共 50 条
- [31] Short term revamping of No. 6 blast furnace in Chiba Works REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1999, 96 (03): : 349 - 357
- [32] ENGINEERING AND EQUIPMENT FEATURES OF THE NO. 7 BLAST FURNACE AT ALGOMA. Iron and Steel Engineer, 1978, 55 (01): : 37 - 45
- [33] Vertical Soundings in the Wall of Blast Furnace No. 4 at Dunkirk. Cahiers d'Informations Techniques - Revue de Metallurgie, 1987, 84 (02): : 83 - 93
- [34] Blow-in of blast furnace No. 1 at ThyssenKrupp CSA in Brazil STAHL UND EISEN, 2012, 132 (01): : 17 - +
- [35] Elongation of CST No. 1 blast furnace - hearth wear control REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2004, 101 (04): : 261 - 267
- [38] CONTROLLING BLAST VOLUME WITH 2 TURBOCOMPRESSORS WORKING IN PARALLEL FOR ONE BLAST-FURNACE STEEL IN THE USSR, 1973, 3 (01): : 5 - 8
- [39] Investigation of process of the melting product draining-off in blast furnace Metallurg, 2001, (03): : 33 - 35