Linear Programming Model Applied to Long-Term Mine Planning in Strip Mining Operations

被引:0
|
作者
Bassani, Marcel Antonio Arcari [1 ]
Guimaraes, Octavio R. A. [2 ]
Tavares, Flavio H. [2 ]
Cantadori, Breno [3 ]
Vicenzi, Ricardo [4 ]
Alves, Joao Lucas de Oliveira [5 ]
Mariz, Jorge Luiz Valenca [5 ]
Peroni, Rodrigo de Lemos [6 ]
机构
[1] Univ Fed Rio Grande do Sul, Min Engn Dept, Sect 4, 9500 Bento Goncalves Ave,Bldg 43427,Room 130, Porto Alegre, Brazil
[2] Alcoa, Rodovia PA 257,5,KM 0, Juruti, PA, Brazil
[3] Prominas Min, 1465 11th Paraiba St, Belo Horizonte, MG, Brazil
[4] Univ Fed Bahia, Polytech Sch, Mat Sci & Technol Dept, 02 Prof Aristides Novis Ave BA, BR-40210630 Salvador, Brazil
[5] Fed Univ Rio Grande do Sul UFRGS, Min Engn Dept, Sect 4, 9500 Bento Goncalves Ave,Bldg 43427,Room 103, Porto Alegre, RS, Brazil
[6] Fed Univ Rio Grande do Sul UFRGS, Min Engn Dept, Sect 4, 9500 Bento Goncalves Ave,Bldg 43427,Room 101, Porto Alegre, RS, Brazil
关键词
Optimization; Grade constraints; Bauxite operations; Scheduling; Sequencing;
D O I
10.1007/s42461-025-01185-5
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
Strip mining is largely employed in horizontal tabular deposits near the surface, such as coal and bauxite deposits. The deposit is first divided into panels, which are mined using parallel cuts called strips. The strips are a set of contiguous and subsequent blocks. The challenge is to determine the year of extraction of a set of blocks to maximize the total profit while respecting a series of boundary constraints. Many algorithms have been developed to solve this problem in an open-pit context. However, their application to strip mining operations has not been fully tested. In this paper, we propose a method to indicate the best period of extraction for each block in this kind of surface mining method. First, the method finds the best block sequence within each panel. Second, a linear programming model is used to find the optimal ore mass coming from each panel that maximizes the total profit. Last, the results of the panel optimization are used to update the block model at the block scale. The optimization is performed sequentially for a number of periods/years. The methodology is illustrated in a case study with data obtained from a real bauxite mine. The results show a feasible mine schedule that honours the mining capacity.
引用
收藏
页码:737 / 750
页数:14
相关论文
共 50 条
  • [21] Long-term Planning Model for a CHP System Using Particle Swarm Optimization algorithm and Mixed Integer Linear Programming
    Takada, Koji
    Ikegami, Takashi
    2018 INTERNATIONAL CONFERENCE ON SMART ENERGY SYSTEMS AND TECHNOLOGIES (SEST), 2018,
  • [22] An efficient and accurate Mixed-integer linear programming model for long-term operations of large-scale hydropower systems
    Zhao, Zhipeng
    Cheng, ChunTian
    Yan, Lingzhi
    IET RENEWABLE POWER GENERATION, 2021, 15 (06) : 1178 - 1190
  • [23] Allowing for spatial consideration in long-term forest planning by linking linear programming with simulated annealing
    Öhman, K
    Eriksson, LA
    FOREST ECOLOGY AND MANAGEMENT, 2002, 161 (1-3) : 221 - 230
  • [24] PLANNING COMPANY OPERATIONS USING LINEAR PROGRAMMING
    AITKEN, EA
    CHEMICAL ENGINEER-LONDON, 1971, (248): : 145 - &
  • [25] LINEAR PROGRAMMING MODELS FOR PLANT OPERATIONS PLANNING
    ALLEN, DH
    BRITISH CHEMICAL ENGINEERING, 1971, 16 (08): : 685 - &
  • [26] A CHANCE CONSTRAINED INTEGER PROGRAMMING MODEL FOR OPEN PIT LONG-TERM PRODUCTION PLANNING
    Gholamnejad, J.
    Osanloo, M.
    Khorram, E.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2008, 21 (04): : 407 - 418
  • [27] A chance constrained Integer programming model for open pit long-term production planning
    Department of Mining and Metallurgical Engineering, Yazd University, P.O. Box 89195-741, Yazd, Iran
    不详
    不详
    Int. J. Eng. Trans. A Basics, 2008, 4 (407-418):
  • [28] A linear model for operations planning under programmed long breakdowns
    Iglesias, S
    González-Torre, PL
    Adenso-Díaz, B
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2001, 8 (04): : 272 - 278
  • [29] A mixed integer linear programming model applied in barge planning for Omya
    Bredstrom, David
    Haugen, Kjetil
    Olstad, Asmund
    Novotny, Jan
    OPERATIONS RESEARCH PERSPECTIVES, 2015, 2 : 150 - 155
  • [30] Risk explicit interval linear programming model for long-term planning of vehicle recycling in the EU legislative context under uncertainty
    Simic, Vladimir
    Dimitrijevic, Branka
    RESOURCES CONSERVATION AND RECYCLING, 2013, 73 : 197 - 210