An effective adaptive iterated greedy algorithm for a cascaded flowshop joint scheduling problem

被引:3
|
作者
Wang, Chuang [1 ,2 ]
Pan, Quan-Ke [1 ]
Jing, Xue-Lei [3 ]
机构
[1] Shanghai Univ, Sch Mechatron Engn & Automat, Shanghai 200444, Peoples R China
[2] Xuchang Univ, Sch Informat Engn, Xuchang 461000, Peoples R China
[3] Liaocheng Univ, Network Informat Ctr, Liaocheng 252000, Peoples R China
基金
中国国家自然科学基金;
关键词
Serial flowshop; Metaheuristic; Total flowtime; Distributed permutation flowshop; Hybrid flowshop; MINIMIZING MAKESPAN; TOTAL FLOWTIME; SHOP; OPTIMIZATION; METAHEURISTICS; HEURISTICS;
D O I
10.1016/j.eswa.2023.121856
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper addresses a novel scheduling problem, namely the cascaded flowshop joint scheduling problem (CFJSP), which has critical applications in the modern electronic information equipment manufacturing industry. The CFJSP is composed of a distributed permutation flowshop scheduling problem and hybrid flowshop scheduling problem. This paper considers how to arrange a variety of jobs for the two flowshops together to minimize total flowtime. We present a mixed integer linear programming mathematical model and an effective adaptive iterated greedy (AIG) algorithm with a decomposition and collaboration mechanism, which optimizes each production phase sequentially and ultimately optimizes the whole process. Combining the problem-specific characteristic, an adaptive inverse bounded heuristic, an adaptive bounded range local search, and an odd/even random insertion reconstruction mechanism are proposed to explore more valuable space. Comprehensive computational experiments and statistical analyses are conducted to verify the effectiveness of the proposed AIG. The experimental results show that the proposed AIG significantly outperforms the state-of-the-art competing algorithms from the literature in relative deviation index values at the same CPU running time.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] A cascaded flowshop joint scheduling problem with makespan minimization: A mathematical model and shifting iterated greedy algorithm
    Wang, Chuang
    Pan, Quan-Ke
    Sang, Hong-Yan
    Jing, Xue-Lei
    [J]. SWARM AND EVOLUTIONARY COMPUTATION, 2024, 86
  • [2] A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
    Ruiz, Ruben
    Stutzle, Thomas
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 177 (03) : 2033 - 2049
  • [3] An iterated greedy algorithm for the flowshop scheduling problem with blocking
    Ribas, Imma
    Companys, Ramon
    Tort-Martorell, Xavier
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2011, 39 (03): : 293 - 301
  • [4] An effective iterated greedy algorithm for the mixed no-idle permutation flowshop scheduling problem
    Pan, Quan-Ke
    Ruiz, Ruben
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2014, 44 : 41 - 50
  • [5] The cascaded flowshop joint scheduling problem: A mathematical model and population-based iterated greedy algorithm to minimize total tardiness
    Wang, Chuang
    Pan, Quan-Ke
    Sang, Hong-Yan
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2024, 88
  • [6] An improved iterated greedy algorithm for the distributed hybrid flowshop scheduling problem
    Lu, Chao
    Zheng, Jun
    Yin, Lvjiang
    Wang, Renyi
    [J]. ENGINEERING OPTIMIZATION, 2024, 56 (05) : 792 - 810
  • [7] A modified iterated greedy algorithm for distributed flowshop group scheduling problem
    Wang, Yuhang
    Han, Yuyan
    Zhang, Chenyao
    Li, Chengshuai
    Wang, Yong
    [J]. 2023 35TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2023, : 7 - 12
  • [8] An effective Iterated Greedy algorithm for the distributed permutation flowshop scheduling with due windows
    Jing, Xue-Lei
    Pan, Quan-Ke
    Gao, Liang
    Wang, Yu-Long
    [J]. APPLIED SOFT COMPUTING, 2020, 96
  • [9] An upgraded iterated greedy scheduling algorithm for distributed blocking flowshop group problem
    Ji, Qianhui
    Han, Yuyan
    Wang, Yuhang
    Wang, Yizheng
    [J]. 2023 35TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2023, : 670 - 675
  • [10] An improved iterated greedy algorithm for the distributed assembly permutation flowshop scheduling problem
    Huang, Ying-Ying
    Pan, Quan-Ke
    Huang, Jiang-Ping
    Suganthan, P. N.
    Gao, Liang
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 152