A Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty

被引:5
|
作者
Tolouei, K. [1 ]
Moosavi, E. [1 ]
Tabrizi, A. H. Bangian [1 ]
Afzal, P. [1 ]
Bazzazi, A. Aghajani [2 ]
机构
[1] Islamic Azad Univ, Dept Petr & Min Engn, South Tehran Branch, Tehran, Iran
[2] Univ Kashan, Dept Min Engn, Kashan, Iran
来源
JOURNAL OF MINING AND ENVIRONMENT | 2020年 / 11卷 / 03期
关键词
Open pit mine; long-term production scheduling; Grade uncertainty; Lagrangian relaxation; Meta-heuristics methods; LAGRANGIAN-RELAXATION METHOD; BAT ALGORITHM; OPTIMIZATION; COMPLEX; DESIGN;
D O I
10.22044/jme.2020.9127.1803
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
It is significant to discover a global optimization in the problems dealing with large dimensional scales to increase the quality of decision-making in the mining operation. It has been broadly confirmed that the long-term production scheduling (LTPS) problem performs a main role in mining projects to develop the performance regarding the obtainability of constraints, while maximizing the whole profits of the project in a specific period. There is a requirement for improving the scheduling methodologies to get a good solution since the production scheduling problems are non-deterministic polynomial-time hard. The current paper introduces the hybrid models so as to solve the LTPS problem under the condition of grade uncertainty with the contribution of Lagrangian relaxation (LR), particle swarm optimization (PSO), firefly algorithm (FA), and bat algorithm (BA). In fact, the LTPS problem is solved under the condition of grade uncertainty. It is proposed to use the LR technique on the LTPS problem and develop its performance, speeding up the convergence. Furthermore, PSO, FA, and BA are projected to bring up-to-date the Lagrangian multipliers. The consequences of the case study specifies that the LR method is more influential than the traditional linearization method to clarify the large-scale problem and make an acceptable solution. The results obtained point out that a better presentation is gained by LR-FA in comparison with LR-PSO, LR-BA, LR-Genetic Algorithm (GA), and traditional methods in terms of the summation net present value. Moreover, the CPU time by the LR-FA method is approximately 16.2% upper than the other methods.
引用
收藏
页码:721 / 736
页数:16
相关论文
共 50 条
  • [1] Improving performance of open-pit mine production scheduling problem under grade uncertainty by hybrid algorithms
    Tolouei, Kamyar
    Moosavi, Ehsan
    Bangian Tabrizi, Amir Hossein
    Afzal, Peyman
    Aghajani Bazzazi, Abbas
    [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2020, 27 (09) : 2479 - 2493
  • [2] An optimisation approach for uncertainty-based long-term production scheduling in open-pit mines using meta-heuristic algorithms
    Tolouei, Kamyar
    Moosavi, Ehsan
    Tabrizi, Amir Hossein Bangian
    Afzal, Peyman
    Bazzazi, Abbas Aghajani
    [J]. INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2021, 35 (02) : 115 - 140
  • [3] A new methodology for the open-pit mine production scheduling problem
    Samavati, Mehran
    Essam, Daryl
    Nehring, Micah
    Sarker, Ruhul
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2018, 81 : 169 - 182
  • [4] A New Algorithm for the Open-Pit Mine Production Scheduling Problem
    Chicoisne, Renaud
    Espinoza, Daniel
    Goycoolea, Marcos
    Moreno, Eduardo
    Rubio, Enrique
    [J]. OPERATIONS RESEARCH, 2012, 60 (03) : 517 - 528
  • [5] A variable neighbourhood descent algorithm for the open-pit mine production scheduling problem with metal uncertainty
    Lamghari, Amina
    Dimitrakopoulos, Roussos
    Ferland, Jacques A.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2014, 65 (09) : 1305 - 1314
  • [6] A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty
    Lamghari, Amina
    Dimitrakopoulos, Roussos
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 222 (03) : 642 - 652
  • [7] A local branching heuristic for the open pit mine production scheduling problem
    Samavati, Mehran
    Essam, Daryl
    Nehring, Micah
    Sarker, Ruhul
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 257 (01) : 261 - 271
  • [8] Aggregation heuristic for the open-pit block scheduling problem
    Jelvez, Enrique
    Morales, Nelson
    Nancel-Penard, Pierre
    Peypouquet, Juan
    Reyes, Patricio
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 249 (03) : 1169 - 1177
  • [9] Meta-heuristic optimization algorithms for prediction of fly-rock in the blasting operation of open-pit mines
    Mahmoodzaden, Arsala
    Nejati, Hamid Reza
    Mohammadi, Mokhta
    Ibrahim, Hawkar Hashim
    Rashidi, Shima
    Mohammed, Adil Hussein
    [J]. GEOMECHANICS AND ENGINEERING, 2022, 30 (06) : 489 - 502
  • [10] Open-Pit Mine Production Planning and Scheduling: A Research Agenda
    Samavati, Mehran
    Essam, Daryl L.
    Nehring, Micah
    Sarker, Ruhul
    [J]. DATA AND DECISION SCIENCES IN ACTION, 2018, : 221 - 226