Environmental Pollution Cost Model for Land Development Projects

被引:1
|
作者
Chen, Xiu [1 ]
Wang, Zeping [1 ]
An, Yifei [1 ]
Sun, Mingqi [1 ]
机构
[1] Harbin Univ Sci & Technol, Rongcheng Campus, Rongcheng 264300, Shandong, Peoples R China
关键词
D O I
10.1088/1755-1315/358/2/022061
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The environmental pollution cost is a measure of the extent of damage to the environment of land development projects. It should be an important part of corporate decision-making. Environmental pollution cost refers to economic losses caused by environmental pollution, including environmental degradation cost and pollution control cost. First, we use the market value method to establish the cost equations for water, energy and land environmental degradation. In addition, we use principal component analysis to select two main factors affecting environmental control cost: environmental pollution level and corporate environmental management level. We use the entropy weight method and the analytic hierarchy process to normalize the management level, and then establish an equation for accounting for the pollution control cost of the project. Enterprise environmental pollution cost accounting system is conducive to the enterprise to accurately calculate the environmental pollution cost of land development projects. Reasonable control of environmental pollution is conducive to the sustainable development of the economy and society.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] Redefinition of Cost-Benefit Efficiency of Land-Use Projects: Focusing on Environmental Cost
    Chen, Xu
    Du, Qianyi
    Xiong, Xueyan
    Zhong, Deliang
    Deng, Na
    Liu, Shudong
    Li, Yipeng
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019
  • [2] Development of optimization model for balancing time, cost, and environmental impact in retrofitting projects with NSGA-III
    Krushna Chandra Sethi
    Umashankar Prajapati
    Ashwin Parihar
    Chayan Gupta
    Gaurav Shrivastava
    Kamal Sharma
    Asian Journal of Civil Engineering, 2024, 25 (7) : 5123 - 5136
  • [3] Impact of social cost of carbon analyses in the development of energy projects on federal land
    Stoellinger T.
    Righetti T.
    Coddington K.
    Electricity Journal, 2016, 29 (01): : 63 - 70
  • [4] An intelligent model for cost prediction in new product development projects
    Mousavi, S. Meysam
    Vahdani, Behnam
    Abdollahzade, Majid
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 29 (05) : 2047 - 2057
  • [5] Research on Cost Model of Environmental Cooperation Protection for Transboundary Air Pollution
    Li, Chang-min
    Wang, Hong-xia
    JOINT 2016 INTERNATIONAL CONFERENCE ON ECONOMICS AND MANAGEMENT ENGINEERING (ICEME 2016) AND INTERNATIONAL CONFERENCE ON ECONOMICS AND BUSINESS MANAGEMENT (EBM 2016), 2016, : 91 - 96
  • [6] DOOMWATCH FOR ENVIRONMENTAL POLLUTION .A. POLLUTION OF LAND - ENEMY OF PEOPLE
    WARD, C
    ROYAL SOCIETY OF HEALTH JOURNAL, 1972, 92 (04): : 173 - 177
  • [7] PCA based cost estimation model for agile software development projects
    Garg, Sakshi
    Gupta, Daya
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [8] Developing a Cost Overrun Predictive Model for Complex Systems Development Projects
    Adoko, Moses T.
    Mazzuchi, Thomas A.
    Sarkani, Shahram
    PROJECT MANAGEMENT JOURNAL, 2015, 46 (06) : 111 - 125
  • [9] ANALYSIS AND DEVELOPMENT OF A MODEL FOR THE CAUSES OF COST AND TIME OVERRUNS IN ENGINEERING PROJECTS
    Masood, Syed Athar
    2012 ASEE ANNUAL CONFERENCE, 2012,
  • [10] Stakeholder Dynamics in Land Development Projects
    Bradshaw, Karen
    JOURNAL OF LEGAL STUDIES, 2021, 50 : S53 - S70