Numerical Simulation Study on Optimal Shut-In Time in Jimsar Shale Oil Reservoir

被引:3
|
作者
Chen, Xi [1 ]
Liao, Kai [2 ,3 ]
Lv, Zhao [1 ]
Zhu, Jian [2 ]
Wang, Junchao [1 ]
Li, Yuqi [2 ]
Wang, Fei [2 ]
机构
[1] PetroChina Xinjiang Oilfield Co, Karamay, Peoples R China
[2] China Univ Petr, Educ Minist Key Lab Petr Engn, Beijing, Peoples R China
[3] China Univ Petr, Inst Petr, Karamay, Peoples R China
关键词
shale oil; Jimsar; shut-in time; numerical simulation; imbibition replacement; PRODUCTION PERFORMANCE; HYDRAULIC FRACTURES; UNCERTAINTY;
D O I
10.3389/fenrg.2022.849064
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The volume fracturing technology along with horizontal well is the main technology to obtain commercial oil flow in shale reservoirs because of the low porosity and low permeability. Whether the fracturing fluid has the potential of shale matrix imbibition oil recovery after a large amount of slickwater injected into the reservoir is a research hotspot at present. Therefore, it is of great significance to study the law of imbibition and replacement during the shut-in time. Aiming at the Jimsar area, there are several steps in this study in order to explore the new law of fracturing fluid imbibition and oil recovery in shale reservoirs. Primarily, the distribution of pressure and saturation during fracturing time and shut-in time is accurately described by the numerical simulation method. Furthermore, the sensitivity analysis is carried out from two aspects of geological and fracture factors. Eventually, the evaluation of optimal shut-in time is taken by imbibition replacement balance. According to the numerical simulation results, the pressure diffuses rapidly among the matrix during the shut-in time in the hydrophilic reservoir. After 65 days of well shut-in, the whole reservoir tends to be at the same pressure and reaches the equilibrium of imbibition replacement. Contrarily, the pressure of the lipophilic reservoir diffuses slowly and only propagates in the secondary fracture or the matrix near the fractures. The fracture system remains a "high-pressure area" for a long time during shut-in. Additionally, the optimal shut-in time chart of different geological parameters and fracture parameters is drawn to optimize the shut-in time. This research work has a certain reference value for the optimization of shut-in time after fracturing in Jimsar and similar shale oil wells.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Numerical Simulation Study on Temporary Well Shut-In Methods in the Development of Shale Oil Reservoirs
    Zhang, Qitao
    Liu, Wenchao
    Wei, Jiaxin
    Taleghani, Arash Dahi
    Sun, Hai
    Wang, Daobing
    ENERGIES, 2022, 15 (23)
  • [2] Shut-in time optimization after fracturing in shale oil reservoirs
    WANG Qiang
    ZHAO Jinzhou
    HU Yongquan
    REN Lan
    ZHAO Chaoneng
    Petroleum Exploration and Development, 2022, (03) : 671 - 683
  • [3] Shut-in time optimization after fracturing in shale oil reservoirs
    Qiang, Wang
    Jinzhou, Zhao
    Yongquan, H. U.
    Lan, R. E. N.
    Chaoneng, Zhao
    PETROLEUM EXPLORATION AND DEVELOPMENT, 2022, 49 (03) : 671 - 683
  • [4] Effects of Imbibition and Compaction during Well Shut-In on Ultimate Shale Oil Recovery: A Numerical Study
    Wijaya, Nur
    Sheng, James
    SPE RESERVOIR EVALUATION & ENGINEERING, 2021, 24 (04) : 859 - 873
  • [5] Experimental Study on Field Actual Shut-In After Fracturing of Shale Gas Reservoir
    Ye Yang
    Zhiqiang Liu
    Arabian Journal for Science and Engineering, 2023, 48 : 16941 - 16951
  • [6] Numerical Study on the Effects of Imbibition on Gas Production and Shut-In Time Optimization in Woodford Shale Formation
    Zhou, Zhou
    Wei, Shiming
    Lu, Rong
    Li, Xiaopeng
    ENERGIES, 2020, 13 (12)
  • [7] Experimental Study on Field Actual Shut-In After Fracturing of Shale Gas Reservoir
    Yang, Ye
    Liu, Zhiqiang
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2023, 48 (12) : 16941 - 16951
  • [8] Shale Oil Shut-In and Flowback Mechanism and Optimization Strategy
    Lu, Zhiwei
    Li, Xiang
    Che, Mingguang
    Li, Xizhe
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2024, 146 (10):
  • [9] A New Methodology for Calculating Wellbore Pressure of Shut-in Wells in Numerical Reservoir Simulation
    Kayode, Babatope O.
    Jamiolahmady, Mahmoud
    Saudi Aramco Journal of Technology, 2021, 2021 (Summer): : 15 - 23
  • [10] Numerical investigation of shut-in time on stress evolution and tight oil production
    Zhao, Jinzhou
    Wang, Qiang
    Hu, Yongquan
    Ren, Lan
    Zhao, Chaoneng
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2019, 179 : 716 - 733