Development of a mathematical model to predict the cost of Ethiopian Roads Authority road projects: the case of Ethiopia

被引:1
|
作者
Belete, Sisay Birhanu [1 ]
Meharie, Meseret Getnet [2 ]
Ayalew, Girmay Getawa [3 ]
机构
[1] Assosa Univ, Coll Engn, Dept Construct Technol & Management, Assosa, Ethiopia
[2] Adama Sci & Technol Univ, Sch Civil Engn & Architecture, Dept Civil Engn, Adama, Ethiopia
[3] Woldia Univ, Inst Technol, Sch Civil & Water Resource Engn, Dept Construct Technol & Management, POB 400, Woldia, Ethiopia
来源
COGENT ENGINEERING | 2024年 / 11卷 / 01期
关键词
Cost prediction; project cost; regression model; road projects; Roads Authority; Mathematical Model;
D O I
10.1080/23311916.2023.2297492
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
All across the world, the construction industry is a very crucial sector for development. Cost prediction is the process of forecasting the cost of construction projects at an early stage. An effective estimation technique is necessary to reduce the effort, time, and cost. Therefore, the study aims to develop a mathematical model to predict the cost of Ethiopian Roads Authority road projects in the case of Ethiopia. The data were collected from primary and secondary sources. The method of data analysis for the study was multiple regression analysis, and it was done using SP SS and Microsoft Excel. The data were obtained from a road document review and a questionnaire survey of 62 respondents and 15 interviewers who are working in ERA. The major cost-influential factors were found to be: inflation rate, bridges, culverts, project length, width, type and scope, contract duration, and location. As a result, a multiple regression model was developed using nine significant parameters taken from 18 completed road projects. The multiple regression analysis result revealed that the model can perform at a success rate of 83.8%. The MAPE of the model was +/- 16.44%. The conclusion and recommendations are likely to support and reduce ineffective estimation trends.
引用
收藏
页数:21
相关论文
共 50 条
  • [1] A road maintenance management strategy evaluation and selection model by integrating Fuzzy AHP and Fuzzy TOPSIS methods: The case of Ethiopian Roads Authority
    Ayalew, Girmay Getawa
    Meharie, Meseret Getnet
    Worku, Betelhem
    [J]. COGENT ENGINEERING, 2022, 9 (01):
  • [2] Critical Factors Affecting Cost Overrun in Foreign Funded Road Construction Projects in Sri Lanka A Case Study of Road Development Authority and Provincial Road Development Authorities
    Dolage, D. A. R.
    Dasantha, O. M. C.
    [J]. ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA, 2022, 55 (02): : 21 - 30
  • [3] Cost diviation in road construction projects: The case of Palestine
    Mahamid, Ibrahim
    Bruland, Amund
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2012, 12 (01): : 58 - 71
  • [4] Model for predicting cost of rural road projects in Thailand
    Lin, Wai Phyo
    Techapeeraparnich, Wasaporn
    [J]. 4TH INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND MATERIALS SCIENCE (ICCEMS 2019), 2019, 652
  • [5] Critical factors affecting cost performance: a case of Ethiopian public construction projects
    Sinesilassie, E. G.
    Tabish, S. Z. S.
    Jha, K. N.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2018, 18 (02) : 108 - 119
  • [6] Development of a Cost Prediction Model for Design Changes: Case of Korean Apartment Housing Projects
    Ahn, Ie-Sle
    Kim, Jae-Jun
    Lee, Joo-Sung
    [J]. SUSTAINABILITY, 2024, 16 (11)
  • [7] Environmental Pollution Cost Model for Land Development Projects
    Chen, Xiu
    Wang, Zeping
    An, Yifei
    Sun, Mingqi
    [J]. 5TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY, ENVIRONMENT AND CHEMICAL ENGINEERING, 2019, 358
  • [8] DEVELOPMENT OF A MATHEMATICAL-MODEL TO PREDICT MUSCLE FORCE
    WEXLER, A
    BLAIR, J
    BINDERMACLEOD, SA
    [J]. FASEB JOURNAL, 1994, 8 (04): : A57 - A57
  • [9] An Intelligent Model to Predict the Development Time and Budget of Software Projects
    Bardsiri, Amid Khatibi
    [J]. INTERNATIONAL JOURNAL OF NONLINEAR ANALYSIS AND APPLICATIONS, 2020, 11 (02): : 85 - 102
  • [10] A hybrid forecasting model to predict the duration and cost performance of projects with Bayesian Networks
    Unsal-Altuncan, Izel
    Vanhoucke, Mario
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 315 (02) : 511 - 527