共 50 条
- [3] A Note on Two-agent Single-machine Scheduling Problem with Deteriorating Jobs [J]. 2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 3832 - +
- [9] Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs [J]. Journal of Scheduling, 2017, 20 : 313 - 335
- [10] A two-agent single-machine scheduling problem with a time-based learning effect [J]. 2012 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS (ICAL), 2012, : 641 - 645