Economic Analysis of the Operation of a Hydropower Plant in a Wastewater Treatment Plant: Toruń, Poland

被引:0
|
作者
Tomczyk, Pawel [1 ]
Mastalerek, Krzysztof [2 ]
Kociszewski, Karol [3 ]
Orzepowski, Wojciech [4 ]
Wiatkowski, Miroslaw [1 ]
机构
[1] Wroclaw Univ Environm & Life Sci, Inst Environm Engn, Pl Grunwaldzki 24, PL-50365 Wroclaw, Poland
[2] Eneris Alternat Fuels Sp zoo, Koszykowa 65, PL-00667 Warsaw, Poland
[3] Wroclaw Univ Econ & Business, Dept Ecol Econ, Komandorska 118-120, PL-53 3405 Wroclaw, Poland
[4] Wroclaw Univ Environm & Life Sci, Dept Environm Protect & Dev, Pl Grunwaldzki 24, PL-50363 Wroclaw, Poland
关键词
renewable energy sources; sustainable development; bioeconomy; climate change adaptation; cost-benefit analysis; investment payback period; ENERGY; SOLAR; TECHNOLOGIES;
D O I
10.3390/en18020406
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The energy industry is constantly changing and evolving. One of the visible solutions is the pursuit of low-emission solutions. One such solution is investment in renewable energy sources (RESs), including hydropower, which in 2023 will constitute a dominant share in the production of electricity from RESs (47.02%) in the world. One of the alternative solutions is the use of hydropower in wastewater treatment plants, whose global potential is estimated at about 4350 TWh. An important issue in the operation of these facilities is their profitability. This article presents an economic analysis of a hydropower plant in the wastewater treatment plant in Toru & nacute; (northern Poland) in order to assess its profitability in the context of profits, costs, and payback period. The analyses showed the profitability of 9 out of 12 characterized variants, with the payback period estimated for real variants at 10.75-23.74 years and for theoretical variants at 5.06-5.32 years. The most significant factor in reducing the payback period was the level of electricity production between years, while different types of settlements and changes in electricity sales prices played a lesser role. Taking into account all profitable variants, after 25 years of operation, the net income will amount to PLN 1.07 million for the actual variants and PLN 3.18 million for the theoretical variants. The work can contribute to understanding the specifics of the operation of such facilities, which is consistent with, among others, the goals of sustainable development, climate and energy policies, or the circular economy.
引用
收藏
页数:19
相关论文
共 50 条
  • [31] Assessment of the economic impact of environmental constraints on short-term hydropower plant operation
    Perez-Diaz, Juan I.
    Wilhelmi, Jose R.
    ENERGY POLICY, 2010, 38 (12) : 7960 - 7970
  • [32] Design and operation of a wastewater treatment plant treating low concentration of municipal wastewater
    Jin, DY
    Wang, BZ
    Wang, L
    WATER SCIENCE AND TECHNOLOGY, 1998, 38 (03) : 167 - 172
  • [33] Optimization of wastewater treatment plant operation for greenhouse gas mitigation
    Kim, Dongwook
    Bowen, James D.
    Ozelkan, Ertunga C.
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2015, 163 : 39 - 48
  • [34] Optimizing wastewater treatment plant operation in positive energy communities
    Lazaroiu, George Cristian
    Robescu, Lacramioara Diana
    Dumbrava, Virgil
    Roscia, Mariacristina
    2020 20TH IEEE INTERNATIONAL CONFERENCE ON ENVIRONMENT AND ELECTRICAL ENGINEERING AND 2020 4TH IEEE INDUSTRIAL AND COMMERCIAL POWER SYSTEMS EUROPE (EEEIC/I&CPS EUROPE), 2020,
  • [35] Upgrading of a small wastewater treatment plant: Design and operation aspects
    Hatziconstantinou, GJ
    Kalergis, CM
    Grivas, AP
    WATER SCIENCE AND TECHNOLOGY, 1995, 32 (07) : 111 - 117
  • [36] Characteristics of Sludge Node Operation at Wastewater Treatment Plant in Zory
    Zdebik, Dariusz
    Zawadzki, Piotr
    Pieczonka, Michal
    ROCZNIK OCHRONA SRODOWISKA, 2019, 21 (02): : 1445 - 1460
  • [37] TWO YEARS OF THE OPERATION OF A DOMESTIC MBR WASTEWATER TREATMENT PLANT
    Pikorova, T.
    SLOVAK JOURNAL OF CIVIL ENGINEERING, 2012, 20 (02) : 28 - 36
  • [38] New simulators for the optimum management and operation of wastewater treatment plant
    Ayesa, E
    Garralon, G
    Rivas, A
    Suescun, J
    Larrea, L
    Plaza, F
    WATER SCIENCE AND TECHNOLOGY, 2001, 44 (2-3) : 1 - 8
  • [40] Optimization of the Operation of a Municipal Wastewater Treatment Plant with Hydrocotyle ranunculoides
    Quispe, Rebeca
    Soto, Mishel
    Ingaruca, Ever
    Bulege, Wilfredo
    Custodio, Maria
    JOURNAL OF ECOLOGICAL ENGINEERING, 2019, 20 (09): : 228 - 236