Optimizing Multi-Stage Project Portfolio Selection Considering Integrating Lifecycle and Interactions

被引:1
|
作者
Qiu, Biaobiao [1 ]
Dou, Yajie [1 ]
Chen, Ziyi [1 ]
机构
[1] Natl Univ Def Technol, Coll Syst Engn, Changsha 410073, Peoples R China
来源
SYSTEMS | 2024年 / 12卷 / 10期
基金
中国国家自然科学基金;
关键词
project portfolio selection; project interactions; multi-objective optimization; decision making; BRK-NSDE; PRODUCT PORTFOLIO; MANAGEMENT;
D O I
10.3390/systems12100414
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
Project portfolio selection is essential for a company to achieve its strategic goals. Due to constraints such as budget and manpower, companies cannot undertake all projects simultaneously and must prioritize those offering the highest value. Projects often interact and progress through various phases, adding complexity to the selection process. To address these challenges, this study introduces a model that accounts for the multi-stage execution of projects, their interactions, and multiple objectives. A novel multi-objective optimization algorithm is developed to solve this problem, along with a refined project selection method designed to offer decision-makers enhanced insights. Finally, a numerical example is provided to demonstrate the effectiveness of the proposed approach.
引用
收藏
页数:23
相关论文
共 50 条
  • [21] Optimizing multi-stage shrimp production systems
    Wang, JK
    Leiman, J
    AQUACULTURAL ENGINEERING, 2000, 22 (04) : 243 - 254
  • [22] MULTI-STAGE SELECTION FOR GENETIC GAIN
    YOUNG, SSY
    HEREDITY, 1964, 19 (01) : 131 - &
  • [23] Multi-stage green supplier selection for complex product system considering synergetic effect
    Guo J.
    Zhu W.
    Du B.
    Li Y.
    Wang L.
    Guo S.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2020, 26 (09): : 2573 - 2589
  • [24] Multi-objective multi-stage portfolio optimization with parallel GA
    Dhurandhar, M
    PDPTA'03: PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON PARALLEL AND DISTRIBUTED PROCESSING TECHNIQUES AND APPLICATIONS, VOLS 1-4, 2003, : 662 - 668
  • [25] PROJECT PORTFOLIO SELECTION BASED ON MULTI-PROJECT SYNERGY
    Wang, Zonghan
    Esangbedo, Moses Olabhele
    Bai, Sijun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2023, 19 (01) : 117 - 138
  • [26] Lifecycle cost analysis and performance evaluation of multi-stage screw compressors
    Kumar, Abhishek
    Kovacevic, Ahmed
    Stosic, Nikola
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2025,
  • [27] Financial optimisation of the scheduling for the multi-stage project
    Klimek, M.
    Lebkowski, P.
    BULLETIN OF THE POLISH ACADEMY OF SCIENCES-TECHNICAL SCIENCES, 2017, 65 (06) : 899 - 908
  • [28] Project Portfolio Selection considering interdependencies: A review of terminology and approaches
    Vieira, Gustavo Barbi
    Oliveira, Hevilla Souza
    Almeida, Jonatas Araujo de
    Belderrain, Mischel Carmen Neyra
    PROJECT LEADERSHIP AND SOCIETY, 2024, 5
  • [29] Selection of New Projects Considering the Synergistic Relationships in a Project Portfolio
    Ma, Ke
    Bai, Libiao
    Sun, Yichen
    Pan, Tong
    Shi, Victor
    Zhang, Yipei
    BUILDINGS, 2022, 12 (09)
  • [30] Optimizing the procedure of multi-stage yield selection for selecting the best from a population of candidate entries
    Ishii, T
    Yonezawa, K
    BREEDING SCIENCE, 2006, 56 (01) : 7 - 15