A note: maximizing the weighted number of Just-in-Time jobs for a given job sequence

被引:0
|
作者
Gerstl, Enrique [1 ]
Mosheiov, Gur [1 ,2 ]
机构
[1] Hebrew Univ Jerusalem, Sch Business Adm, Jerusalem, Israel
[2] Jerusalem Coll Technol, Lev Acad Ctr, Jerusalem, Israel
基金
以色列科学基金会;
关键词
Scheduling; Single machine; Just-in-Time; Dynamic programming; Flowshop; SHOP SCHEDULING PROBLEM; MINIMIZE;
D O I
10.1007/s10951-022-00772-4
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We study a single machine scheduling problem to maximize the weighted number of Just-in-Time jobs, i.e., jobs which are completed exactly at their due-dates. We focus on the case that the job sequence is given. A pseudo-polynomial solution algorithm has been published for this problem, and we introduce here an efficient polynomial time dynamic programming algorithm. The new algorithm is tested numerically, and the results are compared to those obtained by the old algorithm. While the running times required by both algorithms for solving large instances are extremely small, it appears that the new algorithm performs better in two aspects: (1) The resulting running time is independent of the actual density of the due-dates, (2) The required memory is significantly reduced. An extension to a two-machine flowshop is provided, and this case is shown to remain polynomially solvable.
引用
收藏
页码:403 / 409
页数:7
相关论文
共 50 条
  • [41] Job scheduling to minimize the weighted waiting time variance of jobs
    Li, Xueping
    Ye, Nong
    Liu, Tieming
    Sun, Yang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2007, 52 (01) : 41 - 56
  • [42] OPTIMIZATION OF JUST-IN-TIME PART SUPPLY SCHEDULING IN ASSEMBLY JOB SHOP
    Sun, Lin
    Xiao, Feng
    2019 16TH INTERNATIONAL COMPUTER CONFERENCE ON WAVELET ACTIVE MEDIA TECHNOLOGY AND INFORMATION PROCESSING (ICWAMTIP), 2019, : 443 - 446
  • [43] IMPROVING "JUST-IN-TIME, JUST-IN-SEQUENCE" DELIVERY IN FIRST-TIER SUPPLIERS
    Bautista, Joaquin
    Fortuny-Santos, Jordi
    BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2016, 13 (03) : 286 - 298
  • [44] Simultaneously determining the number of kanbans, container sizes, and the final-assembly sequence of products in a just-in-time shop
    Philipoom, PR
    Rees, LP
    Taylor, BW
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (01) : 51 - 69
  • [45] A NOTE ON THE PROBLEM OF SCHEDULING A FLEXIBLE MANUFACTURING SYSTEM FOR JUST-IN-TIME CUSTOMERS
    CO, HC
    ZHU, J
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (06) : 1673 - 1681
  • [46] Near-Optimal Heuristics for Just-In-Time Jobs Maximization in Flow Shop Scheduling
    Fuchigami, Helio Yochihiro
    Sarker, Ruhul
    Rangel, Socorro
    ALGORITHMS, 2018, 11 (04)
  • [47] Two-agent single-machine scheduling problem with just-in-time jobs
    Choi, Byung-Cheon
    Chung, Jibok
    THEORETICAL COMPUTER SCIENCE, 2014, 543 : 37 - 45
  • [48] Improving Just-In-Time Comment Updating via AST Edit Sequence
    Huang, Jiawen
    Yu, Huiqun
    Fan, Guisheng
    Zhou, Ziyi
    Li, Mingchen
    INTERNATIONAL JOURNAL OF SOFTWARE ENGINEERING AND KNOWLEDGE ENGINEERING, 2022, 32 (10) : 1455 - 1476
  • [49] Just-in-time production planning with fuzzy due date for job manufacturing systems
    Wang, Wei
    Wang, Dingwei
    1997, (17):
  • [50] An Improved Genetic Algorithm For Just-In-Time Job-Shop Scheduling Problem
    Yang, Hongan
    Li, Jinyuan
    Qi, Liangliang
    ADVANCED MANUFACTURING TECHNOLOGY, PTS 1-4, 2012, 472-475 : 2462 - 2467