Applying an Adaptation of the Prado Project Management Maturity Model in an Academic Context

被引:0
|
作者
Araujo, Ana [1 ]
Ribeiro, Pedro [1 ]
机构
[1] Univ Minho, Ctr ALGORITMI, Dept Informat Syst, P-4804533 Guimaraes, Portugal
关键词
Project management; Maturity models; Project management maturity models;
D O I
10.1007/978-3-030-72660-7_34
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The organization's strategy of a company is determinant in its performance. The need to develop methodologies to evaluate the performance of projects in organizations has a strong contribution to the development of maturity models. The lack of knowledge of these maturity models causes organizations to experience problems in the development and improvement of their project management processes. The main objective of this article is to adapt and apply a maturity model to assess the evolution of the maturity of project management practices in development teams in an academic environment. The Prado Project Management Maturity Model was applied to the project teams of the curricular subjects Development of Computer Applications of the second academic year and Information Systems and Technologies Project of the fourth academic year of the Integrated Masters in Engineering and Management of Information Systems course at the University of Minho. Through the application of the model, it was possible to compare the maturity between the two curricular units and to verify the effectiveness of the learning methods and strategies, and results in project management competencies throughout the course.
引用
收藏
页码:350 / 359
页数:10
相关论文
共 50 条
  • [1] Research on establishing and applying of construction project management maturity model
    Wang Dan
    Sun Ying
    Li Zhongfu
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 658 - 661
  • [2] Application of the Prado - Project Management Maturity Model at a R&D Institution of the Brazilian Federal Government
    Leite das Neves, Luiz Aldo
    icolini do Patrocinio Nunes, Luiz Eduardo
    Correa, Valesca Alves
    Rezende, Mirabel Cerqueira
    JOURNAL OF AEROSPACE TECHNOLOGY AND MANAGEMENT, 2013, 5 (04) : 459 - 465
  • [3] The project management maturity model
    Crawford, J. Kent
    INFORMATION SYSTEMS MANAGEMENT, 2006, 23 (04) : 50 - 58
  • [4] An Evaluation Model for Project Management Maturity
    Wu Lan
    Zhu Hongwen
    Li Mei
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 249 - 253
  • [5] The Application of Project Management Maturity Model
    Chang Xiaoni
    Wei Bin
    SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS II, PTS 1 AND 2, 2014, 475-476 : 1707 - 1712
  • [6] Project Management in the Biotech Context: Exploring the Interrelation between Maturity and Sustainable Project Management
    Magano, Jose
    Sousa Silva, Claudia
    Martins, Micaela
    SUSTAINABILITY, 2021, 13 (21)
  • [7] MATURITY ASSESSMENT IN PROJECT MANAGEMENT AT FEDERAL UNIVERSITY OF ALAGOAS USING THE MMGP-PRADO METHOD
    Campos, Marina Costa
    Dantas, Anderson de Barros
    Milito, Claudia Maria
    Costa Vieira da Silva, Luciana Santos
    REVISTA DE GESTAO E PROJETOS, 2020, 11 (01): : 1 - 16
  • [8] Project Management Maturity and Business Excellence in the Context of Industry 4.0
    Fajsi, Angela
    Moraca, Slobodan
    Milosavljevic, Marko
    Medic, Nenad
    PROCESSES, 2022, 10 (06)
  • [9] Study of construction project management maturity model
    Liqun, Liu
    Yuhua, An
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 355 - 360
  • [10] Research on Port Project Management Maturity Model
    Wang, Junmei
    Dong, Peiwu
    Qu, Guohua
    Zhang, XueZhou
    PROCEEDINGS OF 2013 6TH INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING (ICIII 2013) VOL 1, 2013, : 234 - 238