Commissioning of the cryogenic distribution system of the ESS superconducting linac

被引:0
|
作者
Arnold, P. [1 ]
Asensi, E. [1 ]
Elias, N. [1 ]
Fydrych, J. [1 ]
Nilsson, P. [1 ]
Zhang, J. [1 ]
Polinski, J. [2 ]
Duthil, P. [3 ]
Petersson, A. [4 ]
机构
[1] ESS ERIC, SE-22100 Lund, Sweden
[2] Wroclaw Univ Sci & Technol, Wroclaw, Poland
[3] Irene Joliot Curie Lab IJCLab, Orsay, France
[4] Lunds Tekniska Hgsk LTH, Lund, Sweden
关键词
D O I
10.1088/1757-899X/1301/1/012084
中图分类号
O414.1 [热力学];
学科分类号
摘要
The European Spallation Source (ESS) is a neutron-scattering facility being built with extensive international collaboration in Lund, Sweden. An essential part of the project is the linear 2.0 GeV proton accelerator. Its superconducting part is designed to comprise 13 spoke and 30 elliptical cryomodules that are cooled at 2K. The cryogenic distribution system (CDS) connects the refrigeration plant with the cryomodules via multi-transfer lines, individual valveboxes for every cryomodule and an endbox. It is designed, manufactured and installed under the responsibility of two ESS in-kind partners. The CDS for the spoke cryomodules (CDS-SL) is supplied by IJCLab, France, the CDS for the elliptical cryomodules (CDS-EL) is supplied by WUST, Poland. Pre-commissioning, commissioning and operation is done by ESS whereby IFJ PAN contributed with valuable advice. Pre-commissioning activities like loop checks, temperature curve validation, pressure sensor calibration or valve initialization and leak tightness tests followed after mechanical or electrical completion of the respective CDS parts and started in summer 2022. Eventually, the system was ready for commissioning and a first cooldown was performed in December 2022. Goal of this commissioning was to acceptance test and check off the system before pilot cryomodule installation in the tunnel started in March 2023. The paper describes diverse challenges regarding TAO and cryo operation. Test results, lessons learnt, and required modifications are discussed as well as preliminary results of retesting and an outlook.
引用
收藏
页数:8
相关论文
共 50 条
  • [31] Commissioning experiences with the spoke-based CW superconducting proton linac
    Fang Yan
    Hui-Ping Geng
    Cai Meng
    Ya-Liang Zhao
    Hua Shi
    Hua-Fu Ouyang
    Tong-Min Huang
    Fei-Si He
    Jian-Li Wang
    Rui Ge
    Yan-Feng Sui
    Qiang Ye
    Rong Liu
    Qun-Yao Wang
    Sheng-Chang Wang
    Jian-She Cao
    Wei-Min Pan
    Nuclear Science and Techniques, 2021, 32 (10) : 29 - 46
  • [32] Commissioning experiences with the spoke-based CW superconducting proton linac
    Fang Yan
    Hui-Ping Geng
    Cai Meng
    Ya-Liang Zhao
    Hua Shi
    Hua-Fu Ouyang
    Tong-Min Huang
    Fei-Si He
    Jian-Li Wang
    Rui Ge
    Yan-Feng Sui
    Qiang Ye
    Rong Liu
    Qun-Yao Wang
    Sheng-Chang Wang
    Jian-She Cao
    Wei-Min Pan
    Nuclear Science and Techniques, 2021, 32
  • [33] Commissioning of the hydrogen cryostat of the cryogenic moderator system of the European Spallation Source (ESS) for test purposes at the ZEA-1
    Rosenthal, E.
    Ressler, Y.
    Hannot, M.
    Natour, Prof G.
    ADVANCES IN CRYOGENIC ENGINEERING: PROCEEDINGS OF THE CRYOGENIC ENGINEERING CONFERENCE, CEC 2023, 2024, 1301
  • [34] Status of the cryogenic system commissioning at SNS
    Casagrande, F
    Campisi, I
    Gurd, P
    Hatfield, D
    Howell, M
    Stout, D
    Strong, H
    Arenius, D
    Creel, J
    Dixon, K
    Ganni, V
    Knudsen, P
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 3848 - 3850
  • [35] Commissioning of the SuperKEKB final focusing superconducting magnet cryogenic systems
    Zong, Zhanguo
    Ohuchi, Norihito
    Kawai, Masanori
    Arimoto, Yasushi
    Wang, Xudong
    Yamaoka, Hiroshi
    Kondo, Yoshinari
    Aoki, Kanae
    Ueki, Ryuichi
    Tsuchiya, Kiyosumi
    Endou, Tomonari
    27TH INTERNATIONAL CRYOGENICS ENGINEERING CONFERENCE AND INTERNATIONAL CRYOGENIC MATERIALS CONFERENCE 2018 (ICEC-ICMC 2018), 2019, 502
  • [36] Preliminary commissioning of cryogenic system of BESIII
    Zong, Z. G.
    Liu, L. Q.
    Zhang, L.
    Li, S. P.
    He, K.
    Xiong, L. Y.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 53A AND 53B, 2008, 985 : 461 - +
  • [37] RF commissioning of the compact energy recovery linac superconducting cavities in pulse mode
    Qiu, Feng
    Miura, Takako
    Arakawa, Dai
    Higashi, Nao
    Kako, Eiji
    Matsumoto, Toshihiro
    Michizono, Shinichiro
    Miyajima, Tsukasa
    Obina, Takashi
    Sakai, Hiroshi
    Umemori, Kensei
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2021, 985
  • [38] Optimization of gaseous helium heater for 2 K cryogenic system for VECC's superconducting electron linac
    Ahammed, Manir
    Ghosh, Siddhartha
    Saha, Subrata
    Singh, Sandeep Kumar
    Bhattacharya, Tamal Kumar
    DuttaGupta, Anjan
    Pal, Gautam
    Naik, Vaishali
    Chakrabarti, Alok
    CRYOGENICS, 2014, 63 : 103 - 109
  • [39] First Protons in the ESS LINAC
    M. Eshraqi
    L. Celona
    H. Danared
    C. Derrez
    E. Donegani
    T. Fay
    S. Gammino
    A. Garcia Sosa
    B. Gålnander
    S. Haghtalab
    H. Hassanzadegan
    A. Jansson
    E. Laface
    Y. Levinsen
    M. Lindroos
    J. P. Martins
    N. Milas
    R. Miyamoto
    M. Muñoz
    L. Neri
    E. Nilsson
    C. Plostinar
    Y. Qin
    T. Shea
    R. Tarkeshian
    C. Thomas
    Journal of Surface Investigation: X-ray, Synchrotron and Neutron Techniques, 2020, 14 : S42 - S49
  • [40] First Protons in the ESS LINAC
    Eshraqi, M.
    Celona, L.
    Danared, H.
    Derrez, C.
    Donegani, E.
    Fay, T.
    Gammino, S.
    Sosa, A. Garcia
    Galnander, B.
    Haghtalab, S.
    Hassanzadegan, H.
    Jansson, A.
    Laface, E.
    Levinsen, Y.
    Lindroos, M.
    Martins, J. P.
    Milas, N.
    Miyamoto, R.
    Munoz, M.
    Neri, L.
    Nilsson, E.
    Plostinar, C.
    Qin, Y.
    Shea, T.
    Tarkeshian, R.
    Thomas, C.
    JOURNAL OF SURFACE INVESTIGATION, 2020, 14 (SUPPL 1): : S42 - S49