Economic Analysis of the Operation of a Hydropower Plant in a Wastewater Treatment Plant: Toruń, Poland

被引:0
|
作者
Tomczyk, Pawel [1 ]
Mastalerek, Krzysztof [2 ]
Kociszewski, Karol [3 ]
Orzepowski, Wojciech [4 ]
Wiatkowski, Miroslaw [1 ]
机构
[1] Wroclaw Univ Environm & Life Sci, Inst Environm Engn, Pl Grunwaldzki 24, PL-50365 Wroclaw, Poland
[2] Eneris Alternat Fuels Sp zoo, Koszykowa 65, PL-00667 Warsaw, Poland
[3] Wroclaw Univ Econ & Business, Dept Ecol Econ, Komandorska 118-120, PL-53 3405 Wroclaw, Poland
[4] Wroclaw Univ Environm & Life Sci, Dept Environm Protect & Dev, Pl Grunwaldzki 24, PL-50363 Wroclaw, Poland
关键词
renewable energy sources; sustainable development; bioeconomy; climate change adaptation; cost-benefit analysis; investment payback period; ENERGY; SOLAR; TECHNOLOGIES;
D O I
10.3390/en18020406
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The energy industry is constantly changing and evolving. One of the visible solutions is the pursuit of low-emission solutions. One such solution is investment in renewable energy sources (RESs), including hydropower, which in 2023 will constitute a dominant share in the production of electricity from RESs (47.02%) in the world. One of the alternative solutions is the use of hydropower in wastewater treatment plants, whose global potential is estimated at about 4350 TWh. An important issue in the operation of these facilities is their profitability. This article presents an economic analysis of a hydropower plant in the wastewater treatment plant in Toru & nacute; (northern Poland) in order to assess its profitability in the context of profits, costs, and payback period. The analyses showed the profitability of 9 out of 12 characterized variants, with the payback period estimated for real variants at 10.75-23.74 years and for theoretical variants at 5.06-5.32 years. The most significant factor in reducing the payback period was the level of electricity production between years, while different types of settlements and changes in electricity sales prices played a lesser role. Taking into account all profitable variants, after 25 years of operation, the net income will amount to PLN 1.07 million for the actual variants and PLN 3.18 million for the theoretical variants. The work can contribute to understanding the specifics of the operation of such facilities, which is consistent with, among others, the goals of sustainable development, climate and energy policies, or the circular economy.
引用
收藏
页数:19
相关论文
共 50 条
  • [21] Multivariate time series analysis for design and operation of a biological wastewater treatment plant
    Van Dongen, G
    Geuens, L
    WATER RESEARCH, 1998, 32 (03) : 691 - 700
  • [22] Multivariate time series analysis for design and operation of a biological wastewater treatment plant
    Karel de Grote-Hogeschool, Antwerp, Belgium
    Water Res., 3 (691-700):
  • [23] Automated operation of the Rhine hydropower plant Sackingen
    Mergner, Volker
    WASSERWIRTSCHAFT, 2008, 98 (06) : 29 - 31
  • [24] Hydropower plant in Rheinfelden officially put into operation
    Heimerl, Stephan
    WASSERWIRTSCHAFT, 2012, 102 (1-2) : 85 - 85
  • [25] Analysis and treatment of power oscillations in hydropower plant Dubrava
    Brezovec, Miljenko
    Kuzle, Igor
    Krpan, Matej
    Holjevac, Ninoslav
    IET RENEWABLE POWER GENERATION, 2020, 14 (01) : 80 - 89
  • [26] Optimal operation of a hydropower plant in a stochastic environment
    Figuerola-Ferretti, Isabel
    Schwartz, Eduardo
    Segarra, Ignacio
    QUANTITATIVE FINANCE, 2024, 24 (05) : 521 - 539
  • [27] Financial and Economic Investment Evaluation of Wastewater Treatment Plant
    Cetkovic, Jasmina
    Knezevic, Milos
    Lakic, Slobodan
    Zarkovic, Milos
    Vujadinovic, Radoje
    Zivkovic, Angelina
    Cvijovic, Jelena
    WATER, 2022, 14 (01)
  • [28] Peak hydropower plant operation based on stochastic dynamic programming analysis
    Tică, Eliza–Isabela
    Popa, Radu
    UPB Scientific Bulletin, Series D: Mechanical Engineering, 2016, 78 (04): : 191 - 206
  • [29] Analysis of the autonomous operation of an induction generator working in a small hydropower plant
    Gebczyk, Katarzyna
    Grakowski, Lukasz
    PRZEGLAD ELEKTROTECHNICZNY, 2019, 95 (07): : 76 - 79
  • [30] Effectiveness of Dairy and Domestic Wastewater Treatment and Technological Reliability of the Wastewater Treatment Plant in Michow, Poland
    Zawadzka, Beata
    Siwiec, Tadeusz
    Marzec, Michal
    JOURNAL OF ECOLOGICAL ENGINEERING, 2021, 22 (10): : 141 - 151