A mathematical model for open pit mine production scheduling with Grade Engineering~? and stockpiling

被引:1
|
作者
Karo Fathollahzadeh [1 ]
Elham Mardaneh [2 ]
Mehmet Cigla [1 ]
Mohammad Waqar Ali Asad [1 ]
机构
[1] Western Australian School of Mines: Minerals, Energy and Chemical Engineering, Curtin University
[2] School of Electrical Engineering, Computing and Mathematical Sciences, Curtin University
关键词
D O I
暂无
中图分类号
TD804 [露天矿开采];
学科分类号
081901 ;
摘要
This paper presents the development and implementation of an innovative mixed integer programming based mathematical model for an open pit mining operation with Grade Engineering framework. Grade Engineering comprises a range of coarse-separation based pre-processing techniques that separate the desirable(i.e. high-grade) and undesirable(i.e. low-grade or uneconomic) materials and ensure the delivery of only selected quantity of high quality(or high-grade) material to energy, water, and cost-intensive processing plant. The model maximizes the net present value under a range of operational and processing constraints. Given that the proposed model is computationally complex, the authors employ a data preprocessing procedure and then evaluate the performance of the model at several practical instances using computation time, optimality gap, and the net present value as valid measures. In addition, a comparison of the proposed and traditional(without Grade Engineering) models reflects that the proposed model outperforms the traditional formulation.
引用
收藏
页码:717 / 728
页数:12
相关论文
共 50 条
  • [21] Fundamental tree algorithm in optimising production scheduling for open pit mine design
    Ramazan, S.
    Dagdelen, K.
    Johnson, T. B.
    [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2005, 114 (01): : 45 - 54
  • [22] An application of Branch and Cut to open pit mine scheduling
    Caccetta, L
    Hill, SP
    [J]. JOURNAL OF GLOBAL OPTIMIZATION, 2003, 27 (2-3) : 349 - 365
  • [23] An Application of Branch and Cut to Open Pit Mine Scheduling
    Louis Caccetta
    Stephen P. Hill
    [J]. Journal of Global Optimization, 2003, 27 : 349 - 365
  • [24] CUTOFFS GRADE CALCULATIONS FOR AN OPEN-PIT MINE
    JOHN, HT
    [J]. CIM BULLETIN, 1985, 78 (879): : 73 - 75
  • [25] CUTOFFS GRADE CALCULATION FOR THE OPEN-PIT MINE
    JOHN, T
    [J]. CIM BULLETIN, 1984, 77 (863): : 91 - 91
  • [26] Scheduling of open-pit phosphate mine extraction
    Azzamouri, Ahlam
    Fenies, Pierre
    Fontane, Frederic
    Giard, Vincent
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (23) : 7122 - 7141
  • [27] A Genetic algorithm scheme for large scale open-pit mine production scheduling
    Azadi, Nooshin
    Mirzaei-Nasirabad, Hossein
    Mousavi, Amin
    [J]. MINING TECHNOLOGY-TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY, 2023, 132 (04) : 225 - 236
  • [28] Joint stochastic optimisation of open-pit mine production scheduling with ramp design
    Cutler, Jacob
    Dimitrakopoulos, Roussos
    [J]. INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2024, 38 (06) : 480 - 495
  • [29] Stochastic Open-Pit Mine Production Scheduling: A Case Study of an Iron Deposit
    Maleki, Mohammad
    Jelvez, Enrique
    Emery, Xavier
    Morales, Nelson
    [J]. MINERALS, 2020, 10 (07) : 1 - 19
  • [30] A Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty
    Tolouei, K.
    Moosavi, E.
    Tabrizi, A. H. Bangian
    Afzal, P.
    Bazzazi, A. Aghajani
    [J]. JOURNAL OF MINING AND ENVIRONMENT, 2020, 11 (03): : 721 - 736