Integrating geological uncertainty in long-term open pit mine production planning by ant colony optimization

被引:27
|
作者
Gilani, Seyed-Omid [1 ]
Sattarvand, Javad [1 ]
机构
[1] Sahand Univ Technol, Dept Min Engn, Tabriz 513351996, Iran
关键词
Open pit mine; Scheduling; Grade uncertainty; Meta-heuristics; Ant colony optimization;
D O I
10.1016/j.cageo.2015.11.008
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Meeting production targets in terms of ore quantity and quality is critical for a successful mining operation. In-situ grade uncertainty causes both deviations from production targets and general financial deficits. A new stochastic optimization algorithm based on ant colony optimization (ACO) approach is developed herein to integrate geological uncertainty described through a series of the simulated ore bodies. Two different strategies were developed based on a single predefined probability value (Prob) and multiple probability values (Prob), respectively in order to improve the initial solutions that created by deterministic ACO procedure. Application at the Sungun copper mine in the northwest of Iran demonstrate the abilities of the stochastic approach to create a single schedule and control the risk of deviating from production targets over time and also increase the project value. A comparison between two strategies and traditional approach illustrates that the multiple probability strategy is able to produce better schedules, however, the single predefined probability is more practical in projects requiring of high flexibility degree. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:31 / 40
页数:10
相关论文
共 50 条
  • [1] Long term production planning of open pit mines by ant colony optimization
    Shishvan, Masoud Soleymani
    Sattarvand, Javad
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (03) : 825 - 836
  • [2] Incorporation of Geometallurgical Attributes and Geological Uncertainty into Long-Term Open-Pit Mine Planning
    Morales, Nelson
    Seguel, Sebastian
    Caceres, Alejandro
    Jelvez, Enrique
    Alarcon, Maximiliano
    [J]. MINERALS, 2019, 9 (02):
  • [3] Integration of commodity price uncertainty in long-term open pit mine production planning by using an imperialist competitive algorithm
    Asl, M. Mokhtarian
    Sattarvand, J.
    [J]. JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2018, 118 (02) : 165 - 172
  • [4] Incorporating Operational Modes into long-Term Open-Pit Mine Planning Under Geological Uncertainty: An Optimization Combining Variable Neighborhood Descent with Linear Programming
    Quelopana, Aldo
    Navarra, Alessandro
    [J]. MINING METALLURGY & EXPLORATION, 2024,
  • [5] A Multi-Stage Methodology for Long-Term Open-Pit Mine Production Planning under Ore Grade Uncertainty
    Jelvez, Enrique
    Ortiz, Julian
    Varela, Nelson Morales
    Askari-Nasab, Hooman
    Nelis, Gonzalo
    [J]. MATHEMATICS, 2023, 11 (18)
  • [6] A stochastic particle swarm based model for long term production planning of open pit mines considering the geological uncertainty
    Gilani, Seyyed-Omid
    Sattarvand, Javad
    Hajihassani, Mohsen
    Abdullah, Shahrum Shah
    [J]. RESOURCES POLICY, 2020, 68
  • [7] Determination of value at risk for long-term production planning in open pit mines in the presence of price uncertainty
    Rahmanpour, M.
    Osanloo, M.
    [J]. JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2016, 116 (03) : 229 - 236
  • [8] COMPUTER-AIDED SHORT-TERM AND LONG-TERM MINE PLANNING OF THE BRENDA OPEN-PIT MINE
    CHICK, PDD
    [J]. CIM BULLETIN, 1984, 77 (869): : 22 - 22
  • [9] A NEW METAHEURISTIC ALGORITHM FOR LONG-TERM OPEN-PIT PRODUCTION PLANNING
    Sattarvand, Javad
    Niemann-Delius, Christian
    [J]. ARCHIVES OF MINING SCIENCES, 2013, 58 (01) : 107 - 118
  • [10] A CHANCE CONSTRAINED INTEGER PROGRAMMING MODEL FOR OPEN PIT LONG-TERM PRODUCTION PLANNING
    Gholamnejad, J.
    Osanloo, M.
    Khorram, E.
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING, 2008, 21 (04): : 407 - 418