A new algorithm of the scheduling of a flexible manufacturing system based on genetic algorithm

被引:2
|
作者
Bao, Bizhen [1 ]
Duan, Zhao [1 ]
Xu, Ningbo [1 ]
Zhang, Hongzhou [1 ]
Luo, Yiheng [1 ]
Wang, Wei [2 ]
Yu, Xin [2 ]
Luo, Yang [2 ]
Liu, Xiaoyu [2 ]
机构
[1] Chengdu SIWI High Tech Ind Co Ltd, Chengdu, Peoples R China
[2] Sichuan Univ, Sch Mech Engn, Chengdu 610065, Peoples R China
关键词
Flexible manufacturing system; production scheduling; genetic algorithm; chromosome pairs coding;
D O I
10.1051/mfreview/2023010
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the flexible manufacturing system, a reasonable production scheduling is crucial in shortening the processing completion time and improving the equipment utilization. Traditional manual scheduling cannot effectively solve the complex workshop scheduling problems and cannot provide a scheduling solution that meets the requirements in a short period of time, which can lead to a decrease in processing efficiency. Aiming at the complex job shop scheduling problem, the genetic algorithm is used to find the optimal scheduling solution in this study, taking the number of overdue jobs, the total overdue time, the job completion time, the comprehensive load rate and the maximum load rate of the machine tool as the performance indicators of the scheduling algorithm. The chromosomes are designed as process gene chain and equipment gene chain to improve the diversity and the robustness to scheduling problems of chromosome through crossover, variation, selection and other processes. The impact of different parameter settings on the performance indicators of each scheduling algorithm is researched by adjusting the four algorithm-related parameters, and there has been a certain improvement in the results of the scheduling problems. This study provides a reference for the design and optimization of production scheduling algorithm based on genetic algorithm.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] A genetic scheduling algorithm based on knowledge for multiprocessor system
    Zhou, Lan
    Sun, Shi-Xin
    [J]. 2007 INTERNATIONAL CONFERENCE ON COMMUNICATIONS, CIRCUITS AND SYSTEMS PROCEEDINGS, VOLS 1 AND 2: VOL 1: COMMUNICATION THEORY AND SYSTEMS; VOL 2: SIGNAL PROCESSING, COMPUTATIONAL INTELLIGENCE, CIRCUITS AND SYSTEMS, 2007, : 900 - +
  • [42] Course Scheduling System of Iteration Based on Genetic Algorithm
    Ma, Zhenfei
    Li, Na
    [J]. 2012 7TH INTERNATIONAL CONFERENCE ON SYSTEM OF SYSTEMS ENGINEERING (SOSE), 2012, : 500 - 503
  • [43] A genetic algorithm based heuristic for scheduling of virtual manufacturing cells (VMCs)
    Kesen, Saadettin Erhan
    Das, Sanchoy K.
    Gungor, Zulal
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (06) : 1148 - 1156
  • [44] Improving Flexible Semiconductor Manufacturing System performance by a coloured Petri net-based scheduling algorithm
    Cavalieri, S
    Mirabella, O
    Marroccia, S
    [J]. ETFA '97 - 1997 IEEE 6TH INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION PROCEEDINGS, 1997, : 369 - 374
  • [45] Research on Flexible Job Shop Dynamic Scheduling Based on Genetic Algorithm
    Zhou Jing
    Yu Tianbiao
    Fang Junhua
    Gong Yadong
    Wang Wanshan
    [J]. PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 1702 - 1706
  • [46] A Genetic Algorithm-based Approach for Flexible Job Shop Scheduling
    Phanden, Rakesh Kumar
    Jain, Ajai
    Verma, Rajiv
    [J]. MECHANICAL AND AEROSPACE ENGINEERING, PTS 1-7, 2012, 110-116 : 3930 - 3937
  • [47] Fuzzy Flexible Resource Constrained Project Scheduling Based on Genetic Algorithm
    查鸿
    张连营
    [J]. Transactions of Tianjin University., 2014, 20 (06) - 474
  • [48] Fuzzy flexible resource constrained project scheduling based on genetic algorithm
    Zha H.
    Zhang L.
    [J]. Transactions of Tianjin University, 2014, 20 (6) : 469 - 474
  • [49] Fuzzy Flexible Resource Constrained Project Scheduling Based on Genetic Algorithm
    查鸿
    张连营
    [J]. Transactions of Tianjin University, 2014, (06) : 469 - 474
  • [50] ATTRIBUTE SELECTION FOR THE SCHEDULING OF FLEXIBLE MANUFACTURING SYSTEMS BASED ON FUZZY SET-THEORETIC APPROACH AND GENETIC ALGORITHM
    Liu, Yi-Hung
    Huang, Han-Pang
    Lin, Yu-Sheng
    [J]. JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2005, 22 (01) : 46 - 55