Deepwater Well Control Automated Shut-In Method and Simulation System

被引:0
|
作者
Long, Zhenyu [1 ]
Li, Jun [1 ]
Yang, Hongwei [1 ]
Guo, Boyun [2 ]
Chen, Kangping [3 ]
Wang, Biao [1 ]
Zhan, Jiahao [1 ]
Guan, Lichen [1 ]
机构
[1] China Univ Petr, Beijing 102249, Peoples R China
[2] Univ Louisiana, Lafayette, LA 70503 USA
[3] Arizona State Univ, Tempe, AZ 85287 USA
关键词
well control; automatic shut-in; programmable logic controller; computer vision;
D O I
10.1007/978-3-031-77489-8_65
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
With the current trend of low product quality of oil and gas resources becoming more and more obvious, deepwater and ultra-deepwater oil and gas have become an important field of oil and gas development in various countries. Deepwater oil and gas reservoirs are characterised by complex geological conditions and a narrow window of safe density, leading to the frequent occurrence of such complications as downhole kicks and overflows, which seriously threaten the lives of engineers and pollute the environment. The prerequisite for dealing with kick is to shut-in, but currently the drilling site shut-in relies on manual operation by multiple engineers, which not only takes a long time to operate, but is also affected by the subjective factors of the engineers. With the maturity of automation and artificial intelligence theory, well control shut-in also needs to develop in the direction of automation and intelligence, and carry out the research of well control automation shut-in system, so that the well can be shut-in quickly, automatically and efficiently when the drilling site kicks, blowouts and other complex situations. In this paper, using statistics and machine vision algorithms, an intelligent identification method of shut-in equipment operation status is established, and at the same time, a well control automated shut-in simulation system is designed based on PLC, and automated shut-in tests are carried out. The results show that the method of intelligent identification of operating status of shut-in equipment can identify the choke opening, the closure of each blowout preventer, and the working status of mud pump and top drive system in real-time without modifying the original equipment, and meanwhile, the well control automated shut-in simulation system can complete the shut-in within 5 min. This shows that the deepwater drilling well control automated shut-in method and simulation system can replace the engineer's operation to a certain extent, which provides a guarantee for the safety of deepwater and ultra-deepwater oil and gas drilling.
引用
收藏
页码:825 / 838
页数:14
相关论文
共 50 条
  • [21] Mechanism and prevention method of drill string uplift during shut-in after overflow in an ultra-deep well
    Yin Hu
    Si Menghan
    Li Qian
    Jang Hongwei
    Dai Liming
    PETROLEUM EXPLORATION AND DEVELOPMENT, 2018, 45 (06) : 1139 - 1145
  • [22] Unconventional well shut-in and reopening: Multiphase gas-oil interactions and their consequences on well performance
    Yassin, Mahmood Reza
    Alinejad, Amin
    Asl, Taregh Soleiman
    Dehghanpour, Hassan
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2022, 215
  • [23] Simulation computation of well killing with deepwater driller's method
    College of Petroleum Engineering, China University of Petroleum, Dongying 257061, China
    不详
    Shiyou Xuebao, 2008, 5 (786-790): : 786 - 790
  • [24] Effects of instantaneous shut-in of high production gas well on fluid flow in tubing
    Zhang Zhi
    Wang Jiawei
    Li Yanjun
    Luo Ming
    Zhang Chao
    PETROLEUM EXPLORATION AND DEVELOPMENT, 2020, 47 (03) : 642 - 650
  • [25] Mechanism and prevention method of drill string uplift during shut-in after overflow in an ultra-deep well
    YIN Hu
    SI Menghan
    LI Qian
    JANG Hongwei
    DAI Liming
    Petroleum Exploration and Development, 2018, 45 (06) : 1139 - 1145
  • [26] Effects of instantaneous shut-in of high production gas well on fluid flow in tubing
    Zhang Z.
    Wang J.
    Li Y.
    Luo M.
    Zhang C.
    Shiyou Kantan Yu Kaifa/Petroleum Exploration and Development, 2020, 47 (03): : 600 - 607
  • [27] Study on well hard shut-in experiment based on similarity principle and erosion of ram rubber
    Han, Chuanjun
    Zhang, Jie
    ENGINEERING FAILURE ANALYSIS, 2013, 32 : 202 - 208
  • [28] An advanced Driller's Method simulator for deepwater well control
    Feng, Jian
    Fu, Jianhong
    Chen, Ping
    Luo, Junfeng
    Liu, Zhengli
    Wei, Hongshu
    JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2016, 39 : 131 - 140
  • [29] Numerical Simulation Study on Optimal Shut-In Time in Jimsar Shale Oil Reservoir
    Chen, Xi
    Liao, Kai
    Lv, Zhao
    Zhu, Jian
    Wang, Junchao
    Li, Yuqi
    Wang, Fei
    FRONTIERS IN ENERGY RESEARCH, 2022, 10
  • [30] A Novel model for simulating the integration process of hydraulic fracturing, shut-in period, and well production
    Li, Yongming
    Luo, Ang
    Chen, Xi
    Cheng, Leiming
    Chang, Cheng
    Xie, Weiyang
    FRONTIERS IN ENERGY RESEARCH, 2022, 10