, XiaoLu
    Pan, Quan-ke
    Miao, Zhonghua
    He, Chuangxin
    Tasgetiren, M. Fatih
    PROCEEDINGS OF THE 39TH CHINESE CONTROL CONFERENCE, 2020, : CP1 - CP1
  • [34] Historical information based iterated greedy algorithm for distributed flowshop group scheduling problem with sequence-dependent setup times
    He, Xuan
    Pan, Quan-Ke
    Gao, Liang
    Neufeld, Janis S.
    Gupta, Jatinder N. D.
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2024, 123
  • [35] An effective adaptive iterated greedy algorithm for a cascaded flowshop joint scheduling problem
    Wang, Chuang
    Pan, Quan-Ke
    Jing, Xue-Lei
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 238
  • [36] Solving robotic distributed flowshop problem using an improved iterated greedy algorithm
    Li, Wenhan
    Li, Junqing
    Gao, Kaizhou
    Han, Yuyan
    Niu, Ben
    Liu, Zhengmin
    Sun, Qun
    INTERNATIONAL JOURNAL OF ADVANCED ROBOTIC SYSTEMS, 2019, 16 (05)
  • [37] Enhancing distributed blocking flowshop group scheduling: Theoretical insight and application of an iterated greedy algorithm with idle time insertion and rapid evaluation mechanisms
    Wang, Yizheng
    Wang, Yuting
    Han, Yuyan
    Gao, Kaizhou
    Li, Junqing
    Wang, Yuhang
    EXPERT SYSTEMS WITH APPLICATIONS, 2025, 271
  • [38] An effective iterative greedy algorithm for distributed blocking flowshop scheduling problem with balanced energy costs criterion
    Han, Xue
    Han, Yuyan
    Zhang, Biao
    Qin, Haoxiang
    Li, Junqing
    Liu, Yiping
    Gong, Dunwei
    APPLIED SOFT COMPUTING, 2022, 129
  • [39] Reinforcement learning iterated greedy algorithm for distributed assembly permutation flowshop scheduling problems
    Ying K.-C.
    Lin S.-W.
    Journal of Ambient Intelligence and Humanized Computing, 2023, 14 (08) : 11123 - 11138
  • [40] An effective iterated greedy algorithm for the mixed no-idle permutation flowshop scheduling problem
    Pan, Quan-Ke
    Ruiz, Ruben
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2014, 44 : 41 - 50