A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints

被引:1
|
作者
Noura Al-Dhaheri
Ali Diabat
机构
[1] Masdar Institute of Science and Technology,Department of Engineering Systems and Management
来源
关键词
Quay crane scheduling; Container terminals; Ship stability; Lagrangian relaxation; Maritime logistics;
D O I
暂无
中图分类号
学科分类号
摘要
The quay crane scheduling problem is one of the major problems of quayside operational planning in container terminals. The operational efficiency of quay cranes is a large determinant of the overall container terminal efficiency; thus, in an effort to maximize throughput, more and more emphasis is placed on systematically addressing and improving quay crane operations. However, the resulting formulations are highly complex and thus not solvable using commercial software. In the first part of the present paper, we develop a formulation that overcomes this challenge. This allows for solving the model using CPLEX, even for large size instances, which other notable work from the literature fails to solve. The second part of this paper addresses a crucial point which has rarely been accounted for, which is ship stability. A heuristic is developed to solve the extended problem, as it is no longer solvable in CPLEX. The remaining objective of this work is to extend this problem to the multi-ship case. However, once again the problem is insolvable for large instances using CPLEX, even without accounting for stability constraints. We develop a Lagrangian relaxation based algorithm that decomposes the problem by ship, which is solved efficiently as a single ship case. The Lagrangian multipliers are updated using the cutting plane method and the solution of the Lagrangian master problem provides an upper bound on the optimal value of the Lagrangian lower bound. Upper bounds on the optimal value of the original problem are obtained using a constructive heuristic, and through computational experiments we demonstrate the performance of the Lagrangian relaxation-based procedures.
引用
收藏
页码:1 / 24
页数:23
相关论文
共 18 条
  • [1] A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints
    Al-Dhaheri, Noura
    Diabat, Ali
    [J]. ANNALS OF OPERATIONS RESEARCH, 2017, 248 (1-2) : 1 - 24
  • [2] The Quay Crane Scheduling Problem With Stability Constraints
    Zhang, Zizhen
    Liu, Ming
    Lee, Chung-Yee
    Wang, Jiahai
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2018, 15 (03) : 1399 - 1412
  • [3] A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem
    Fu, Yi-Min
    Diabat, Ali
    [J]. APPLIED MATHEMATICAL MODELLING, 2015, 39 (3-4) : 1194 - 1201
  • [4] A heuristic for the quay crane scheduling problem based on contiguous bay crane operations
    Lu, Zhiqiang
    Han, Xiaole
    Xi, Lifeng
    Erera, Alan L.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (12) : 2915 - 2928
  • [5] In-port multi-ship routing and scheduling problem with draft limits
    Mahmoodjanloo, Mehdi
    Chen, Gang
    Asian, Sobhan
    Iranmanesh, Seyed Hossein
    Tavakkoli-Moghaddam, Reza
    [J]. MARITIME POLICY & MANAGEMENT, 2021, 48 (07) : 966 - 987
  • [6] The quay crane scheduling problem with nonzero crane repositioning time and vessel stability constraints
    Al-Dhaheri, Noura
    Jebali, Aida
    Diabat, Ali
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 94 : 230 - 244
  • [7] An improved Lagrangian relaxation-based heuristic for a joint location-inventory problem
    Diabat, Ali
    Battia, Olga
    Nazzal, Dima
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2015, 61 : 170 - 178
  • [8] Combined cargo allocation and multi-ship routing and scheduling problem: application in the fertilizer industry
    dos Santos, Pietro Tiaraju Giavarina
    Borenstein, Denis
    [J]. TOP, 2024,
  • [9] A multi-vessel quay crane assignment and scheduling problem: Formulation and heuristic solution approach
    Fu, Yi-Min
    Diabat, Ali
    Tsai, I-Tsung
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2014, 41 (15) : 6959 - 6965
  • [10] A static-hybrid berth allocation problem with multi ship crane scheduling
    Aljasmi, Alia
    Kaabi, Reem Al
    Al Hassani, Noura
    [J]. 2016 7TH INTERNATIONAL CONFERENCE ON INFORMATION, INTELLIGENCE, SYSTEMS & APPLICATIONS (IISA), 2016,