Γ-robust optimization of project scheduling problems

被引:1
|
作者
Koster, Arie M. C. A. [1 ]
Segschneider, Jenny [1 ]
Ventsch, Nicole [1 ]
机构
[1] Rhein Westfal TH Aachen, Res Area Discrete Optimizat, Pontdriesch 10-12, D-52056 Aachen, Germany
关键词
Robust project scheduling; Budgeted uncertainty; Two-stage robust optimization; Heuristics; Mixed-integer programming; ALGORITHM;
D O I
10.1016/j.cor.2023.106453
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we investigate the problem of finding a robust baseline schedule for the project scheduling problem under uncertain process times. We assume that the probability distribution for the duration is unknown, but an estimate is given along with an interval in which this time can vary. At most Gamma of the tasks will deviate from the estimated time. We present two approaches to solving this problem. The first approach treats the problem of determining the earliest guaranteed finish times and can be solved in polynomial time by an extension of the critical path method. The second is a two-stage approach that determines the baseline schedule in the first stage and an adaptation to the scenario in the second stage. We show strong NP-hardness of the second stage problem and introduce a novel formulation. From this formulation we derive an exact algorithm and three heuristics. A computational study on benchmark instances shows that the heuristics perform well on larger instances.
引用
收藏
页数:16
相关论文
共 50 条
  • [21] Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling
    Wanlin Liu
    Li Ge
    Chunli Qu
    Shun Yang
    KSCE Journal of Civil Engineering, 2024, 28 : 15 - 28
  • [22] Robust Optimization-based Genetic Algorithm for Project Scheduling with Stochastic Activity Durations
    Shou, Yongyi
    Wang, Wei
    INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, 2012, 15 (10): : 4049 - 4064
  • [23] Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling
    Liu, Wanlin
    Ge, Li
    Qu, Chunli
    Yang, Shun
    KSCE JOURNAL OF CIVIL ENGINEERING, 2024, 28 (01) : 15 - 28
  • [24] Resource Constrained Project Scheduling Optimization With Robust Objective Under Stochastic Duration Of Activities
    Zheng, Wei-bo
    He, Yu-kang
    PROCEEDINGS OF THE 23RD INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2016: THEORY AND APPLICATION OF INDUSTRIAL ENGINEERING, 2017, : 239 - 243
  • [25] Robust scheduling optimization for resource-constrained project based on random duration of activities
    He, Z.-W. (zhengwenhe@mail.xjtu.edu.cn), 2013, Systems Engineering Society of China (33):
  • [26] Scenario-Based Proactive Robust Optimization for Critical-Chain Project Scheduling
    Ma, Guofeng
    Gu, Lingyun
    Li, Nan
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (10)
  • [27] Progress payments in project scheduling problems
    Vanhoucke, M
    Demeulemeester, E
    Herroelen, W
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 148 (03) : 604 - 620
  • [28] Dynamic search control-based particle swarm optimization for project scheduling problems
    Chen, Ruey-Maw
    Shen, Yin-Mou
    ADVANCES IN MECHANICAL ENGINEERING, 2016, 8 (04) : 1 - 12
  • [29] Solving Logistics Scheduling Problems Using an Extended Many-Project Optimization Model
    Mihaly, Krisztian
    Forrai, Monika Kulcsarne
    Kulcsar, Gyula
    ADVANCES IN DIGITAL LOGISTICS, LOGISTICS AND SUSTAINABILITY, CECOL 2024, 2024, : 115 - 144
  • [30] Particle swarm optimization for resource-constrained project scheduling problems with activity splitting
    Deng, Lin-Yi
    Lin, Yan
    Kongzhi yu Juece/Control and Decision, 2008, 23 (06): : 681 - 684