Cost Estimation for the Operation and Maintenance of Automated Monitoring and Early-Warning Equipment for Geological Hazards

被引:0
|
作者
Luo, Gan [1 ]
Tao, Mingqi [1 ]
Wu, Baohe [2 ]
Zhang, Mingzhi [3 ,4 ]
Zhong, Shuai [5 ]
Li, Junfeng [3 ,4 ]
Yang, Xiaodi [2 ]
机构
[1] China Geol Survey, Dev & Res Ctr, Beijing 100037, Peoples R China
[2] Chinese Acad Geol Sci, Inst Explorat Technol, Chengdu 611734, Peoples R China
[3] China Inst Geol Environm Monitoring, Beijing 100081, Peoples R China
[4] Minist Nat Resources, Observat & Res Stn Geol Hazard Sichuan Yaan, Yaan 625099, Peoples R China
[5] Chinese Acad Sci, Inst Geog Sci & Nat Resources Res, Beijing 100101, Peoples R China
基金
中国国家自然科学基金;
关键词
geological hazards; automated monitoring and early-warning equipment; operation and maintenance; cost estimation; budget standards; financial sustainability; BUDGET STANDARDS;
D O I
10.3390/su162310505
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Geological hazards impede regional economy sustainability. To limit their destructive impacts on human life and property, the Chinese government has independently developed automated monitoring and early-warning equipment, which has been deployed in over 250,000 locations nationwide, yielding effective early warnings. The smooth operation of this equipment necessitates substantial human, material, and financial resources for its maintenance. To allocate funds rationally, the Ministry of Finance of China has mandated the urgent establishment of budget standards for the operation and maintenance of automated monitoring and early-warning systems for geological hazards. Addressing the research gap in this area, this study meticulously develops a cost model, subcategorizing operating costs, maintenance costs, and management costs. Addressing the intricate issue of maintenance expenditures, this study ingeniously breaks down routine operations and urgent repairs stipulated in technical standards into personnel, materials, and vehicular needs for each equipment type. Considering the total manpower involved in equipment maintenance, the per-unit maintenance cost is determined. This method allocates costs to individual pieces of equipment, thereby sidestepping the quantification hurdle created by varying types and quantities of monitoring equipment at each monitoring site due to various geological disaster types and magnitudes, and technical personnel's maintenance responsibility for multiple equipment types in a single operation. Finally, incorporating regional adjustment coefficients, we have formulated theoretical costs for the operation and maintenance of automated monitoring and early-warning equipment for geological hazards. By contrasting theoretical costs with actual project budgets, the error margin is within 2%. Following nationwide consultation, these theoretical costs have been officially endorsed as the budget standard. These standards will lay the groundwork for project budgeting and review, facilitate efficient fund utilization, and ensure the financial sustainability of monitoring and warning systems for geological hazards. Concurrently, this paper bridges the global lack in budget norms for the operation and upkeep of automated geological disaster monitoring systems. The cost calculation model introduced serves as a pivotal reference globally for the evaluation of analogous system's operations and maintenance expenses.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] Analysis the Significant Hazards Monitoring and Early-Warning Technologies in Cities
    Luo, ZeMin
    MECHATRONICS AND INDUSTRIAL INFORMATICS, PTS 1-4, 2013, 321-324 : 2431 - 2434
  • [2] A WebGIS-based Monitoring and Early-warning System for Geological Disasters
    Yang, Haiquan
    Shen, Dingtao
    Huang, Huang
    2015 23RD INTERNATIONAL CONFERENCE ON GEOINFORMATICS, 2015,
  • [3] Early-warning model oriented to maintenance procedures
    Liu, Feng
    Zhang, Li
    Liu, Ying-Bo
    Duan, Jun
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (10): : 2109 - 2115
  • [4] Early warning systems for the mitigation of geological hazards - An overview
    Hamilton, RM
    EARLY WARNING SYSTEMS FOR NATURAL DISASTER REDUCTION, 2000, : 405 - 405
  • [5] Research on the Early-warning for Construction Project Cost Risk
    Liu Zi-mei
    Xie Ke-fan
    2013 FOURTH INTERNATIONAL CONFERENCE ON DIGITAL MANUFACTURING AND AUTOMATION (ICDMA), 2013, : 1127 - 1129
  • [6] Rich Internet GIS for Geological Disasters Specialized Monitoring and Early-warning in Three Gorges Reservoir Area
    Huang, Haifeng
    Yi, Wu
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON COOPERATION AND PROMOTION OF INFORMATION RESOURCES IN SCIENCE AND TECHNOLOGY(COINFO 10), 2010, : 27 - 30
  • [7] Research on Integrated Monitoring and Early-warning Platform for Safe High-speed Railway Operation
    Xiao, Xuemei
    Wang, Yanhui
    Jia, Limin
    Zhang, Chenchen
    FOURTH INTERNATIONAL CONFERENCE ON DIGITAL IMAGE PROCESSING (ICDIP 2012), 2012, 8334
  • [8] Cost estimation for the monitoring instrumentation of landslide early warning systems
    Sapena, Marta
    Gamperl, Moritz
    Kuehnl, Marlene
    Garcia-Londono, Carolina
    Singer, John
    Taubenboeck, Hannes
    NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2023, 23 (12) : 3913 - 3930
  • [9] The Aknes rockslide: Monitoring, threshold values and early-warning
    Blikra, Lars Harald
    LANDSLIDES AND ENGINEERED SLOPES: FROM THE PAST TO THE FUTURE, VOLS 1 AND 2, 2008, : 1089 - 1094
  • [10] Monitoring and early-warning system of enterprise financial prosperity
    Zhang, Youtang
    Huang, Yang
    Hong, Hong
    PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2010, : 383 - 388