Short-term coordinated hybrid hydro-wind-solar optimal scheduling model considering multistage section restrictions

被引:15
|
作者
Liu, Benxi [1 ,2 ]
Liu, Tengyuan [1 ,2 ]
Liao, Shengli [1 ,2 ]
Lu, Jia [3 ]
Cheng, Chuntian [1 ,2 ]
机构
[1] Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China
[2] Dalian Univ Technol, Key Lab Ocean Energy Utilizat & Energy Conservat, Minist Educ, Dalian 116024, Peoples R China
[3] China Yangtze Power Co Ltd, Hubei Key Lab Intelligent Yangtze & Hydroelect Sci, Yichang 443000, Peoples R China
基金
中国国家自然科学基金;
关键词
Hydro-wind-solar; Multistage nested section; Peak shaving; Chance constraint; PEAK SHAVING OPERATION; SCENARIO REDUCTION; POWER; TRANSMISSION; PLANTS;
D O I
10.1016/j.renene.2023.119160
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With the large-scale integration of wind and solar power in China, the consumption of these intermittent renewable energies is severely restricted by the capacity of the transmission channel, which leads to massive renewable energy curtailment. Therefore, it would be beneficial to use limited transmission channels to absorb as much renewable energy as possible. In this paper, we propose a chance constraint-based multistage nested hydro-wind-solar coordinated optimal scheduling model to aid peak shaving while ensuring maximum power generation. First, multistage partitioned section chance constraints are introduced to mitigate the power congestion of the transmission network. Then, based on the principle of using hydropower to complement the uncertainty of wind and solar power, the compensation chance constraints are considered. To quantify the uncertainty of wind and solar power, their prediction errors are analyzed using the Gaussian mixture model. Finally, the model is recast and linearized into a mixed integer linear programming model. A case study of a hydro-wind-solar base in Southwest China demonstrates that the proposed model can effectively leverage the regulation ability of hydropower to coordinate multiple power sources with the restrictions of multistage transmission sections, effectively alleviating the congestion of transmission channels and reducing the curtailment of renewable energy.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] Developing operating rules for a hydro-wind-solar hybrid system considering peak-shaving demands
    Wang, Jin
    Zhao, Zhipeng
    Zhou, Jinglin
    Cheng, Chuntian
    Su, Huaying
    APPLIED ENERGY, 2024, 360
  • [22] OPTIMAL SHORT-TERM HYDRO SCHEDULING INCLUDING SECURITY CONSTRAINTS
    JOHANNESEN, A
    GJELSVIK, A
    FOSSO, OB
    FLATABO, N
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (02) : 576 - 583
  • [23] Short-Term Optimal Operation Method for Hydro-Wind-Thermal Systems Considering Wind Power Uncertainty
    Lu, Jia
    Zhao, Jiaqi
    Zhang, Zheng
    Liu, Yaxin
    Xu, Yang
    Wang, Tao
    Yang, Yuqi
    ENERGIES, 2024, 17 (20)
  • [24] Coordinated Scheduling of Hydro-Thermal-Gas Systems in the Short-Term Horizon
    Talebi, Amir
    Sadeghi-Yazdankhah, Ahmad
    34TH INTERNATIONAL POWER SYSTEM CONFERENCE (PSC2019), 2019, : 579 - 583
  • [26] Aggregated Hydro Unit Based Model for Short-term Hydro Generation Scheduling
    Zhai, Qiaozhu
    Xiao, Xun
    Li, Xuan
    26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 4454 - 4459
  • [27] Optimal Scheduling of Large-Scale Wind-Hydro-Thermal Systems with Fixed-Head Short-Term Model
    Thang Trung Nguyen
    Ly Huu Pham
    Mohammadi, Fazel
    Kien, Le Chi
    APPLIED SCIENCES-BASEL, 2020, 10 (08):
  • [28] Short-term generation scheduling model of Fujian hydro system
    Wang, Jinwen
    ENERGY CONVERSION AND MANAGEMENT, 2009, 50 (04) : 1085 - 1094
  • [29] A hybrid chaotic genetic algorithm for short-term hydro system scheduling
    Yuan, XH
    Yuan, YB
    Zhang, YC
    MATHEMATICS AND COMPUTERS IN SIMULATION, 2002, 59 (04) : 319 - 327
  • [30] Short-term Coordinated Scheduling of Wind-pumped-hydro-thermal Power System With Multi-energy Complementarities
    Wang K.
    Luo X.
    Jia R.
    Zhou C.
    Dianwang Jishu/Power System Technology, 2020, 44 (10): : 3631 - 3640