The Hot Strip Mill Scheduling Problem With Uncertainty: Robust Optimization Models and Solution Approaches

被引:6
|
作者
Zhang, Rui [1 ]
Song, Shiji [2 ]
Wu, Cheng [2 ]
机构
[1] Xiamen Univ Technol, Dept Ind Engn & Management, Xiamen 361024, Peoples R China
[2] Tsinghua Univ, Dept Automat, Beijing 100084, Peoples R China
关键词
Slabs; Job shop scheduling; Strips; Schedules; Production; Steel; Processor scheduling; Benders' decomposition; hot strip mill (HSM); multiobjective optimization; particle swarm optimization (PSO); production scheduling; robust optimization (RO); ITERATED GREEDY ALGORITHM; VEHICLE-ROUTING PROBLEM; EVOLUTIONARY ALGORITHMS;
D O I
10.1109/TCYB.2021.3135539
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this article, we focus on a biobjective hot strip mill (HSM) scheduling problem arising in the steel industry. Besides the conventional objective regarding penalty costs, we have also considered minimizing the total starting times of rolling operations in order to reduce the energy consumption for slab reheating. The problem is complicated by the inevitable uncertainty in rolling processing times, which means deterministic scheduling models will be ineffective. To obtain robust production schedules with satisfactory performance under all possible conditions, we apply the robust optimization (RO) approach to model and solve the scheduling problem. First, an RO model and an equivalent mixed-integer linear programming model are constructed to describe the HSM scheduling problem with uncertainty. Then, we devise an improved Benders' decomposition algorithm to solve the RO model and obtain exactly optimal solutions. Next, for coping with large-sized instances, a multiobjective particle swarm optimization algorithm with an embedded local search strategy is proposed to handle the biobjective scheduling problem and find the set of Pareto-optimal solutions. Finally, we conduct extensive computational tests to verify the proposed algorithms. Results show that the exact algorithm is effective for relatively small instances and the metaheuristic algorithm can achieve satisfactory solution quality for both small- and large-sized instances of the problem.
引用
收藏
页码:4079 / 4093
页数:15
相关论文
共 50 条
  • [31] A genetic algorithm approach to hot strip mill rolling scheduling problems
    Fang, HL
    Tsai, CH
    TENTH IEEE INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 1998, : 264 - 271
  • [32] ROBUST OPTIMIZATION APPROACHES FOR THE PERISHABLE PRODUCT INVENTORY ROUTING PROBLEM WITH DEMAND UNCERTAINTY
    He, Zhichao
    Liu, Ya
    Liu, Kun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2024, 20 (08) : 2740 - 2769
  • [33] DEVELOPMENT OF EXPERT SYSTEM FOR THE HOT STRIP MILL DRAFT-SCHEDULING
    MURAKAMI, S
    FURUKAWA, T
    KODOI, A
    UMEDA, H
    OKAZAKI, Y
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1993, 79 (03): : 339 - 344
  • [34] Development of hybrid evolutionary algorithms for production scheduling of hot strip mill
    Chen, Yu-Wang
    Lu, Yong-Zai
    Ge, Ming
    Yang, Gen-Ke
    Pan, Chang-Chun
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (02) : 339 - 349
  • [35] Two-stage conflict robust optimization models for cross-dock truck scheduling problem under uncertainty
    Xi, Xiang
    Liu Changchun
    Yuan, Wang
    Hay, Lee Loo
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2020, 144 (144)
  • [36] Robust optimization for process scheduling under uncertainty
    Li, Zukui
    Ierapetritou, Marianthi G.
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2008, 47 (12) : 4148 - 4157
  • [37] Optimization technology of scheduling for hot-rolling mill
    HUANG Kewei and DU Bin Automation Division
    Baosteel Technical Research, 2010, 4(S1) (S1) : 96 - 96
  • [38] Optimization of Temperature and Force Adaptation Algorithm in Hot Strip Mill
    Peng, Wen
    Liu, Zi-ying
    Yang, Xi-lin
    Cao, Jian-zhao
    Zhang, Dian-hua
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2014, 21 (03) : 300 - 305
  • [39] Control And Optimization Of Shape Set Model On Hot Strip Mill
    He Jian
    Li Bo-qun
    Zhuang Ye
    Wang Wen-zhi
    2013 32ND CHINESE CONTROL CONFERENCE (CCC), 2013, : 8378 - 8383
  • [40] Optimization of Temperature and Force Adaptation Algorithm in Hot Strip Mill
    Wen PENG
    Zi-ying LIU
    Xi-lin YANG
    Jian-zhao CAO
    Dian-hua ZHANG
    JournalofIronandSteelResearch(International), 2014, 21 (03) : 300 - 305