Fatigue Performance of a Novel Steel-Concrete Joint of a Long-Span High-Speed Railway Hybrid Girder-Cable-Stayed Bridge

被引:2
|
作者
Shi, Zhou [1 ]
Li, Yingming [1 ]
Yang, Yi [1 ]
Zhao, Xupo [1 ]
Yu, Wanqing [1 ]
机构
[1] Southwest Jiaotong Univ, Dept Bridge Engn, 111 Sect Northbound 1,Second Ring Rd, Chengdu 610031, Peoples R China
关键词
High-speed railway; Hybrid girder-cable-stayed bridge; Steel-concrete joint; Fatigue performance; Model test; Parametric analysis; SHEAR CONNECTOR; BEHAVIOR;
D O I
10.1061/JBENF2.BEENG-6425
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The steel-concrete joint (SCJ) of a railway hybrid girder-cable-stayed bridge transmits tremendous internal forces, resulting in complex structure and stress. The existing complex SCJs lead to difficulties in on-site concrete construction, and the complex stress of the SCJ under train load is prone to diseases such as steel concrete fatigue detachment and cracking. To investigate the complex fatigue performance of a novel SCJ for a long-span high-speed railway hybrid box girder-cable-stayed bridge with a main span of 672 m, finite-element analysis (FEA) and a 1:2 scaled fatigue model test with 2.15 million cycles were conducted. The results showed that the numerical fatigue stresses of the SCJ exhibited a significant shear lag effect in the transverse direction with unfavorable fatigue stresses at the side box. After 1.70 million loading cycles, all the steel plates of the test model remained intact, indicating good fatigue resistance during the design life. Cracks appeared at the junction between the horizontal diaphragm and the web of the steel transition segment (STS) after 1.85 million cycles, showing a fatigue life of 118 years. The measured fatigue crack life of the concrete deck over the postanchor position of the prestressed tendons in the STS was 30.5 years for the local concentrated tensile stress, which can be improved by casting the concrete after the tendons are prestressed. No fracture or other abnormalities occurred in the shear studs and perforated rib (PBL) rebars, and the deflection of the test model and the slip between the steel and concrete were insignificant during the fatigue tests, indicating the good fatigue performance of the SCJ, which was better than that of the STS. The thickness of the bearing plate and diameter of the shear studs for the actual SCJ were suggested to be 40-60 and 16-25 mm, respectively, based on a parametric study.
引用
收藏
页数:17
相关论文
共 50 条
  • [31] The Numerical Simulation Analysis Method of Steel-concrete Joint Section in Hybrid Girder of Cable-stayed Bridge
    Xing Bing
    Li Xiao-Zhen
    MODERN TECHNOLOGIES IN MATERIALS, MECHANICS AND INTELLIGENT SYSTEMS, 2014, 1049 : 226 - 233
  • [32] Mechanical Analysis of Steel Beam and Steel-Concrete Combined Section Pavement in Long-Span Hybrid Girder Bridge
    Ke, Zhong
    Jing, Hu
    Bin, Zheng
    KEY ENGINEERING MATERIALS AND COMPUTER SCIENCE, 2011, 320 : 103 - 107
  • [33] Mechanical behavior of steel-concrete joint with rear bearing plate in hybrid girder of cable-stayed bridge
    Liu, Rong
    Liu, Yu-Qing
    Wu, Ding-Jun
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2009, 41 (SUPPL. 2): : 196 - 200
  • [34] Spatial Force Characteristics of Key Joints of Steel-Concrete Slab-Truss Composite Girder of Long-Span Railway-cum-Road Cable-Stayed Bridge
    Shi, Zhou
    Zhao, Xupo
    Zhou, Yongcong
    Liu, Zhenbiao
    Xia, Zhengchun
    Yin, Tao
    Zhongguo Tiedao Kexue/China Railway Science, 2024, 45 (05): : 90 - 100
  • [35] Discussion on Rating Technology for Operation Performance of High-speed Railway Long Span Cable-stayed Bridge
    Wang W.
    Wang, Wei (15101575239@126.com), 2018, Science Press (40): : 103 - 110
  • [36] Design of a railway steel and concrete hybrid box girder cable-stayed bridge with main span of 468 m
    Liu, Zhen-Biao
    Luo, Shi-Dong
    Pan, Mao-Sheng
    Zeng, Jia-Hua
    Bridge Construction, 2014, 44 (01) : 81 - 88
  • [37] Theoretical and experimental research on deformation adaptability of ballastless tracks on long-span cable-stayed bridge in high-speed railway
    Zheng W.
    Zhu Z.
    Sheng X.
    Li D.
    Guo S.
    Journal of Railway Science and Engineering, 2024, 21 (04) : 1286 - 1297
  • [38] Dongping Channel Bridge: Long-Span Steel Arch Bridge in High-Speed Railway, China
    Liu, Wenshuo
    Dai, Gonglian
    STRUCTURAL ENGINEERING INTERNATIONAL, 2011, 21 (04) : 492 - 496
  • [39] Dynamic Analysis of Long-span Concrete Simply Supported Box Girder in High-speed Railway
    Ban, Xinlin
    Journal of Railway Engineering Society, 2020, 37 (05): : 36 - 41
  • [40] Mechanical behaviour of a novel floor system with horizontal K-shaped brace in Long-span High-speed railway steel truss Cable-stayed bridge
    Shi, Zhou
    Yu, Wanqing
    Gu, Jiachang
    Li, Jiaqi
    Zhong, Meiling
    ENGINEERING STRUCTURES, 2021, 249