共 50 条
- [1] An upgraded iterated greedy scheduling algorithm for distributed blocking flowshop group problem 2023 35TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2023, : 670 - 675
- [2] An Iterated Greedy Algorithm for Distributed Flowshop Group Scheduling Problem with Total Tardiness Criterion 2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC), 2021, : 2009 - 2014
- [3] Minimizing Total Tardiness in the Distributed Flowshop Group Scheduling Problem with an Iterated Greedy Algorithm 2022 34TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2022, : 5024 - 5029
- [7] An iterated greedy algorithm for the flowshop scheduling problem with blocking OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2011, 39 (03): : 293 - 301
- [8] An Iterated Greedy Algorithm Based on Accelerated Calculation for Distributed Flowshop Group Scheduling Problem with Blocking Constraints 2023 35TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2023, : 13 - 18
- [9] A hybrid iterated greedy algorithm for distributed flowshop group scheduling problem to minimize total tardiness time 2023 35TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2023, : 1096 - 1101