Risk Assessment in Mass Housing Projects Using the Integrated Method of Fuzzy Shannon Entropy and Fuzzy EDAS

被引:0
|
作者
Hatefi, Seyed Morteza [1 ]
Ahmadi, Hanieh [1 ]
Tamosaitiene, Jolanta [2 ]
机构
[1] Shahrekord Univ, Fac Engn, Dept Civil Engn, Rahbar Blvd,POB 115, Shahrekord 8818634141, Iran
[2] Vilnius Gediminas Tech Univ, Inst Sustainable Construct, Fac Civil Engn, Sauletekio Al 11, LT-10223 Vilnius, Lithuania
关键词
risk; risk assessment; mass housing construction; fuzzy EDA; EDAS-F; fuzzy Shannon entropy; MULTICRITERIA DECISION-MAKING; CONSTRUCTION PROJECTS; MODEL;
D O I
10.3390/su17020528
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Mass building projects play a key role in the economic prosperity of any country. Furthermore, these projects are among the main drivers of environmental and social problems. In recent years, with the spread of the concept of sustainable development in the life cycle of construction projects and the dynamic and eventful nature of these projects, the issue of risk management in the sustainable construction industry has received more and more attention among researchers. The construction industry, like other industries, faces various risks. Therefore, it is crucial to identify and evaluate risks in mass construction projects due to the high volume of work. In this study, an integrated model based on fuzzy Shannon entropy and fuzzy EDAS is proposed for risk assessment in large-scale building projects. Initially, by reviewing related articles, 66 effective sub-indicators are identified and classified into 18 risk categories, including 6 external risks and 12 internal risks. Subsequently, a questionnaire is designed to assess the three factors of detection, probability of occurrence, and severity risks for each risk index. This questionnaire distributes to 15 mass production companies in the construction field in Isfahan. The fuzzy Shannon entropy method is then applied to determine the weight of risk factors. The weights of each factor, detection, probability of occurrence, and severity, are calculated as 0.386, 0.342, and 0.273, respectively. These weights are used in the fuzzy EDAS method to prioritize the identified risks in mass-building projects. The results of the fuzzy EDAS method determined the three most critical risks: "inflation rate volatility", "import/export restrictions", and "unforeseen climatic conditions". Additionally, three low-risk sub-indicators are obtained: "limitation on working hours", "collapse of the structure", and "unpredictable fire".
引用
收藏
页数:20
相关论文
共 50 条
  • [21] Risk Assessment for Geological Exploration Projects Based on the Fuzzy-DEMATEL Method
    Yang, Zhenhua
    Shi, Hua
    Tian, Ning
    Bai, Juan
    Han, Xiaoyu
    INTERNATIONAL JOURNAL OF ADVANCED COMPUTER SCIENCE AND APPLICATIONS, 2024, 15 (12) : 780 - 785
  • [22] Prioritization of sustainable mobility sharing systems using integrated fuzzy DIBR and fuzzy-rough EDAS model
    Pamucar, Dragan
    Simic, Vladimir
    Lazarevic, Dragan
    Dobrodolac, Momcilo
    Deveci, Muhammet
    SUSTAINABLE CITIES AND SOCIETY, 2022, 82
  • [23] Safety risk assessment in shopping center construction projects using Fuzzy Fault Tree Analysis method
    Aghaei P.
    Asadollahfardi G.
    Katabi A.
    Quality & Quantity, 2022, 56 (1) : 43 - 59
  • [24] Prioritizing Key Supply Chain Risks Using the Risk Assessment Matrix and Shannon Fuzzy Entropy - with a Case Study in the Home Appliance Industry
    Shahin, Arash
    Kianersi, Arezou
    Shali, Azarakhsh
    JOURNAL OF ADVANCED MANUFACTURING SYSTEMS, 2018, 17 (03) : 333 - 351
  • [25] Risk Assessment of Reservoir by Fuzzy Comprehensive Evaluation Method Based on Information Entropy
    Song, Yongjia
    Jin, Congcong
    Zhang, Xiancai
    Li, Jing
    CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1612 - 1618
  • [26] Application of fuzzy logic for risk assessment of investment projects
    Aliyev, E. A.
    Gabibov, I. A.
    Ismailova, R. A.
    Huseynov, R. O.
    SOCAR PROCEEDINGS, 2022, 2022 : 93 - 99
  • [27] Application of fuzzy logic for risk assessment of investment projects
    Rachkevych R.V.
    Chudyk I.I.
    Rachkevych I.А.
    Ahmed A.-T.
    SOCAR Proceedings, 2022, 2022 : 1 - 8
  • [28] A REVIEW OF FUZZY RISK ASSESSMENT MODELS FOR CONSTRUCTION PROJECTS
    Rezakhani, P.
    SLOVAK JOURNAL OF CIVIL ENGINEERING, 2012, 20 (03) : 35 - 40
  • [29] Risk Assessment of Innovative Projects Based on Fuzzy Modeling
    Samokhvalov, Yuri
    LECTURE NOTES IN COMPUTATIONAL INTELLIGENCE AND DECISION MAKING (ISDMCI 2020), 2020, 1246 : 265 - 281
  • [30] A novel fuzzy mechanism for risk assessment in software projects
    Suresh, K.
    Dillibabu, R.
    SOFT COMPUTING, 2020, 24 (03) : 1683 - 1705