Assessment of Wastewater Treatment Plant Upgrading with MBR Implementation

被引:0
|
作者
Makisha, Nikolay [1 ]
机构
[1] Moscow State Univ Civil Engn, Res & Educ Ctr Water Supply & Wastewater Treatment, 26 Yaroslaskoye Highway, Moscow 129337, Russia
关键词
wastewater treatment; membrane bioreactor; modernization; activated sludge reactor; cost analysis;
D O I
10.3390/membranes13080746
中图分类号
Q5 [生物化学]; Q7 [分子生物学];
学科分类号
071010 ; 081704 ;
摘要
Modernization of wastewater treatment plants is usually caused by their significant wear and changes in the flow rate and concentration of pollutants. If there is no initial data on the flow or pollution, their determination by calculation is required, which may lead to an increase in concentration. Within the study, the modernization of treatment facilities was estimated under conditions of reduced flow and increased pollution concentration. Calculations were carried out both manually and using the CapdetWorks software package. The focus was on secondary treatment facilities as the main element of the municipal wastewater treatment plant within their upgrade from only organic pollutants removal (plug-flow reactor) to removal of both organic pollutants and nutrients (technology of the University of Cape Town). The calculations of tank volumes have shown that the concentration of pollutants has a much greater impact on them than the change in flow, especially when improvement in the treatment quality is required. The study revealed that membrane sludge separation allows tanks to be reduced in volume by 1.5-2.5 times (depending on the value of mixed liquor suspended solids) in comparison with gravity separation, which means smaller capital costs. However, membrane application requires significant energy costs for membrane aeration. For the initial data of the study, the specific energy costs for aeration before the upgrade, after the upgrade (gravity separation), and after the upgrade (membrane separation) were 0.12 kWh/m(3), 0.235 kWh/m(3), and 0.3 kWh/m(3), respectively. If the membrane lifetime is 10 years, membrane costs were determined to be 10-15% of the energy costs for aeration.
引用
收藏
页数:17
相关论文
共 50 条
  • [31] Rehabilitation and upgrading wastewater treatment plant for safe irrigation reuse in remote area
    Abdel-Shafy, Hussein I.
    Mansour, Mona S. M.
    WATER PRACTICE AND TECHNOLOGY, 2020, 15 (04): : 1213 - 1227
  • [32] Behavior of antibiotic resistance genes in a wastewater treatment plant with different upgrading processes
    Lin, Ze-Jun
    Zhou, Zhen-Chao
    Zhu, Lin
    Meng, Ling-Xuan
    Shuai, Xin-Yi
    Sun, Yu-Jie
    Chen, Hong
    SCIENCE OF THE TOTAL ENVIRONMENT, 2021, 771
  • [33] UPGRADING A COMPLEX MIX ACTIVATED-SLUDGE WASTEWATER-TREATMENT PLANT
    UHTE, WR
    JOURNAL WATER POLLUTION CONTROL FEDERATION, 1976, 48 (12): : 2653 - 2668
  • [34] Wastewater treatment by MBR pilot plant: flat sheet and hollow fibre case studies
    Santasmasas, Carme
    Rovira, Miquel
    Clarens, Frederic
    Valderrama, Cesar
    DESALINATION AND WATER TREATMENT, 2013, 51 (10-12) : 2423 - 2430
  • [35] Upgrading of a wastewater treatment plant with a hybrid moving bed biofilm reactor (MBBR)
    Falletti, Luigi
    Conte, Lino
    Maestri, Andrea
    AIMS ENVIRONMENTAL SCIENCE, 2014, 1 (02) : 45 - 52
  • [36] Kappala 2001 - upgrading and expansion of the Kappala Wastewater Treatment Plant: project management
    Bengtsson, B
    Palmgren, T
    WATER SCIENCE AND TECHNOLOGY, 2000, 41 (09) : 81 - 88
  • [37] Upgrading of sewage treatment plant by sustainable and cost-effective separate treatment of industrial wastewater
    Abma, W. R.
    Driessen, W.
    Haarhuis, R.
    van Loosdrecht, M. C. M.
    WATER SCIENCE AND TECHNOLOGY, 2010, 61 (07) : 1715 - 1722
  • [38] Performance assessment of a wastewater treatment plant treating weak campus wastewater
    Coskuner, Gulnur
    Ozdemir, Nur Seher
    INTERNATIONAL JOURNAL OF ENVIRONMENT AND POLLUTION, 2006, 28 (1-2) : 185 - 197
  • [39] Environmental assessment of wastewater treatment plant under Polish condition. Part 2**. Life cycle assessment of wastewater treatment plant
    Burchart-Korol, Dorota
    Zawartka, Pawel
    Bondaruk, Jan
    PRZEMYSL CHEMICZNY, 2017, 96 (11): : 2247 - 2252
  • [40] Assessment of drugs of abuse in a wastewater treatment plant with parallel secondary wastewater treatment train
    Kumar, Rahul
    Tscharke, Ben
    O'Brien, Jake
    Mueller, Jochen F.
    Wilkins, Chris
    Padhye, Lokesh P.
    SCIENCE OF THE TOTAL ENVIRONMENT, 2019, 658 : 947 - 957