Commissioning of the cryogenic distribution system of the ESS superconducting linac

被引:0
|
作者
Arnold, P. [1 ]
Asensi, E. [1 ]
Elias, N. [1 ]
Fydrych, J. [1 ]
Nilsson, P. [1 ]
Zhang, J. [1 ]
Polinski, J. [2 ]
Duthil, P. [3 ]
Petersson, A. [4 ]
机构
[1] ESS ERIC, SE-22100 Lund, Sweden
[2] Wroclaw Univ Sci & Technol, Wroclaw, Poland
[3] Irene Joliot Curie Lab IJCLab, Orsay, France
[4] Lunds Tekniska Hgsk LTH, Lund, Sweden
关键词
D O I
10.1088/1757-899X/1301/1/012084
中图分类号
O414.1 [热力学];
学科分类号
摘要
The European Spallation Source (ESS) is a neutron-scattering facility being built with extensive international collaboration in Lund, Sweden. An essential part of the project is the linear 2.0 GeV proton accelerator. Its superconducting part is designed to comprise 13 spoke and 30 elliptical cryomodules that are cooled at 2K. The cryogenic distribution system (CDS) connects the refrigeration plant with the cryomodules via multi-transfer lines, individual valveboxes for every cryomodule and an endbox. It is designed, manufactured and installed under the responsibility of two ESS in-kind partners. The CDS for the spoke cryomodules (CDS-SL) is supplied by IJCLab, France, the CDS for the elliptical cryomodules (CDS-EL) is supplied by WUST, Poland. Pre-commissioning, commissioning and operation is done by ESS whereby IFJ PAN contributed with valuable advice. Pre-commissioning activities like loop checks, temperature curve validation, pressure sensor calibration or valve initialization and leak tightness tests followed after mechanical or electrical completion of the respective CDS parts and started in summer 2022. Eventually, the system was ready for commissioning and a first cooldown was performed in December 2022. Goal of this commissioning was to acceptance test and check off the system before pilot cryomodule installation in the tunnel started in March 2023. The paper describes diverse challenges regarding TAO and cryo operation. Test results, lessons learnt, and required modifications are discussed as well as preliminary results of retesting and an outlook.
引用
收藏
页数:8
相关论文
共 50 条
  • [41] Commissioning of spring-8 linac control system
    Sakaki, H
    Yoshikawa, H
    Asaka, T
    Hori, T
    Itoh, Y
    Kuba, A
    Mizuno, A
    Suzuki, S
    Taniuchi, T
    Yanagida, K
    Yokomizo, H
    PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS, 1998, : 2511 - 2513
  • [42] ATF linac commissioning
    Hayano, H
    PROCEEEDINGS OF THE XVIII INTERNATIONAL LINEAR ACCELERATOR CONFERENCE, VOLS 1 AND 2, 1996, 96 (07): : 547 - 551
  • [43] Cryogenic topics associated with the superconducting LINAC proposed for the COSY-facility
    Eichhorn, R
    Esser, F
    Laatsch, B
    Lennartz, M
    Schug, G
    Stassen, R
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS. 49A AND B, 2004, 710 : 560 - 567
  • [44] Development of Commissioning and operation of CSNS Cryogenic System
    He Chongchao
    Ye Bin
    Li Na
    Ding Meiying
    Wang Yaqiong
    Zhang Yu
    He Kun
    27TH INTERNATIONAL CRYOGENICS ENGINEERING CONFERENCE AND INTERNATIONAL CRYOGENIC MATERIALS CONFERENCE 2018 (ICEC-ICMC 2018), 2019, 502
  • [45] Status of the SPIRAL 2 LINAC cryogenic system
    Ghribi, A.
    Bernaudin, P. -E.
    Vassal, A.
    Bonne, F.
    CRYOGENICS, 2017, 85 : 44 - 50
  • [46] First Commissioning Results of the KSTAR Cryogenic System
    Kim, Yaung-Soo
    Park, Y. M.
    Lee, Y. J.
    Kwag, S. W.
    Chang, Y. B.
    Song, N. H.
    Woo, I. S.
    Park, H. T.
    Cho, K. W.
    Chang, H. S.
    Park, D. S.
    Joo, J. J.
    Moon, K. M.
    Park, K. R.
    Chu, Yong
    Yonekawa, Hirofumi
    Kim, Y. O.
    Bang, E. N.
    Kim, H. K.
    Kim, K. P.
    Park, M. K.
    Baek, S.
    Hong, J. S.
    Ha, T. H.
    Kim, Y. J.
    Hwang, I. S.
    Yang, H. L.
    Oh, Y. K.
    Bak, J. S.
    Kwon, M.
    Lee, G. S.
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2009, 19 (03) : 1577 - 1581
  • [47] Commissioning the cryogenic system of the first LHC sector
    Millet, F.
    Claudet, S.
    Ferlin, G.
    Perin, A.
    Rabehl, R.
    Riddone, G.
    Ronayette, L.
    Serio, L.
    Soubiran, M.
    Tavian, L.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 53A AND 53B, 2008, 985 : 1403 - +
  • [48] The RF distribution system for the ESS
    Aden, P.
    Edgecock, T. R.
    Naeem, D.
    Smith, R.
    Sunesson, A.
    Turner, N.
    Yogi, R.
    8TH INTERNATIONAL PARTICLE ACCELERATOR CONFERENCE (IPAC 2017), 2017, 874
  • [49] CRYOGENIC SYSTEM FOR A SUPERCONDUCTING SPECTROMETER
    PORTER, J
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 1983, 30 (04) : 2909 - 2910
  • [50] CRYOGENIC SYSTEM FOR SUPERCONDUCTING TOKAMAK
    SHIMAMOTO, S
    ANDO, T
    HIYAMA, T
    TSUJI, H
    TADA, E
    TAKAHASHI, Y
    YOSHIDA, K
    KOIZUMI, K
    KATO, T
    NAKAJIMA, H
    TAKAHASHI, O
    SANADA, Y
    IEEE TRANSACTIONS ON MAGNETICS, 1983, 19 (03) : 334 - 337