共 50 条
- [2] Incorporation of Geometallurgical Attributes and Geological Uncertainty into Long-Term Open-Pit Mine Planning [J]. MINERALS, 2019, 9 (02):
- [8] COMPUTER-AIDED SHORT-TERM AND LONG-TERM MINE PLANNING OF THE BRENDA OPEN-PIT MINE [J]. CIM BULLETIN, 1984, 77 (869): : 22 - 22
- [10] A CHANCE CONSTRAINED INTEGER PROGRAMMING MODEL FOR OPEN PIT LONG-TERM PRODUCTION PLANNING [J]. INTERNATIONAL JOURNAL OF ENGINEERING, 2008, 21 (04): : 407 - 418