Quantitative Risk Assessment Model and Optimization in Infrastructure Fast-Track Construction Projects

被引:2
|
作者
Martins, Claudia Garrido [1 ]
Bogus, Susan M. [2 ]
Valentin, Vanessa [2 ]
机构
[1] Univ North Carolina Charlotte, Dept Engn Technol & Construct Management, Charlotte, NC 28223 USA
[2] Univ New Mexico, Dept Civil Construct & Environm Engn, Albuquerque, NM 87131 USA
关键词
risk assessment; fast-track; overlapping; optimization; infrastructure; construction; project; TIME;
D O I
10.3390/infrastructures8040078
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction industry has extensively applied the fast-tracking approach to the demanding need for the fast delivery of infrastructure projects. However, the fast-track strategy might be threatened by distinctive risks or changes in risk characteristics that emerge when activities are overlapped (overlapping risks). This article proposes a risk assessment simulation model to quantify the economic impact of overlapping risks on fast-track infrastructure projects. The model uses Monte Carlo simulation and a proprietary engine solution for the optimization procedure. It quantifies the overlapping risk impacts in the project duration and cost that could originate in three different overlapping degrees and evaluates the optimal overlapping degree to reduce the impact of the overlapping risks. The model demonstration used a commercial renovation project. The results suggest that overlapping risks have a high potential impact on the total cost, although with a high probability of attaining the target duration. Eight top risks affected the total duration, cost, or both. The optimum overlapping to reduce the economic impact and achieve the target project duration combines different overlapping degrees. This study contribution is a model for fast-track projects considering overlapping risks, their impact characteristic as a distribution, and the potential relationship between these risks.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Conceptual Quantitative Model to Group Risks in Fast-Track Construction Projects
    Martins, Claudia Garrido
    Bogus, Susan M.
    Valentin, Vanessa
    [J]. COMPUTING IN CIVIL ENGINEERING 2019: VISUALIZATION, INFORMATION MODELING, AND SIMULATION, 2019, : 507 - 513
  • [2] Scheduling fast-track tunnel construction projects
    Rebar, Valerie Wollet
    [J]. NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 585 - 586
  • [3] Risk assessment of fast-track projects: a systems-based approach
    Rasul, Nazia
    Malik, Muhammad Sohail Anwar
    Bakhtawar, Beenish
    Thaheem, Muhammad Jamaluddin
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, : 1099 - 1114
  • [4] The Predictability of Fast-Track Projects
    Alhomadi, A. A.
    Dehghan, R.
    Ruwanpura, J. Y.
    [J]. PROCEEDINGS OF THE TWELFTH EAST ASIA-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION (EASEC12), 2011, 14
  • [5] STREAMLINE FAST-TRACK PROJECTS
    GIORNO, C
    [J]. HYDROCARBON PROCESSING, 1993, 72 (05): : C116 - F116
  • [6] An optimization-based model for maximizing the benefits of fast-track construction activities
    Khoueiry, Y.
    Srour, I.
    Yassine, A.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (08) : 1137 - 1146
  • [7] Fast-track your small projects
    Harding, JS
    [J]. CHEMICAL ENGINEERING PROGRESS, 1997, 93 (11) : 60 - 66
  • [8] Contractual Risks in Fast-Track Projects
    Moazzami, M.
    Dehghan, R.
    Ruwanpura, J. Y.
    [J]. PROCEEDINGS OF THE TWELFTH EAST ASIA-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION (EASEC12), 2011, 14
  • [9] Dynamic planning and control methodology for design/build fast-track construction projects
    Peña-Mora, F
    Li, M
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (01): : 1 - 17
  • [10] FAST-TRACK METHODS + CONSTRUCTION DOCUMENTATION
    AMOROSO, D
    [J]. PROGRESSIVE ARCHITECTURE, 1989, 70 (12): : 51 - &