Linear Programming Model Applied to Long-Term Mine Planning in Strip Mining Operations

被引:0
|
作者
Bassani, Marcel Antonio Arcari [1 ]
Guimaraes, Octavio R. A. [2 ]
Tavares, Flavio H. [2 ]
Cantadori, Breno [3 ]
Vicenzi, Ricardo [4 ]
Alves, Joao Lucas de Oliveira [5 ]
Mariz, Jorge Luiz Valenca [5 ]
Peroni, Rodrigo de Lemos [6 ]
机构
[1] Univ Fed Rio Grande do Sul, Min Engn Dept, Sect 4, 9500 Bento Goncalves Ave,Bldg 43427,Room 130, Porto Alegre, Brazil
[2] Alcoa, Rodovia PA 257,5,KM 0, Juruti, PA, Brazil
[3] Prominas Min, 1465 11th Paraiba St, Belo Horizonte, MG, Brazil
[4] Univ Fed Bahia, Polytech Sch, Mat Sci & Technol Dept, 02 Prof Aristides Novis Ave BA, BR-40210630 Salvador, Brazil
[5] Fed Univ Rio Grande do Sul UFRGS, Min Engn Dept, Sect 4, 9500 Bento Goncalves Ave,Bldg 43427,Room 103, Porto Alegre, RS, Brazil
[6] Fed Univ Rio Grande do Sul UFRGS, Min Engn Dept, Sect 4, 9500 Bento Goncalves Ave,Bldg 43427,Room 101, Porto Alegre, RS, Brazil
关键词
Optimization; Grade constraints; Bauxite operations; Scheduling; Sequencing;
D O I
10.1007/s42461-025-01185-5
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
Strip mining is largely employed in horizontal tabular deposits near the surface, such as coal and bauxite deposits. The deposit is first divided into panels, which are mined using parallel cuts called strips. The strips are a set of contiguous and subsequent blocks. The challenge is to determine the year of extraction of a set of blocks to maximize the total profit while respecting a series of boundary constraints. Many algorithms have been developed to solve this problem in an open-pit context. However, their application to strip mining operations has not been fully tested. In this paper, we propose a method to indicate the best period of extraction for each block in this kind of surface mining method. First, the method finds the best block sequence within each panel. Second, a linear programming model is used to find the optimal ore mass coming from each panel that maximizes the total profit. Last, the results of the panel optimization are used to update the block model at the block scale. The optimization is performed sequentially for a number of periods/years. The methodology is illustrated in a case study with data obtained from a real bauxite mine. The results show a feasible mine schedule that honours the mining capacity.
引用
收藏
页码:737 / 750
页数:14
相关论文
共 50 条
  • [41] Incorporating Operational Modes into long-Term Open-Pit Mine Planning Under Geological Uncertainty: An Optimization Combining Variable Neighborhood Descent with Linear Programming
    Quelopana, Aldo
    Navarra, Alessandro
    MINING METALLURGY & EXPLORATION, 2024, : 2769 - 2782
  • [42] An improved method for long-term stability evaluation of strip mining and pillar design
    Yu, Yang
    Deng, Ka-Zhong
    Luo, Yi
    Chen, Shen-en
    Zhuang, Hui-Fu
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2018, 107 : 25 - 30
  • [43] Long-term stability evaluation and coal pillar design methods for strip mining
    Yu Y.
    Deng K.
    Fan H.
    Meitan Xuebao/Journal of the China Coal Society, 2017, 42 (12): : 3089 - 3095
  • [44] LINEAR PROGRAMMING APPLIED TO A MINING-SMELTING OPERATION
    FAULKNER, GB
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1967, 60 (667): : 1297 - &
  • [45] OPTIMAL LONG-TERM CAMPAIGN PLANNING AND DESIGN OF BATCH-OPERATIONS
    SHAH, N
    PANTELIDES, CC
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1991, 30 (10) : 2308 - 2321
  • [47] LINEAR PROGRAMMING MODEL FOR SHORT TERM FINANCIAL PLANNING UNDER UNCERTAINTY
    POGUE, GA
    BUSSARD, RN
    SLOAN MANAGEMENT REVIEW, 1972, 13 (03): : 69 - 98
  • [48] Comparison between piecewise linear and non-linear approximations applied to the disaggregation of hydraulic generation in long-term operation planning
    Ramos, Tales Pulinho
    Marques Marcato, Andre Luis
    da Silva Brandi, Rafael Bruno
    Dias, Bruno Henriques
    da Silva Junior, Ivo Chaves
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 71 : 364 - 372
  • [49] A LINEAR-PROGRAMMING MODEL FOR LONG-RANGE CAPACITY PLANNING
    FETTER, RB
    MANAGEMENT SCIENCE, 1961, 7 (04) : 372 - 378
  • [50] Long-Term Health Care Planning: A Subset of Farm Transition Programming
    Hachfeld, Gary A.
    JOURNAL OF EXTENSION, 2015, 53 (02):