Key technology of pipe jacking construction in low temperature and cold area

被引:0
|
作者
Zhao, Yunfei [1 ]
Luo, Feilun [1 ]
Wang, Wenxue [1 ]
Zhang, Zhengyong [1 ]
Xiong, Liang [1 ]
Hao, Lijun [1 ]
Chen, Shenghua [2 ]
Xu, Tianshuo [3 ]
Ye, Peng [3 ]
机构
[1] SINOHYDRO BUREAU 5 Co., LTD, Sichuan,610000, China
[2] Zhejiang Hongkun Pipeline Engineering Co., Ltd., Ningbo,315800, China
[3] Faculty of Engineering, China University of Geosciences (Wuhan), Hubei,430074, China
关键词
Heating equipment - Jacks - Slurry pipelines;
D O I
10.1002/cepa.3205
中图分类号
学科分类号
摘要
With the development of pipe jacking technology, it has been widely used all over the country. Usually, the construction of slurry balanced pipe jacking will avoid the construction in cold winter areas. However, with the continuous breakthrough of pipe jacking length, in order to not interrupt the construction, necessary measures will be taken to carry out pipe jacking construction in severe cold areas in winter under special circumstances. Based on the construction of Jiaoliu River non-pressure tunnel jacking project in the tunnel section of Yinchao-Jiliao Water Conveyance Project, this paper introduces the key technologies of winter construction of pipe jacking project, including the construction of thermal insulation shed, boiler heat calculation, pipeline thermal insulation measures, mud heating system, etc., and carries out temperature monitoring in each position of pipe jacking pipe and thermal insulation shed, which verifies the feasibility of winter construction scheme of slurry balance pipe jacking, and provides reference for subsequent pipe jacking projects in similar cold regions. © 2025 Ernst & Sohn GmbH.
引用
收藏
页码:1159 / 1167
相关论文
共 50 条
  • [31] Fundamental study on effect of pipe jacking on deeper underground area
    Department of Earth Resources Engineering, Kyushu University, Fukuoka, Japan
    不详
    不详
    Int. No-Dig Conf. Exhibit., NO-DIG, (432-440):
  • [32] Research on key technology of pipe jacking drilling equipment for large-diameter rescue borehole of coal mine
    Wang L.
    Zhu Y.
    Zhang W.
    Liu H.
    Zhao W.
    Yang C.
    Wang G.
    Meitiandizhi Yu Kantan/Coal Geology and Exploration, 2022, 50 (11): : 58 - 66
  • [33] Ground Surface Deformation Caused by Pipe Jacking Construction in a Soft Soil Area: An Experiment-Based Study
    Tang, Junfeng
    Xu, Junkai
    Zhou, Dezhou
    Huang, Dong
    Zeng, Ke
    Li, Yuhang
    Chen, Zhuo
    BUILDINGS, 2023, 13 (07)
  • [34] The effect of post-construction settlement during pipe jacking construction phase on relative displacement of pipe section
    Zhenyu, Gao
    Haihong, Mo
    Jubo, Zeng
    Electronic Journal of Geotechnical Engineering, 2014, 19 (0W): : 7037 - 7048
  • [35] Study on Cold Insulation Construction Technology of LNG Low Temperature Storage Tank Wall
    Sheng, Xuan-Yu
    Shu, Jun-Man
    Chen, Jian
    Tian, Hui-Zhen
    Ling, Chen
    3RD ANNUAL INTERNATIONAL CONFERENCE ON MODERN EDUCATION AND SOCIAL SCIENCE (MESS 2017), 2017, 135 : 219 - 224
  • [36] CONSTRUCTION OF ELLIPTIC SECTIONAL UNDERPASS BY NEW PIPE JACKING METHOD.
    Takeshita, Sadao
    Quarterly Report of RTRI (Railway Technical Research Institute) (Japan), 1983, 24 (01): : 9 - 14
  • [37] Research on Dewatering Characteristics of Waste Slurry from Pipe Jacking Construction
    Jiang, Libing
    Zhen, Liang
    Wang, Jianfeng
    Zhang, Tao
    Huang, Xianwen
    MATERIALS, 2022, 15 (06)
  • [38] Study on soil-compacting effects induced by pipe jacking construction
    Wei Gang
    Wei Xin-jiang
    Xu Ri-qing
    ROCK AND SOIL MECHANICS, 2006, 27 (05) : 717 - 722
  • [39] Prediction of settlement induced by ground loss during pipe jacking construction
    Wei Gang
    Wu Hua-jun
    Chen Chun-lai
    ROCK AND SOIL MECHANICS, 2007, 28 (02) : 359 - 363
  • [40] The impact of pipe jacking method entrance and exit construction on the surrounding environment
    Qi Zongrun
    Liu Junyan
    Gong Ke
    2020 2ND INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ENVIRONMENT RESOURCES AND ENERGY MATERIALS, 2021, 634