共 50 条
- [21] Research and application of multiple constrained hot strip mill scheduling problem based on HPSA INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 81 (9-12): : 1817 - 1829
- [22] Hybrid heuristics scheduling algorithm for hot strip mill ICNC 2007: THIRD INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, VOL 5, PROCEEDINGS, 2007, : 254 - +
- [23] Optimization of descaling nozzles in a hot strip mill MPT Metallurgical Plant and Technology International, 2000, 23 (05):
- [25] Hot Strip Mill Scheduling Under Consideration of Energy Consumption OPERATIONS RESEARCH PROCEEDINGS 2013, 2014, : 355 - 361
- [26] Optimization Of Hot Strip Finish Rolling Mill Schedule PROCEEDINGS OF THE 2016 6TH INTERNATIONAL CONFERENCE ON MACHINERY, MATERIALS, ENVIRONMENT, BIOTECHNOLOGY AND COMPUTER (MMEBC), 2016, 88 : 1692 - 1696
- [27] Optimization of work roll lubrication at the hot strip mill REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2001, 98 (11): : 1045 - +
- [28] Robust Coordinated Control of Hot Strip Mill Multivariable System 11TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION, ROBOTICS AND VISION (ICARCV 2010), 2010, : 2373 - 2378
- [30] A robust optimization solution to bottleneck generalized assignment problem under uncertainty Annals of Operations Research, 2015, 233 : 123 - 133