Cost Estimation for the Operation and Maintenance of Automated Monitoring and Early-Warning Equipment for Geological Hazards

被引:0
|
作者
Luo, Gan [1 ]
Tao, Mingqi [1 ]
Wu, Baohe [2 ]
Zhang, Mingzhi [3 ,4 ]
Zhong, Shuai [5 ]
Li, Junfeng [3 ,4 ]
Yang, Xiaodi [2 ]
机构
[1] China Geol Survey, Dev & Res Ctr, Beijing 100037, Peoples R China
[2] Chinese Acad Geol Sci, Inst Explorat Technol, Chengdu 611734, Peoples R China
[3] China Inst Geol Environm Monitoring, Beijing 100081, Peoples R China
[4] Minist Nat Resources, Observat & Res Stn Geol Hazard Sichuan Yaan, Yaan 625099, Peoples R China
[5] Chinese Acad Sci, Inst Geog Sci & Nat Resources Res, Beijing 100101, Peoples R China
基金
中国国家自然科学基金;
关键词
geological hazards; automated monitoring and early-warning equipment; operation and maintenance; cost estimation; budget standards; financial sustainability; BUDGET STANDARDS;
D O I
10.3390/su162310505
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Geological hazards impede regional economy sustainability. To limit their destructive impacts on human life and property, the Chinese government has independently developed automated monitoring and early-warning equipment, which has been deployed in over 250,000 locations nationwide, yielding effective early warnings. The smooth operation of this equipment necessitates substantial human, material, and financial resources for its maintenance. To allocate funds rationally, the Ministry of Finance of China has mandated the urgent establishment of budget standards for the operation and maintenance of automated monitoring and early-warning systems for geological hazards. Addressing the research gap in this area, this study meticulously develops a cost model, subcategorizing operating costs, maintenance costs, and management costs. Addressing the intricate issue of maintenance expenditures, this study ingeniously breaks down routine operations and urgent repairs stipulated in technical standards into personnel, materials, and vehicular needs for each equipment type. Considering the total manpower involved in equipment maintenance, the per-unit maintenance cost is determined. This method allocates costs to individual pieces of equipment, thereby sidestepping the quantification hurdle created by varying types and quantities of monitoring equipment at each monitoring site due to various geological disaster types and magnitudes, and technical personnel's maintenance responsibility for multiple equipment types in a single operation. Finally, incorporating regional adjustment coefficients, we have formulated theoretical costs for the operation and maintenance of automated monitoring and early-warning equipment for geological hazards. By contrasting theoretical costs with actual project budgets, the error margin is within 2%. Following nationwide consultation, these theoretical costs have been officially endorsed as the budget standard. These standards will lay the groundwork for project budgeting and review, facilitate efficient fund utilization, and ensure the financial sustainability of monitoring and warning systems for geological hazards. Concurrently, this paper bridges the global lack in budget norms for the operation and upkeep of automated geological disaster monitoring systems. The cost calculation model introduced serves as a pivotal reference globally for the evaluation of analogous system's operations and maintenance expenses.
引用
收藏
页数:17
相关论文
共 50 条
  • [41] The Financial Risk Early-Warning Model in Expressway Project Operation and Its Application
    Liu Jianjun
    Chen Yun
    PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I AND II, 2009, : 728 - 733
  • [42] The early-warning model of equipment chain in gas pipeline based on DNN-HMM
    Qiu, Jingwei
    Liang, Wei
    Zhang, Laibin
    Yu, Xuchao
    Zhang, Meng
    JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING, 2015, 27 : 1710 - 1722
  • [43] Cost Early-Warning Model System of Large-Scale Construction Project
    Dai, Jingyi
    Ke, Dandan
    COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2022, 2022
  • [44] Overview of Comprehensive Risk Assessment Methods and Hazards Early Warning System for Geological Hazards in the Mountain Area
    Zhu, Chun
    Xu, Yingze
    Tao, Zhigang
    Zhu, Hong-Hu
    Cao, Chen
    He, Manchao
    REMOTE SENSING, 2023, 15 (09)
  • [45] Cost Early-Warning Model System of Large-Scale Construction Project
    Dai, Jingyi
    Ke, Dandan
    Computational Intelligence and Neuroscience, 2022, 2022
  • [46] DECISION SUPPORT AND MAINTENANCE SYSTEM FOR NATURAL HAZARDS, PROCESSES AND EQUIPMENT MONITORING
    Kozielski, Michal
    Sikora, Marek
    Wrobel, Lukasz
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2016, 18 (02): : 218 - 228
  • [47] Design and Develop Online Monitoring and Early-warning System of Crane Structural Stress
    XU Huping LIN Weiguo XU Changsheng School of AutomationWuhan University of TechnologyWuhan China School of Material EngineeringWuhan University of TedmologyWuhan China
    武汉理工大学学报, 2006, (S2) : 724 - 727
  • [48] Research on the Index System of Early-Warning Management of Power Grid Safety Monitoring
    Li Yulong
    PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I AND II, 2009, : 2436 - 2441
  • [49] Cost Estimation for Maintenance Contracts for Complex Asset/Equipment
    Rahman, A.
    Chattopadhyay, G.
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1355 - +
  • [50] Research on mechanism and monitoring and early-warning technology of landslide in Luoshan mining area
    Tao, Zhigang
    Zhang, Bin
    He, Manchao
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2011, 30 (SUPPL. 1): : 2931 - 2937