共 50 条
- [23] Optimization based scheduling for a class of production systems with integral constraints [J]. SCIENCE IN CHINA SERIES E-TECHNOLOGICAL SCIENCES, 2009, 52 (12): : 3533 - 3544
- [24] Optimization based scheduling for a class of production systems with integral constraints [J]. Science in China Series E: Technological Sciences, 2009, 52 : 3533 - 3544
- [26] A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints [J]. Annals of Operations Research, 2017, 248 : 1 - 24
- [28] Dynamic production planning and scheduling system based on drum-buffer-rope theory [J]. PROCEEDINGS OF THE 2005 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (12TH), VOLS 1- 3, 2005, : 827 - 831
- [29] Module Development of Piping System Design with Rule Based Algorithms [J]. RECENT PROGRESS ON: MECHANICAL, INFRASTRUCTURE AND INDUSTRIAL ENGINEERING, 2020, 2227
- [30] Module Development of Piping System Design with Rule Based Algorithms [J]. 4TH INTERNATIONAL TROPICAL RENEWABLE ENERGY CONFERENCE (I-TREC 2019), 2020, 2255