A reinforcement learning-based approach for solving multi-agent job shop scheduling problem

被引:1
|
作者
Dong, Zhuoran [1 ]
Ren, Tao [1 ]
Qi, Fang [1 ]
Weng, Jiacheng [1 ]
Bai, Danyu [2 ]
Yang, Jie [2 ]
Wu, Chin-Chia [3 ]
机构
[1] Northeastern Univ, Software Coll, Shenyang 110819, Peoples R China
[2] Dalian Maritime Univ, Sch Maritime Econ & Management, Dalian 116026, Peoples R China
[3] Feng Chia Univ, Dept Stat, Taichung, Taiwan
基金
中国国家自然科学基金;
关键词
Multi-agent; job shop scheduling; release dates; deep reinforcement learning; artificial bee colony algorithm; transformer; BEE COLONY ALGORITHM; GENETIC ALGORITHM; DISPATCHING RULES; OPTIMIZATION; BENCHMARKS; MACHINE;
D O I
10.1080/00207543.2024.2423807
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Wafer processing is the most expensive, time-consuming, and complex stage in semiconductor manufacturing. It varies significantly based on orders of customers (agents). Optimising the wafer processing flow in a multi-agent scenario can meet customised requirements, speed up delivery, and reduce costs. This work models wafer processing as a multi-agent job shop scheduling problem (MAJSP) with release dates. The objective is to minimise the total weighted makespan of agents. To address both dynamic and static scheduling scenarios in the MAJSP context, two deep reinforcement learning-based (DRL) methods are proposed. In a dynamic scheduling scenario, the statuses of orders and production resources can change at any moment. A DRL method called Graph Transformer Network (GTN) is proposed to rapidly generate high-quality solutions. In a static scheduling scenario, the production plan can be formulated based on predetermined demand and resource conditions. A novel hybrid method (GTN-DABC) that combines GTN with the discrete artificial bee colony algorithm (DABC) is proposed to provide high-quality production plans for manufacturers within an acceptable computation time. Experimental results demonstrate that the proposed GTN outperforms existing heuristics, and the well-designed GTN-DABC is more competitive than other meta-heuristics.
引用
收藏
页数:26
相关论文
共 50 条
  • [21] Deep reinforcement learning-based spatio-temporal graph neural network for solving job shop scheduling problem
    Gebreyesus, Goytom
    Fellek, Getu
    Farid, Ahmed
    Hou, Sicheng
    Fujimura, Shigeru
    Yoshie, Osamu
    EVOLUTIONARY INTELLIGENCE, 2025, 18 (01)
  • [22] A multi-agent agile scheduling system for Job-Shop problem
    Wang, Zhanjie
    Liu, Yanbo
    ISDA 2006: SIXTH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS DESIGN AND APPLICATIONS, VOL 2, 2006, : 679 - +
  • [23] Job Shop Scheduling Problem Based on Deep Reinforcement Learning
    Li, Baoshuai
    Ye, Chunming
    Computer Engineering and Applications, 2024, 57 (23) : 248 - 254
  • [24] Job Shop Dynamic Scheduling Model Based on Multi-Agent
    He, Li
    Liu, Yong-xian
    Xie, Hua-long
    Zhang, Yu
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 829 - +
  • [25] New local diversification techniques for flexible job shop scheduling problem with a multi-agent approach
    Meriem Ennigrou
    Khaled Ghédira
    Autonomous Agents and Multi-Agent Systems, 2008, 17 : 270 - 287
  • [26] New local diversification techniques for flexible job shop scheduling problem with a multi-agent approach
    Ennigrou, Meriem
    Ghedira, Khaled
    AUTONOMOUS AGENTS AND MULTI-AGENT SYSTEMS, 2008, 17 (02) : 270 - 287
  • [27] Dynamic flexible job-shop scheduling by multi-agent reinforcement learning with reward-shaping
    Zhang, Lixiang
    Yan, Yan
    Yang, Chen
    Hu, Yaoguang
    ADVANCED ENGINEERING INFORMATICS, 2024, 62
  • [28] Deep Reinforcement Learning-Based Job Shop Scheduling of Smart Manufacturing
    Elsayed, Eman K.
    Elsayed, Asmaa K.
    Eldahshan, Kamal A.
    CMC-COMPUTERS MATERIALS & CONTINUA, 2022, 73 (03): : 5103 - 5120
  • [29] A new immune multi-agent system for the flexible job shop scheduling problem
    Xiong, Wei
    Fu, Dongmei
    JOURNAL OF INTELLIGENT MANUFACTURING, 2018, 29 (04) : 857 - 873
  • [30] A new immune multi-agent system for the flexible job shop scheduling problem
    Wei Xiong
    Dongmei Fu
    Journal of Intelligent Manufacturing, 2018, 29 : 857 - 873