A Multi-Stage Methodology for Long-Term Open-Pit Mine Production Planning under Ore Grade Uncertainty

被引:2
|
作者
Jelvez, Enrique [1 ,2 ]
Ortiz, Julian [3 ]
Varela, Nelson Morales [4 ]
Askari-Nasab, Hooman [5 ]
Nelis, Gonzalo [6 ]
机构
[1] Univ Chile, Adv Min Technol Ctr, Delphos Mine Planning Lab, Santiago 8370448, Chile
[2] Univ Chile, Dept Min Engn, Santiago 8370448, Chile
[3] Queens Univ, Robert M Buchan Dept Min, Kingston, ON K7L 3N6, Canada
[4] Ecole Polytech Montreal, Dept Genies Civil Geol & Mines, Montreal, PQ H3T 1J4, Canada
[5] Univ Alberta, Dept Civil & Environm Engn, Edmonton, AB T6G 1H9, Canada
[6] DIMM Univ Tecn Federico Santa Maria, Res & Innovat Min Grp RIMG, Ave Vicuna Mackena 3939, Santiago 8940897, Chile
关键词
geological uncertainty; geostatistics; open-pit mine production planning; surface mining; stochastic mixed-integer linear programming; uncertainty assessment; TRADITIONAL OPTIMIZATION; STOCHASTIC OPTIMIZATION; DESIGN; SIMULATION; ALGORITHM; COMPLEX;
D O I
10.3390/math11183907
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
The strategic planning of open pit operations defines the best strategy for extraction of the mineral deposit to maximize the net present value. The process of strategic planning must deal with several sources of uncertainty; therefore, many authors have proposed models to incorporate it at each of its stages: Computation of the ultimate pit, optimization of pushbacks, and production scheduling. However, most works address it at each level independently, with few aiming at the whole process. In this work, we propose a methodology based on new mathematical optimization models and the application of conditional simulation of the deposit for addressing the geological uncertainty at all stages. We test the method in a real case study and evaluate whether incorporating uncertainty increases the quality of the solutions. Moreover, we benefit from our integrated framework to evaluate the relative impact of uncertainty at each stage. This could be used by decision-makers as a guide for detecting risks and focusing efforts.
引用
收藏
页数:19
相关论文
共 50 条
  • [1] Incorporation of Geometallurgical Attributes and Geological Uncertainty into Long-Term Open-Pit Mine Planning
    Morales, Nelson
    Seguel, Sebastian
    Caceres, Alejandro
    Jelvez, Enrique
    Alarcon, Maximiliano
    [J]. MINERALS, 2019, 9 (02):
  • [2] A multi-stage constraint programming approach to solve clustering problems in open-pit mine planning
    Mariz, Jorge Luiz Valenca
    Peroni, Rodrigo de Lemos
    Silva, Ricardo Martins de Abreu
    Badiozamani, Mohammad Mahdi
    Askari-Nasab, Hooman
    [J]. ENGINEERING OPTIMIZATION, 2024,
  • [3] A simulated annealing based stochastic long-term production scheduling of open-pit mines with stockpiling under grade uncertainty
    Danish, Abid Ali Khan
    Khan, Asif
    Muhammad, Khan
    [J]. INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2023, 37 (01) : 43 - 65
  • [4] OPEN-PIT ORE RESERVE ESTIMATION AND MINE PLANNING
    JOHNSTON, T
    CLAUSSEN, G
    BLACKWELL, G
    [J]. CIM BULLETIN, 1985, 78 (875): : 82 - 82
  • [5] A NEW METAHEURISTIC ALGORITHM FOR LONG-TERM OPEN-PIT PRODUCTION PLANNING
    Sattarvand, Javad
    Niemann-Delius, Christian
    [J]. ARCHIVES OF MINING SCIENCES, 2013, 58 (01) : 107 - 118
  • [6] COMPUTER-AIDED SHORT-TERM AND LONG-TERM MINE PLANNING OF THE BRENDA OPEN-PIT MINE
    CHICK, PDD
    [J]. CIM BULLETIN, 1984, 77 (869): : 22 - 22
  • [7] Improving performance of open-pit mine production scheduling problem under grade uncertainty by hybrid algorithms
    Tolouei, Kamyar
    Moosavi, Ehsan
    Bangian Tabrizi, Amir Hossein
    Afzal, Peyman
    Aghajani Bazzazi, Abbas
    [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2020, 27 (09) : 2479 - 2493
  • [8] Integrating geological uncertainty in long-term open pit mine production planning by ant colony optimization
    Gilani, Seyed-Omid
    Sattarvand, Javad
    [J]. COMPUTERS & GEOSCIENCES, 2016, 87 : 31 - 40
  • [9] A new open-pit multi-stage mine production timetabling model for drilling, blasting and excavating operations
    Kozan, E.
    Liu, S. Q.
    [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2016, 125 (01): : 47 - 53
  • [10] FLEXIBLE OPEN-PIT MINE DESIGN UNDER UNCERTAINTY
    Groeneveld, B.
    Topal, E.
    [J]. JOURNAL OF MINING SCIENCE, 2011, 47 (02) : 212 - 226